921 S BEACON ST 90731

Certificate Information: 921 S BEACON ST 90731

Application / Permit
19016-10000-04058
Plan Check / Job No.
B19LA02919
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
PROPOSED SEISMIC RETROFIT PER DIVISION 95, CHANGE OF USE FROM AN EXISTING HOME FOR THE AGED TO A MIXED USE (APARTMENT AND RESTAURANT BUILDING) 100 UNITS (10 UNITS SET ASIDE FOR VERY LOW INCOME UNITS:104/212/214/216/304/319/400/406/502/518)
Permit Issued
Issued on 9/11/2021
Issuing Office
Current Status
CofO Issued on 8/14/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/12/2019 APPLICANT
Assigned to Plan Check Engineer 2/28/2019 JOHN VASQUEZ
Corrections Issued 3/14/2019 JOHN VASQUEZ
Quality Review Completed 3/15/2019 CHARLES CHANG
Applicant returned to address corrections 6/27/2019 JOHN VASQUEZ
Applicant returned to address corrections 6/8/2020 JOHN VASQUEZ
Applicant returned to address corrections 1/6/2021 SUEN LIEU
Applicant returned to address corrections 1/7/2021 SUEN LIEU
Applicant returned to address corrections 1/22/2021 SUEN LIEU
Applicant returned to address corrections 1/29/2021 SUEN LIEU
Applicant returned to address corrections 2/2/2021 SUEN LIEU
Applicant returned to address corrections 2/5/2021 SUEN LIEU
Applicant returned to address corrections 2/9/2021 SUEN LIEU
Applicant returned to address corrections 2/26/2021 SUEN LIEU
Applicant returned to address corrections 3/17/2021 SUEN LIEU
Applicant returned to address corrections 3/19/2021 SUEN LIEU
Applicant returned to address corrections 4/6/2021 SUEN LIEU
Applicant returned to address corrections 4/13/2021 SUEN LIEU
Applicant returned to address corrections 4/20/2021 SUEN LIEU
Applicant returned to address corrections 5/4/2021 SUEN LIEU
Applicant returned to address corrections 5/17/2021 SUEN LIEU
Applicant returned to address corrections 5/18/2021 SUEN LIEU
Applicant returned to address corrections 5/21/2021 SUEN LIEU
Applicant returned to address corrections 9/1/2021 SUEN LIEU
Applicant returned to address corrections 9/2/2021 SUEN LIEU
Plan Check Approved 9/8/2021 SUEN LIEU
Issued 9/11/2021 APPLICANT
Building Plans Picked Up 9/15/2021 APPLICANT
TCO Issued (Expire Date: 01-25-2025) 7/29/2024 DAVID TSAU
Permit Finaled 8/14/2024 JOEY BUCHANAN
CofO Issued 8/14/2024 JOEY BUCHANAN
Permit Finaled 8/14/2024 JOEY BUCHANAN

Permit Application Clearance Information

Miscellaneous Cleared 9/3/2020 HAROOT AVANESIAN
Hydrant and Access approval Cleared 10/15/2020 MATTHEW CRAIG
City Hist. Cultural Monument Cleared 10/16/2020 LAMBERT GIESSINGER
HPOZ Cleared 10/16/2020 LAMBERT GIESSINGER
Hist. Property Cntrct Mgr Appr Cleared 10/16/2020 LAMBERT GIESSINGER
Historic monument Cleared 10/16/2020 LAMBERT GIESSINGER
Historic monument Cleared 10/16/2020 LAMBERT GIESSINGER
Historical monument Cleared 10/16/2020 LAMBERT GIESSINGER
ZI Cleared 10/16/2020 LAMBERT GIESSINGER
Address approval Cleared 11/12/2020 ERIK BEASLEY
Low Impact Development Cleared 1/15/2021 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 1/26/2021 ERIK BEASLEY
Eng Process Fee Ord 176,300 Cleared 1/28/2021 ERIK BEASLEY
Highway dedication Cleared 1/28/2021 ERIK BEASLEY
Sewer availability Cleared 1/28/2021 ERIK BEASLEY
"Q" conditions Cleared 2/2/2021 JOE LUCKEY
Coastal Zone Cleared 2/2/2021 JOE LUCKEY
Mello Bill Cleared 2/2/2021 JOE LUCKEY
Miscellaneous Cleared 2/2/2021 JOE LUCKEY
Opn space landscape/Water mgmt Cleared 2/2/2021 JOE LUCKEY
Prkng lot landscape/Water mgmt Cleared 2/2/2021 JOE LUCKEY
Site Plan review Cleared 2/2/2021 JOE LUCKEY
Specific Plan Cleared 2/2/2021 JOE LUCKEY
ZA Case Cleared 2/2/2021 JOE LUCKEY
ZA Case Cleared 2/2/2021 JOE LUCKEY
ZA Case Cleared 2/2/2021 JOE LUCKEY
ZI Cleared 2/2/2021 JOE LUCKEY
Project located in CRA area Cleared 2/25/2021 DAVID URITA
Density Bonus 12.22.A.31 Cleared 4/27/2021 JAMES MCCARTHY
Food Service Establishment Cleared 5/13/2021 PAWAN VERMA
Fire Marshall Fire Life Safety Cleared 6/1/2021 MENOA AGHAJANI
DAS Clearance Cleared 6/16/2021 JOHN VASQUEZ
Green Code Cleared 6/28/2021 AARON COSTA
Miscellaneous Cleared 7/20/2021 JOE LUCKEY

Contact Information

