1519 S FAIRFAX AVE 90019

Certificate Information: 1519 S FAIRFAX AVE 90019

Application / Permit
19016-10000-25833
Plan Check / Job No.
B19LA17344
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT PER LABC CHAPTER 93. INSTALL STEEL CANTILEVER COLUMN.
Permit Issued
Issued on 11/5/2020
Issuing Office
Current Status
CofC Issued on 7/26/2021

Permit Application Status History

Submitted 8/19/2019 APPLICANT
Assigned to Plan Check Engineer 9/25/2019 MANUEL MONTUFAR
Corrections Issued 10/1/2019 MANUEL MONTUFAR
Quality Review Completed 10/4/2019 HANS SANTIAGO
Plan Check Approved 10/11/2019 MANUEL MONTUFAR
Issued 11/5/2020 APPLICANT
OK for CofC 7/21/2021 BRUCE CAMPBELL
CofC Issued 7/26/2021 WINSTON DUNNING

Permit Application Clearance Information

Housing rent stabilization Cleared 11/5/2020 STEVEN HOFSTAD

Contact Information

Contractor Cal - Quake Construction Inc; Lic. No.: 759817-B 636 NORTH FORMOSA AVENUE      LOS ANGELES, CA 90036
Engineer Ni,, Zhang Yuan; Lic. No.: C68149 743 S SIERRA VISTA AVE C      ALHAMBRA, CA 91801

Inspector Information

DARRYL ARNOLD, (213) 482-0341 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 3/11/2021 Approved DARRYL ARNOLD
Excavation/Setback/Form/Re-Bar 3/25/2021 Approved DARRYL ARNOLD
Structural Steel Frame 3/25/2021 Approved DARRYL ARNOLD
Wood Frame 3/25/2021 Approved DARRYL ARNOLD
Deputy Reinf. Concrete 3/26/2021 Conditional Approval MARK FERRARI
Drywall Nailing 4/15/2021 Conditional Approval DARRYL ARNOLD
Final 4/20/2021 Partial Inspection JONATHAN QUACH
METHANE-Final 4/20/2021 Approved JONATHAN QUACH
SGSOV-Seismic Gas S/O Valve 4/20/2021 SGSOV Not Ready JONATHAN QUACH
Smoke Detectors 4/20/2021 Approved JONATHAN QUACH
Final 7/21/2021 OK for CofC BRUCE CAMPBELL
SGSOV-Seismic Gas S/O Valve 7/21/2021 SGSOV Approved BRUCE CAMPBELL