5745 S WESTERN AVE 90062

Certificate Information: 5745 S WESTERN AVE 90062

Application / Permit
19016-10000-24252
Plan Check / Job No.
B19LA16206
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT PER LABC CH 93. INSTALL (2) SCCS.
Permit Issued
Issued on 7/22/2022
Issuing Office
Metro
Current Status
CofC Issued on 9/1/2022

Permit Application Status History

Submitted 8/5/2019 APPLICANT
Assigned to Plan Check Engineer 9/11/2019 DANIEL YIP
Corrections Issued 9/16/2019 DANIEL YIP
Quality Review Completed 9/17/2019 HANS SANTIAGO
Building Plans Picked Up 9/24/2019 APPLICANT
Applicant returned to address corrections 10/15/2019 DANIEL YIP
Plan Check Approved 10/17/2019 DANIEL YIP
Issued 7/22/2022 APPLICANT
OK for CofC 8/31/2022 DARRYL ARNOLD
CofC Issued 9/1/2022 WINSTON DUNNING

Permit Application Clearance Information

Community Plan Implem. Overlay Cleared 10/16/2019 ELAINE LEI
Community Plan Implem. Overlay Cleared 10/16/2019 JOE LUCKEY
Encroachment in public way Cleared 10/16/2019 ELAINE LEI
Eng Process Fee Ord 176,300 Cleared 10/16/2019 ELAINE LEI
Work Adjacent to Public Way Cleared 10/16/2019 BOK GOH
Project located in CRA area Cleared 10/17/2019 JIM URQUHART
Housing rent stabilization Cleared 7/21/2022 RICARDO BOHORQUEZ

Contact Information

Contractor Optimum Seismic Inc; Lic. No.: 1012702-B 5508 S SANTA FE AVENUE      VERNON, CA 90058
Engineer Mirmohammadsadeghi,, Kamaleddin; Lic. No.: C53468 1377 S BEVERLY GLEN BLVD 308      LOS ANGELES, CA 90024
Engineer Ni,, Zhang Yuan; Lic. No.: C68149 743 S SIERRA VISTA AVE C      ALHAMBRA, CA 91801

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/11/2022 Conditional Approval DARRYL ARNOLD
Deputy Steel/Welding 8/16/2022 Conditional Approval DARRYL ARNOLD
Deputy Drilled-In Anchors 8/18/2022 Conditional Approval DARRYL ARNOLD
Footing/Foundation/Slab 8/18/2022 Conditional Approval DARRYL ARNOLD
Wood Frame 8/18/2022 Conditional Approval DARRYL ARNOLD
Deputy Reinf. Concrete 8/22/2022 Conditional Approval DARRYL ARNOLD
Final 8/22/2022 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 8/22/2022 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 8/22/2022 Corrections Issued DARRYL ARNOLD
Interior/Exterior Lathing 8/25/2022 Conditional Approval DARRYL ARNOLD
Final 8/31/2022 OK for CofC DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 8/31/2022 SGSOV Approved DARRYL ARNOLD
Smoke Detectors 8/31/2022 Approved DARRYL ARNOLD