Architect Liljegren,, Karin J; Lic. No.: C28158 600 CRANE BLVD      LOS ANGELES, CA 90065
Contractor Owner-Builder       ,
Engineer Babayan,, Raffi Samuel; Lic. No.: C72168 7718 DAY STREET      LOS ANGELES, CA 91042
Engineer Mengelkoch,, Samuel Owen; Lic. No.: S5439 813 WILCOX AVE 203      LOS ANGELES, CA 90038
Landscape Architect Sparks,, Shelley E.; Lic. No.: LA2896 12224 ADDISON ST.      VALLEY VILLAGE, CA 91607

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Special/Order Compliance 1/12/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 2/24/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 2/28/2022 Conditional Approval DAVID TSAU
Deputy Drilled-In Anchors 3/1/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 3/3/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 3/4/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 3/10/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 3/14/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 3/18/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 3/21/2022 Approved JOEY BUCHANAN
Pre-Inspection 3/21/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 3/24/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 4/8/2022 Approved JOEY BUCHANAN
Deputy Shotcrete 4/15/2022 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 4/15/2022 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 4/15/2022 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 4/18/2022 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 4/18/2022 Approved JOEY BUCHANAN
Light Gage Steel Frame 4/20/2022 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 4/21/2022 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 4/25/2022 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 4/25/2022 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 4/26/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 4/26/2022 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 4/26/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 5/9/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 5/9/2022 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 5/9/2022 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 5/9/2022 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 5/11/2022 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 5/13/2022 Partial Approval JOEY BUCHANAN
Deputy Shotcrete 5/17/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 5/18/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 5/18/2022 Approved JOEY BUCHANAN
Deputy Shotcrete 5/18/2022 Approved JOEY BUCHANAN
Deputy Shotcrete 5/24/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 5/25/2022 Approved JOEY BUCHANAN
Deputy Steel/Welding 5/25/2022 Approved JOEY BUCHANAN
Deputy Steel/Welding 5/26/2022 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 5/27/2022 Corrections Issued JOEY BUCHANAN
Deputy Drilled-In Anchors 5/31/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 5/31/2022 Approved JOEY BUCHANAN
Deputy Shotcrete 6/1/2022 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 6/2/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 6/9/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 6/9/2022 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 6/9/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 6/10/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 6/10/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 6/13/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 6/13/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 6/14/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 6/14/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 6/15/2022 Approved JOEY BUCHANAN
Footing/Foundation/Slab 6/16/2022 Not Ready for Inspection JOEY BUCHANAN
Light Gage Steel Frame 6/16/2022 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 6/17/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 6/17/2022 Approved JOEY BUCHANAN
Green Building Rough 6/17/2022 Approved JOEY BUCHANAN
Masonry Wall/Backfill 6/17/2022 Not Ready for Inspection JOEY BUCHANAN
Reinforced Concrete Frame 6/17/2022 Not Ready for Inspection JOEY BUCHANAN
