2051 S PROSSER AVE 90025

Certificate Information: 2051 S PROSSER AVE 90025

Application / Permit
19016-10000-12811
Plan Check / Job No.
B19LA08807
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
KITCHEN AND BATHROOM REMODEL AT EXISTING SFD. EXTERIOR ALTERATIONS AT WINDOW AND DOOR OPENINGS.
Permit Issued
Issued on 1/16/2020
Issuing Office
West Los Angeles
Current Status
Permit Finaled on 8/21/2020

Permit Application Status History

Submitted 5/1/2019 APPLICANT
Assigned to Plan Check Engineer 5/1/2019 KEVIN MORALES
Corrections Issued 5/1/2019 KEVIN MORALES
Plan Check Approved 9/6/2019 GEORGE ALVAREZ
Issued 1/16/2020 LADBS
Permit Finaled 8/21/2020 GERMAN RODRIGUEZ MENDOZA

Permit Application Clearance Information

Grading Pre-Inspection Cleared 5/1/2019 KEVIN MORALES
Eng Process Fee Ord 176,300 Cleared 5/9/2019 STEVEN JIN
Miscellaneous Cleared 10/11/2019 OSCAR GUTIERREZ

Contact Information

Contractor Integrity Remodeling; Lic. No.: 822562-B 4167 CENTER STREET      CULVER CITY, CA 90232
Engineer Christiansen,, Scott; Lic. No.: C37989 1003 WILSHIRE BLVD 202      SANTA MONICA, CA 90401

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 2/7/2020 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Floor/Roof Diaphrgm/Shear Wall 2/20/2020 Partial Approval GERMAN RODRIGUEZ MENDOZA
PLUMBING-Rough 2/20/2020 Partial Approval GERMAN RODRIGUEZ MENDOZA
ELECTRICAL-Rough 3/27/2020 Approved GERMAN RODRIGUEZ MENDOZA
HVAC-Rough 3/27/2020 Approved GERMAN RODRIGUEZ MENDOZA
PLUMBING-Rough 3/27/2020 Approved GERMAN RODRIGUEZ MENDOZA
BUILDING-Rough-Frame 4/1/2020 Approved GERMAN RODRIGUEZ MENDOZA
Interior/Exterior Lathing 4/1/2020 Partial Approval GERMAN RODRIGUEZ MENDOZA
Insulation 4/3/2020 Approved GERMAN RODRIGUEZ MENDOZA
Drywall Nailing 4/13/2020 Approved GERMAN RODRIGUEZ MENDOZA
Interior/Exterior Lathing 4/16/2020 Approved GERMAN RODRIGUEZ MENDOZA
Shower Pan 4/16/2020 Approved GERMAN RODRIGUEZ MENDOZA
Final 8/21/2020 Permit Finaled GERMAN RODRIGUEZ MENDOZA
SGSOV-Seismic Gas S/O Valve 8/21/2020 SGSOV Approved GERMAN RODRIGUEZ MENDOZA
Smoke Detectors 8/21/2020 Approved GERMAN RODRIGUEZ MENDOZA