Pre-Inspection
|
9/21/2020
|
Approved
|
ALAN NOVAK
|
|
Pre-Inspection
|
9/25/2020
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Pre-Stress Concrete
|
9/30/2020
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Pre-Stress Concrete
|
10/1/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/8/2020
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/8/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
10/8/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/9/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/15/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
10/16/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
10/20/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Concrete
|
10/23/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Footing/Foundation/Slab
|
10/23/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
10/28/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Green Building Rough
|
11/13/2020
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Reinforced Concrete Frame
|
11/13/2020
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
11/24/2020
|
Conditional Approval
|
RICKEY JACKSON
|
|
Deputy Pre-Stress Concrete
|
12/2/2020
|
Approved
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
12/2/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Pre-Stress Concrete
|
12/3/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
12/4/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
12/7/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Concrete
|
12/8/2020
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
12/8/2020
|
Approved
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
12/8/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
12/9/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
12/9/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Concrete
|
12/10/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Concrete
|
12/11/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
12/11/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Green Building Rough
|
12/11/2020
|
Not Ready for Inspection
|
HAMID PISHEHVAR
|
|
Reinforced Masonry Frame
|
12/11/2020
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Structural Steel Frame
|
12/11/2020
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Concrete
|
12/14/2020
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
12/14/2020
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
12/15/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
12/15/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Concrete
|
12/16/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
12/16/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Concrete
|
12/17/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
12/17/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Concrete
|
12/18/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
12/18/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Green Building Rough
|
12/18/2020
|
Not Ready for Inspection
|
HAMID PISHEHVAR
|
|
Reinforced Concrete Frame
|
12/18/2020
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Reinforced Masonry Frame
|
12/18/2020
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Concrete
|
12/22/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
12/22/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
1/5/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
1/6/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
1/7/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Reinforced Concrete Frame
|
1/7/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Pre-Stress Concrete
|
1/8/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
1/11/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Concrete
|
1/11/2021
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Pre-Stress Concrete
|
1/12/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
1/12/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Green Building Rough
|
1/12/2021
|
Not Ready for Inspection
|
HAMID PISHEHVAR
|
|
Reinforced Concrete Frame
|
1/12/2021
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
1/13/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
1/13/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
1/14/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
1/14/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
1/15/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
1/15/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
1/19/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
1/19/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Green Building Rough
|
1/19/2021
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Reinforced Concrete Frame
|
1/19/2021
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
1/20/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
1/20/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
1/21/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
1/21/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Structural Steel Frame
|
1/21/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
1/22/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
1/22/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
1/25/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
1/25/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Green Building Rough
|
1/25/2021
|
Not Ready for Inspection
|
HAMID PISHEHVAR
|
|
Reinforced Masonry Frame
|
1/25/2021
|
Not Ready for Inspection
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
1/26/2021
|
No Access for Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
1/26/2021
|
No Access for Inspection
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
2/2/2021
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Masonry
|
2/2/2021
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
2/2/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
2/2/2021
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
2/3/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/3/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
2/3/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
2/4/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
2/4/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
2/5/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/5/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
2/5/2021
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
2/5/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
2/8/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/8/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
2/9/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Structural Steel Frame
|
2/9/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
2/10/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/10/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Structural Steel Frame
|
2/10/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
2/11/2021
|
Approved
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/11/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
2/12/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/12/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
2/12/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
2/12/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
2/16/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
2/16/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/16/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Structural Steel Frame
|
2/16/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
2/17/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/17/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
2/18/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/18/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
2/18/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
2/18/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
2/19/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/19/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
2/22/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/22/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
2/22/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
2/22/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
2/23/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/23/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
2/24/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/24/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Structural Steel Frame
|
2/24/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
2/25/2021
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
2/25/2021
|
Approved
|
ROBERT DAVIS
|
|
Green Building Rough
|
2/25/2021
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
2/25/2021
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Pre-Stress Concrete
|
2/26/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
2/26/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
3/1/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/1/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
3/2/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/2/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
3/2/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
3/2/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Structural Steel Frame
|
3/2/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
3/3/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/3/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
3/4/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/4/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/5/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
3/8/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/8/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
3/8/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
3/8/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
3/8/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Structural Steel Frame
|
3/8/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
3/9/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Light Gage Steel Frame
|
3/9/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Green Building Rough
|
3/10/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
3/10/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
3/11/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/11/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
3/11/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Structural Steel Frame
|
3/11/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
3/12/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/12/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
3/15/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/15/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
3/15/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
3/16/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/16/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
3/19/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/19/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
3/19/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
3/19/2021
|
Order to Comply Issued
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
3/22/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
3/22/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Piling/Pier/Caisson
|
3/22/2021
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Structural Steel Frame
|
3/22/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
3/23/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/23/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
3/24/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/24/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
3/24/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
3/25/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/25/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
3/26/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/26/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
3/26/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
3/26/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Structural Steel Frame
|
3/26/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
3/30/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/30/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
3/31/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/31/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
3/31/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