Reinforced Masonry Frame 6/17/2022 Not Ready for Inspection JOEY BUCHANAN
Reinforced Masonry Frame 6/17/2022 Off-Hour Fees Due
Wall Anchors 6/17/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 6/21/2022 Approved JOEY BUCHANAN
Deputy Shotcrete 6/21/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 6/22/2022 Conditional Approval DAVID TSAU
Deputy Other (see comments) 6/22/2022 Conditional Approval DAVID TSAU
Excavation/Setback/Form/Re-Bar 6/23/2022 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 6/23/2022 Partial Approval JOEY BUCHANAN
Deputy Other (see comments) 6/27/2022 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 6/27/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 6/29/2022 Conditional Approval DAVID TSAU
Deputy Other (see comments) 6/29/2022 Conditional Approval DAVID TSAU
Deputy Drilled-In Anchors 6/30/2022 Conditional Approval DAVID TSAU
Deputy Other (see comments) 6/30/2022 Conditional Approval DAVID TSAU
Deputy Drilled-In Anchors 7/1/2022 Conditional Approval DAVID TSAU
Deputy Other (see comments) 7/1/2022 Conditional Approval DAVID TSAU
Deputy Drilled-In Anchors 7/7/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 7/7/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 7/8/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 7/8/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 7/11/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 7/11/2022 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 7/11/2022 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 7/12/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 7/12/2022 Approved JOEY BUCHANAN
Deputy Steel/Welding 7/12/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 7/13/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 7/13/2022 Approved JOEY BUCHANAN
Deputy Steel/Welding 7/13/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 7/14/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 7/14/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 7/18/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 7/18/2022 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 7/18/2022 Partial Approval JOEY BUCHANAN
Deputy Other (see comments) 7/19/2022 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 7/19/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 7/20/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 7/20/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 7/21/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 7/21/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 7/25/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 7/25/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 7/26/2022 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 7/26/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 7/29/2022 Conditional Approval DAVID TSAU
Deputy Shotcrete 7/29/2022 Conditional Approval DAVID TSAU
Deputy Other (see comments) 8/2/2022 Conditional Approval DAVID TSAU
Deputy Reinf. Concrete 8/2/2022 Conditional Approval DAVID TSAU
Deputy Drilled-In Anchors 8/3/2022 Conditional Approval DAVID TSAU
Deputy Other (see comments) 8/3/2022 Conditional Approval DAVID TSAU
Deputy Drilled-In Anchors 8/4/2022 Conditional Approval DAVID TSAU
Deputy Other (see comments) 8/4/2022 Conditional Approval DAVID TSAU
Deputy Drilled-In Anchors 8/5/2022 Conditional Approval DAVID TSAU
Deputy Other (see comments) 8/5/2022 Conditional Approval DAVID TSAU
Deputy Other (see comments) 8/9/2022 Conditional Approval DAVID TSAU
Deputy Reinf. Concrete 8/9/2022 Conditional Approval DAVID TSAU
Excavation/Setback/Form/Re-Bar 8/11/2022 Not Ready for Inspection DAVID TSAU
Reinforced Concrete Frame 8/12/2022 Partial Approval DAVID TSAU
Deputy Drilled-In Anchors 8/15/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 8/15/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 8/16/2022 Approved JOEY BUCHANAN
Deputy Shotcrete 8/16/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 8/23/2022 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 8/23/2022 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 8/26/2022 Approved JOEY BUCHANAN
