14632 W KITTRIDGE ST 91405

Certificate Information: 14632 W KITTRIDGE ST 91405

Application / Permit
19016-10000-13022
Plan Check / Job No.
B19LA08945
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT AS PER LABC CH. 93 USING 3 SCCS AND 3 SIMPSON STRONG WALLS.
Permit Issued
Issued on 1/22/2020
Issuing Office
Metro
Current Status
CofC Issued on 8/3/2020

Permit Application Status History

Submitted 5/2/2019 APPLICANT
Assigned to Plan Check Engineer 5/15/2019 EVERARDO SANTOS
Corrections Issued 5/20/2019 EVERARDO SANTOS
Quality Review Completed 5/21/2019 HANS SANTIAGO
Building Plans Picked Up 5/28/2019 APPLICANT
Plan Check Approved 6/28/2019 EVERARDO SANTOS
No Progress 12/20/2019 EVERARDO SANTOS
Plan Check Approved 12/20/2019 EVERARDO SANTOS
Issued 1/22/2020 LADBS
OK for CofC 7/1/2020 DANIEL VARNUM
CofC Issued 8/3/2020 DAVID TSAU

Permit Application Clearance Information

Housing rent stabilization Cleared 8/1/2019 ISMAEL HERNANDEZ

Contact Information

Contractor Alpha Structural Inc; Lic. No.: 663409-B 8334 FOOTHILL BLVD      SUNLAND, CA 91040
Engineer Alam,, Anwar; Lic. No.: S5719 372 FLORAL VIEW      IRVINE, CA 92618

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/18/2020 Approved KENNETH ROBERTS
Deputy Drilled-In Anchors 3/10/2020 Conditional Approval KENNETH ROBERTS
Floor/Roof Diaphrgm/Shear Wall 3/10/2020 Partial Approval KENNETH ROBERTS
Deputy Reinf. Concrete 3/11/2020 Conditional Approval CHRISTOPHER DELLEFIELD
Floor/Roof Diaphrgm/Shear Wall 3/13/2020 Partial Approval KENNETH ROBERTS
Deputy Wood Construction 3/20/2020 Conditional Approval DANIEL VARNUM
Floor/Roof Diaphrgm/Shear Wall 3/24/2020 Corrections Issued BRUCE CAMPBELL
Deputy Steel/Welding 4/9/2020 Approved HAMID PISHEHVAR
Interior/Exterior Lathing 5/21/2020 Approved DANIEL VARNUM
Final 7/1/2020 OK for CofC DANIEL VARNUM
SGSOV-Seismic Gas S/O Valve 7/1/2020 SGSOV Approved DANIEL VARNUM
Smoke Detectors 7/1/2020 Approved DANIEL VARNUM
Final 7/6/2020 Partial Approval DANIEL VARNUM
SGSOV-Seismic Gas S/O Valve 7/6/2020 SGSOV Approved DANIEL VARNUM
Smoke Detectors 7/6/2020 Approved DANIEL VARNUM