3/31/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
3/31/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/1/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/1/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/5/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/5/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
4/5/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
4/5/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
4/5/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
4/5/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/6/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/6/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
4/6/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
4/6/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/7/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/7/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
4/7/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/8/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/8/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
4/8/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
4/8/2021
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
4/8/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/9/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/9/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
4/9/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/12/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/12/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/14/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
4/14/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/15/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/15/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
4/19/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/19/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
4/19/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
4/19/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/20/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/20/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/21/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/21/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Structural Steel Frame
|
4/21/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/22/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/22/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/23/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/23/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/26/2021
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Reinf. Masonry
|
4/26/2021
|
Conditional Approval
|
JEFFREY FULTON
|
|
Green Building Rough
|
4/26/2021
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
4/26/2021
|
Partial Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
4/26/2021
|
Partial Inspection
|
JEFFREY FULTON
|
|
Structural Steel Frame
|
4/26/2021
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Pre-Stress Concrete
|
4/27/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/27/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/28/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/28/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
4/28/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
4/29/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
4/29/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
4/29/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
5/3/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
5/3/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/4/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/4/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/5/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/5/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
5/5/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
5/5/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/6/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
5/6/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
5/7/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/10/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/10/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
5/10/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/11/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/11/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/12/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/12/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/13/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/13/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
5/13/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
5/13/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
5/13/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/14/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/14/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/17/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/17/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Structural Steel Frame
|
5/17/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/18/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
5/18/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
5/19/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
5/19/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Drywall Nailing
|
5/19/2021
|
Not Ready for Inspection
|
HAMID PISHEHVAR
|
|
Green Building Rough
|
5/19/2021
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Reinforced Concrete Frame
|
5/19/2021
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
5/20/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/20/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
5/20/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/24/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/24/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/25/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
5/25/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
5/26/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
5/26/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Green Building Rough
|
5/26/2021
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Reinforced Concrete Frame
|
5/26/2021
|
Partial Approval
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
5/27/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Masonry
|
5/27/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Footing/Foundation/Slab
|
5/27/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Pre-Stress Concrete
|
5/28/2021
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Reinf. Masonry
|
5/28/2021
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Pre-Stress Concrete
|
6/1/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/1/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
6/2/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
6/2/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
6/3/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
6/4/2021
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
6/7/2021
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Pre-Stress Concrete
|
6/8/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
6/8/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
6/8/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
6/9/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
6/17/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Concrete
|
6/18/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Green Building Rough
|
6/18/2021
|
Approved
|
ALAN NOVAK
|
|
Reinforced Concrete Frame
|
6/18/2021
|
Partial Approval
|
ALAN NOVAK
|
|
Masonry Wall/Backfill
|
6/22/2021
|
Partial Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
6/22/2021
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
6/23/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
6/24/2021
|
Approved
|
HAMID PISHEHVAR
|
|
Deputy Reinf. Concrete
|
6/25/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
7/1/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
7/1/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
7/7/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
7/8/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
7/9/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
7/14/2021
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
7/15/2021
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
7/15/2021
|
Conditional Approval
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
7/15/2021
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Steel/Welding
|
7/16/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
7/20/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
7/20/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
7/21/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
7/21/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
7/22/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
7/23/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
7/23/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
7/28/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
7/29/2021
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
7/29/2021
|
Conditional Approval
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
7/29/2021
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
7/30/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
7/30/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/4/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/5/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/6/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
8/9/2021
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/10/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/11/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/12/2021
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
8/13/2021
|
Conditional Approval
|
KENNETH ROBERTS
|
|
Deputy Steel/Welding
|
8/16/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
8/17/2021
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
8/18/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/18/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/19/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/20/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/23/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Protected Tree Letter
|
8/23/2021
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/24/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/25/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/26/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/27/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
8/30/2021
|
Conditional Approval
|
KENNETH ROBERTS
|
|
Deputy Steel/Welding
|
8/31/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
9/1/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
9/2/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
9/3/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Pre-Stress Concrete
|
9/8/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/8/2021
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
9/17/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Steel/Welding
|
9/20/2021
|
Conditional Approval
|
ALAN NOVAK
|
|
Reinforced Masonry Frame
|
1/14/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
2/9/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
2/9/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
4/1/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/1/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Insulation
|
4/1/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
4/4/2022
|
Partial Approval
|
CAMERON CHABAN
|
|
Drywall Nailing
|
8/18/2022
|
Approved
|
CAMERON CHABAN
|
|
Light Gage Steel Frame
|
8/18/2022
|
Approved
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
12/16/2022
|
Conditional Approval
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
5/30/2023
|
Not Ready for Inspection
|
BRIAN KELLY
|
|
Final
|
6/30/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Green Building Final
|
6/30/2023
|
Approved
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
6/30/2023
|
Approved
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
6/30/2023
|
Approved
|
CAMERON CHABAN
|
|
SGSOV-Seismic Gas S/O Valve
|
6/30/2023
|
SGSOV No Gas
|
CAMERON CHABAN
|
|
Smoke Detectors
|
6/30/2023
|
Approved
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
7/6/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Final
|
2/15/2024
|
OK to Issue CofO
|
CAMERON CHABAN
|