Deputy Other (see comments) 8/26/2022 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 8/26/2022 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 8/26/2022 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 8/30/2022 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 8/31/2022 Approved JOEY BUCHANAN
Deputy Steel/Welding 8/31/2022 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 9/15/2022 Partial Approval JOEY BUCHANAN
Deputy Steel/Welding 10/6/2022 Approved JOEY BUCHANAN
Light Gage Steel Frame 10/17/2022 Not Ready for Inspection JOEY BUCHANAN
Structural Steel Frame 10/17/2022 Not Ready for Inspection JOEY BUCHANAN
Light Gage Steel Frame 10/18/2022 Partial Approval JOEY BUCHANAN
Deputy Drilled-In Anchors 10/20/2022 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 10/20/2022 Approved JOEY BUCHANAN
Deputy Steel/Welding 10/20/2022 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 11/4/2022 Partial Approval JOEY BUCHANAN
Masonry Wall/Backfill 11/10/2022 Partial Approval JOEY BUCHANAN
Reinforced Masonry Frame 11/10/2022 Order to Comply Issued JOEY BUCHANAN
Reinforced Masonry Frame 12/1/2022 Partial Approval JOEY BUCHANAN
Deputy Reinf. Masonry 12/2/2022 Approved JOEY BUCHANAN
Masonry Wall/Backfill 12/7/2022 Partial Approval JOEY BUCHANAN
Reinforced Masonry Frame 12/7/2022 Partial Approval JOEY BUCHANAN
Deputy Reinf. Masonry 12/8/2022 Approved JOEY BUCHANAN
Light Gage Steel Frame 12/8/2022 Partial Approval JOEY BUCHANAN
Masonry Wall/Backfill 12/8/2022 Order to Comply Issued JOEY BUCHANAN
Reinforced Masonry Frame 12/8/2022 Partial Approval JOEY BUCHANAN
Structural Steel Frame 12/8/2022 Not Ready for Inspection JOEY BUCHANAN
Deputy Reinf. Masonry 12/9/2022 Approved AMANUEL BERHE
Deputy Reinf. Masonry 12/12/2022 Conditional Approval DAVID TSAU
Masonry Wall/Backfill 12/13/2022 Partial Approval JOEY BUCHANAN
Reinforced Concrete Frame 12/13/2022 Partial Approval JOEY BUCHANAN
Reinforced Masonry Frame 12/13/2022 Partial Approval JOEY BUCHANAN
Deputy Reinf. Masonry 12/15/2022 Approved JOEY BUCHANAN
Reinforced Masonry Frame 12/15/2022 Partial Approval JOEY BUCHANAN
Deputy Reinf. Masonry 12/16/2022 Approved AMANUEL BERHE
Deputy Reinf. Masonry 12/20/2022 Conditional Approval AMANUEL BERHE
Deputy Other (see comments) 12/22/2022 Partial Approval AMANUEL BERHE
Deputy Reinf. Masonry 12/22/2022 Partial Approval AMANUEL BERHE
Deputy Drilled-In Anchors 1/9/2023 Conditional Approval AMANUEL BERHE
Light Gage Steel Frame 1/12/2023 Partial Inspection AMANUEL BERHE
Light Gage Steel Frame 1/20/2023 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 1/24/2023 Partial Approval JOEY BUCHANAN
Deputy Steel/Welding 1/25/2023 Approved JOEY BUCHANAN
Floor/Roof Diaphrgm/Shear Wall 1/31/2023 Partial Approval JOEY BUCHANAN
Drywall Nailing 2/17/2023 Partial Inspection AMANUEL BERHE
Reinforced Masonry Frame 2/22/2023 Approved AMANUEL BERHE
Deputy Reinf. Masonry 2/23/2023 Approved JOEY BUCHANAN
Deputy Steel/Welding 3/2/2023 Approved JOEY BUCHANAN
Light Gage Steel Frame 3/2/2023 Approved JOEY BUCHANAN
Deputy Steel/Welding 3/3/2023 Approved JOEY BUCHANAN
Deputy Steel/Welding 3/6/2023 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 3/15/2023 Partial Approval JOEY BUCHANAN
Structural Steel Frame 3/15/2023 Approved JOEY BUCHANAN
Deputy Reinf. Concrete 3/17/2023 Approved JOEY BUCHANAN
Drywall Nailing 3/29/2023 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 3/31/2023 Approved JOEY BUCHANAN
Insulation 4/26/2023 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 5/5/2023 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 5/10/2023 Partial Approval JOEY BUCHANAN
Insulation 5/10/2023 Partial Approval JOEY BUCHANAN
Interior/Exterior Lathing 5/16/2023 Partial Approval JOEY BUCHANAN
Insulation 5/24/2023 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 6/1/2023 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 6/1/2023 Partial Approval JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 6/2/2023 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 6/2/2023 Approved JOEY BUCHANAN
