108 S MATHEWS ST 90033

Certificate Information: 108 S MATHEWS ST 90033

Application / Permit
19016-10000-28826
Plan Check / Job No.
B19LA19181
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT-STORY SEISMIC RETROFIT PER LAMC DIVISION 93. INSTALLATION OF 3 SPECIAL CANTILEVERED COLUMN SYSTEM (SCCS) WITH CONCRETE GRADE BEAM. WORKS AT TUCK-UNDER PARKING AREAS, NOT ON TENANTS' UNITS.
Permit Issued
Issued on 10/29/2020
Issuing Office
Current Status
CofC Issued on 12/31/2025

Permit Application Status History

Submitted 9/11/2019 APPLICANT
Assigned to Plan Check Engineer 10/16/2019 ERWIN PASCUA
Corrections Issued 10/20/2019 ERWIN PASCUA
Quality Review Completed 10/24/2019 SAI KHUM
Building Plans Picked Up 10/31/2019 APPLICANT
Applicant returned to address corrections 1/16/2020 ERWIN PASCUA
Applicant returned to address corrections 2/6/2020 ERWIN PASCUA
Plan Check Approved 4/28/2020 ERWIN PASCUA
Issued 10/29/2020 APPLICANT
OK for CofC 12/29/2025 DARRYL ARNOLD
CofC Issued 12/31/2025 ERNESTO CORRAL

Permit Application Clearance Information

Project located in CRA area Cleared 3/2/2020 GISELLE CORELLA
ZI Cleared 3/2/2020 GISELLE CORELLA
Metro Rail approval Cleared 4/15/2020 ERWIN PASCUA
Housing rent stabilization Cleared 10/26/2020 MICHAEL SOTO

Contact Information

Contractor Retrofit 1; Lic. No.: 1003868-B 19326 VENTURA BLVD STE 200      TARZANA, CA 91356
Engineer Ni,, Zhang Yuan; Lic. No.: C68149 743 S SIERRA VISTA AVE C      ALHAMBRA, CA 91801

Inspector Information

DARRYL ARNOLD, (213) 482-0341 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/6/2025 Not Ready for Inspection DARRYL ARNOLD
Pre-Inspection 8/8/2025 Corrections Issued DARRYL ARNOLD
Footing/Foundation/Slab 9/26/2025 Approved DARRYL ARNOLD
Structural Steel Frame 9/26/2025 Conditional Approval DARRYL ARNOLD
Wood Frame 9/26/2025 Approved DARRYL ARNOLD
Footing/Foundation/Slab 11/10/2025 Corrections Issued DARRYL ARNOLD
Structural Steel Frame 11/10/2025 Conditional Approval DARRYL ARNOLD
Wood Frame 11/10/2025 Conditional Approval DARRYL ARNOLD
Floor/Roof Diaphrgm/Shear Wall 11/14/2025 Approved DARRYL ARNOLD
Interior/Exterior Lathing 11/14/2025 Approved DARRYL ARNOLD
Interior/Exterior Lathing 11/19/2025 Conditional Approval DARRYL ARNOLD
Final 12/29/2025 OK for CofC DARRYL ARNOLD
METHANE-Final 12/29/2025 Approved DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 12/29/2025 SGSOV Approved DARRYL ARNOLD
Smoke Detectors 12/29/2025 Approved DARRYL ARNOLD