1615-1621 N HARVARD BLVD 90027

Certificate Information: 1615-1621 N HARVARD BLVD 90027

Application / Permit
19016-10000-06088
Plan Check / Job No.
B19LA04349
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT AS PER LABC CHAPTER 93. INSTALL (N) SCCS AND (N) SHEAR WALLS
Permit Issued
Issued on 1/27/2022
Issuing Office
Current Status
CofC Issued on 9/18/2023

Permit Application Status History

Submitted 3/4/2019 APPLICANT
Assigned to Plan Check Engineer 3/27/2019 HANS SANTIAGO
Corrections Issued 4/1/2019 HANS SANTIAGO
Quality Review Completed 4/2/2019 SAI KHUM
Plan Check Approved 4/29/2019 Andrew Santiago
Issued 1/27/2022 APPLICANT
Building Plans Picked Up 1/31/2022 APPLICANT
OK for CofC 9/8/2023 VAHE KELEDJIAN
CofC Issued 9/18/2023 WINSTON DUNNING

Permit Application Clearance Information

Housing rent stabilization Cleared 1/21/2022 ISMAEL HERNANDEZ

Contact Information

Contractor Retrofit 1; Lic. No.: 1003868-B 19326 VENTURA BLVD STE 200      TARZANA, CA 91356
Engineer Ni,, Zhang Yuan; Lic. No.: C68149 743 S SIERRA VISTA AVE C      ALHAMBRA, CA 91801

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/23/2023 Approved BRUCE CAMPBELL
Deputy Steel/Welding 3/22/2023 Conditional Approval BRUCE CAMPBELL
Footing/Foundation/Slab 3/24/2023 Corrections Issued VAHE KELEDJIAN
Structural Steel Frame 3/24/2023 Not Ready for Inspection VAHE KELEDJIAN
Wood Frame 3/24/2023 Corrections Issued VAHE KELEDJIAN
Footing/Foundation/Slab 3/28/2023 Approved VAHE KELEDJIAN
Structural Steel Frame 3/28/2023 Conditional Approval VAHE KELEDJIAN
Wood Frame 3/28/2023 Conditional Approval VAHE KELEDJIAN
Deputy Drilled-In Anchors 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 4/10/2023 Conditional Approval MICHAEL ROSENBERG
Interior/Exterior Lathing 5/24/2023 Partial Inspection VAHE KELEDJIAN
Interior/Exterior Lathing 6/14/2023 Not Ready for Inspection DARRYL ARNOLD
Interior/Exterior Lathing 6/16/2023 Approved DARRYL ARNOLD
Final 7/13/2023 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 7/13/2023 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 7/13/2023 Conditional Approval DARRYL ARNOLD
Final 9/8/2023 OK for CofC VAHE KELEDJIAN
SGSOV-Seismic Gas S/O Valve 9/8/2023 SGSOV Approved VAHE KELEDJIAN
Smoke Detectors 9/8/2023 Approved VAHE KELEDJIAN