11580 W GATEWAY BLVD 90064

Certificate Information: 11580 W GATEWAY BLVD 90064

Application / Permit
19016-10000-23548
Plan Check / Job No.
B19LA15737
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT-STORY SEISMIC RETROFIT PER LAMC DIVISION 93. INSTALLATION OF 1 ORDINARY MOMENT FRAME WITH CONCRETE GRADE BEAM AND WOOD SHEAR WALLS. TENANTS WILL BE AFFECTED IN THE INSTALLATION OF (N) WOOD SHEAR WALLS.
Permit Issued
Issued on 4/15/2020
Issuing Office
Metro
Current Status
CofC Issued on 10/27/2020

Permit Application Status History

Submitted 7/30/2019 APPLICANT
Assigned to Plan Check Engineer 9/4/2019 ERWIN PASCUA
Corrections Issued 9/10/2019 ERWIN PASCUA
Quality Review Completed 9/11/2019 SAI KHUM
Building Plans Picked Up 9/13/2019 APPLICANT
Plan Check Approved 2/28/2020 ERWIN PASCUA
Issued 4/15/2020 LADBS
OK for CofC 10/26/2020 GRANT WOODS
CofC Issued 10/27/2020 TED RIES

Permit Application Clearance Information

Housing rent stabilization Cleared 3/31/2020 MICHAEL GREGERSON

Contact Information

Contractor Sinai Construction; Lic. No.: 1035535-B 5142 VENICE BLVD      LOS ANGELES, CA 90019
Engineer Marrs,, Nicholas Reidar; Lic. No.: C83398 1150 GENEVA ST      LIVERMORE, CA 94550

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/8/2020 Approved GRANT WOODS
Deputy Other (see comments) 6/8/2020 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 6/10/2020 Approved GRANT WOODS
Excavation/Setback/Form/Re-Bar 6/10/2020 Approved GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 6/10/2020 Not Ready for Inspection GRANT WOODS
Footing/Foundation/Slab 6/10/2020 Approved GRANT WOODS
Structural Steel Frame 6/10/2020 Not Ready for Inspection GRANT WOODS
Deputy Wood Construction 6/12/2020 Conditional Approval SORIN CIRSTOIU
Drywall Nailing 6/15/2020 Not Ready for Inspection GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 6/15/2020 Not Ready for Inspection GRANT WOODS
Insulation 6/15/2020 Approved GRANT WOODS
Wood Frame 6/15/2020 Partial Approval GRANT WOODS
Deputy Wood Construction 6/17/2020 Approved GRANT WOODS
Drywall Nailing 6/17/2020 Approved GRANT WOODS
Wood Frame 6/17/2020 Partial Approval GRANT WOODS
Deputy Wood Construction 6/18/2020 Approved GRANT WOODS
Floor/Roof Diaphrgm/Shear Wall 6/18/2020 Partial Approval GRANT WOODS
Deputy Wood Construction 6/22/2020 Approved GRANT WOODS
Interior/Exterior Lathing 6/22/2020 Approved GRANT WOODS
Deputy Drilled-In Anchors 7/24/2020 Conditional Approval ALAN NOVAK
Final 8/10/2020 Partial Inspection GRANT WOODS
SGSOV-Seismic Gas S/O Valve 8/10/2020 SGSOV Not Ready GRANT WOODS
Smoke Detectors 8/10/2020 Approved GRANT WOODS
Final 8/25/2020 Conditional Approval GRANT WOODS
SGSOV-Seismic Gas S/O Valve 8/25/2020 SGSOV Approved GRANT WOODS
Final 10/26/2020 OK for CofC GRANT WOODS