11926 W GOSHEN AVE 90049

Certificate Information: 11926 W GOSHEN AVE 90049

Application / Permit
19016-10000-19026
Plan Check / Job No.
B19LA12964
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT PER LABC CHAPTER 93. INSTALL STEEL CANTILEVER COLUMNS AND STEEL MOMENT FRAMES.
Permit Issued
Issued on 12/21/2022
Issuing Office
Current Status
CofC Issued on 2/13/2024

Permit Application Status History

Submitted 7/10/2019 APPLICANT
Assigned to Plan Check Engineer 7/24/2019 MANUEL MONTUFAR
Corrections Issued 8/1/2019 MANUEL MONTUFAR
Quality Review Completed 8/3/2019 HANS SANTIAGO
Plan Check Approved 4/10/2020 MANUEL MONTUFAR
Issued 12/21/2022 APPLICANT
OK for CofC 2/8/2024 MICHAEL PETRUSKO
CofC Issued 2/13/2024 DAVID TSAU

Permit Application Clearance Information

Housing rent stabilization Cleared 8/17/2022 RICARDO BOHORQUEZ

Contact Information

Contractor Arka Construction Inc; Lic. No.: 824921-B 10801 NATIONAL BLVD #227      LOS ANGELES, CA 90064
Engineer Perez,, Manuel Armando; Lic. No.: C73786 20850 SORRENTO LN      PORTER RANCH, CA 91326

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/17/2023 Approved ALAN NOVAK
Footing/Foundation/Slab 1/27/2023 Not Ready for Inspection ALAN NOVAK
Deputy Drilled-In Anchors 1/31/2023 Approved SHAVONNE ESPINOZA
Footing/Foundation/Slab 1/31/2023 Partial Approval ALAN NOVAK
Deputy Steel/Welding 2/9/2023 Conditional Approval SHAVONNE ESPINOZA
Footing/Foundation/Slab 3/3/2023 Not Ready for Inspection GRANT WOODS
Wood Frame 3/3/2023 Not Ready for Inspection GRANT WOODS
Wood Frame 3/6/2023 Approved MICHAEL PETRUSKO
Deputy Reinf. Concrete 3/15/2023 Conditional Approval ALAN NOVAK
Footing/Foundation/Slab 3/15/2023 Not Ready for Inspection ALAN NOVAK
Deputy Reinf. Concrete 3/16/2023 Conditional Approval ALAN NOVAK
Footing/Foundation/Slab 3/16/2023 Approved ALAN NOVAK
Deputy Drilled-In Anchors 4/24/2023 Partial Approval ALAN NOVAK
Deputy Steel/Welding 4/24/2023 Partial Approval ALAN NOVAK
Final 11/17/2023 Not Ready for Inspection MICHAEL PETRUSKO
SGSOV-Seismic Gas S/O Valve 11/17/2023 SGSOV Not Ready MICHAEL PETRUSKO
Smoke Detectors 11/17/2023 Not Ready for Inspection MICHAEL PETRUSKO
Final 2/1/2024 Not Ready for Inspection MICHAEL PETRUSKO
SGSOV-Seismic Gas S/O Valve 2/1/2024 SGSOV Not Ready MICHAEL PETRUSKO
Smoke Detectors 2/1/2024 Not Ready for Inspection MICHAEL PETRUSKO
Final 2/8/2024 OK for CofC MICHAEL PETRUSKO
SGSOV-Seismic Gas S/O Valve 2/8/2024 SGSOV Approved MICHAEL PETRUSKO
Smoke Detectors 2/8/2024 Approved MICHAEL PETRUSKO