Drywall Nailing 6/12/2023 Partial Approval JOEY BUCHANAN
Interior/Exterior Lathing 6/12/2023 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 6/15/2023 Partial Approval JOEY BUCHANAN
Insulation 6/23/2023 Approved JOEY BUCHANAN
Pre-Inspection 6/27/2023 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 7/12/2023 Partial Approval JOEY BUCHANAN
Piling/Pier/Caisson 7/12/2023 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 7/13/2023 Partial Approval DAVID TSAU
Light Gage Steel Frame 7/14/2023 Partial Approval DAVID TSAU
Structural Steel Frame 7/18/2023 Not Ready for Inspection JOEY BUCHANAN
Drywall Nailing 7/24/2023 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 7/26/2023 Partial Approval JOEY BUCHANAN
Structural Steel Frame 7/26/2023 Partial Approval JOEY BUCHANAN
Wall Anchors 7/26/2023 Approved JOEY BUCHANAN
Excavation/Setback/Form/Re-Bar 7/31/2023 Partial Approval JOEY BUCHANAN
Floor/Roof Diaphrgm/Shear Wall 8/2/2023 Partial Approval JOEY BUCHANAN
Insulation 8/2/2023 Partial Approval JOEY BUCHANAN
Wall Anchors 8/2/2023 Approved JOEY BUCHANAN
Interior/Exterior Lathing 8/11/2023 Partial Approval JOEY BUCHANAN
Drywall Nailing 8/15/2023 Approved JOEY BUCHANAN
Drywall Nailing 8/24/2023 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 8/30/2023 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 9/13/2023 Partial Approval JOEY BUCHANAN
Insulation 9/26/2023 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 9/29/2023 Approved AMANUEL BERHE
Insulation 9/29/2023 Partial Inspection AMANUEL BERHE
Drywall Nailing 10/3/2023 Partial Approval JOEY BUCHANAN
Drywall Nailing 10/10/2023 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 10/10/2023 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 10/12/2023 Partial Approval JOEY BUCHANAN
Drywall Nailing 10/18/2023 Approved JOEY BUCHANAN
Light Gage Steel Frame 10/18/2023 Approved JOEY BUCHANAN
Drywall Nailing 10/23/2023 Order to Comply Issued JOEY BUCHANAN
Interior/Exterior Lathing 10/23/2023 Not Ready for Inspection JOEY BUCHANAN
Interior/Exterior Lathing 10/26/2023 Partial Approval JOEY BUCHANAN
Pre-Inspection 11/1/2023 Approved JOEY BUCHANAN
Insulation 11/7/2023 Approved JOEY BUCHANAN
Drywall Nailing 11/15/2023 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 11/15/2023 Approved JOEY BUCHANAN
Drywall Nailing 11/29/2023 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 12/8/2023 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 12/13/2023 Partial Approval JOEY BUCHANAN
Insulation 12/13/2023 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 12/15/2023 Approved JOEY BUCHANAN
Deputy Drilled-In Anchors 1/9/2024 Approved JOEY BUCHANAN
Drywall Nailing 1/18/2024 Partial Approval JOEY BUCHANAN
Footing/Foundation/Slab 1/18/2024 Partial Approval JOEY BUCHANAN
Light Gage Steel Frame 1/24/2024 Partial Approval JOEY BUCHANAN
Final 4/1/2024 Not Ready for Inspection AMANUEL BERHE
Green Building Final 4/1/2024 Not Ready for Inspection AMANUEL BERHE
Interior/Exterior Lathing 4/1/2024 Approved AMANUEL BERHE
Reinforced Concrete Frame 4/1/2024 Not Ready for Inspection AMANUEL BERHE
SGSOV-Seismic Gas S/O Valve 4/1/2024 SGSOV Not Ready AMANUEL BERHE
Smoke Detectors 4/1/2024 Not Ready for Inspection AMANUEL BERHE
Floor/Roof Diaphrgm/Shear Wall 4/2/2024 Approved AMANUEL BERHE
Wood Frame 4/2/2024 Approved AMANUEL BERHE
Deputy Drilled-In Anchors 4/11/2024 Approved JOEY BUCHANAN
Final 4/29/2024 Not Ready for Inspection JOEY BUCHANAN
Green Building Final 4/29/2024 Approved JOEY BUCHANAN
Reinforced Concrete Frame 4/29/2024 Approved JOEY BUCHANAN
SGSOV-Seismic Gas S/O Valve 4/29/2024 SGSOV Approved JOEY BUCHANAN
Smoke Detectors 4/29/2024 Approved JOEY BUCHANAN
Verify Rec and Parks Fee Memo 4/29/2024 Not Ready for Inspection JOEY BUCHANAN
Final 5/10/2024 Not Ready for Inspection JOEY BUCHANAN
Posting Pre-Inspection 5/10/2024 Approved JOEY BUCHANAN
Special/Order Compliance 5/10/2024 Approved JOEY BUCHANAN
Verify Rec and Parks Fee Memo 5/10/2024 Approved JOEY BUCHANAN
Special/Order Compliance 5/13/2024 Corrections Issued JOEY BUCHANAN
Verify Rec and Parks Fee Memo 5/14/2024 Approved JOEY BUCHANAN
Final 5/15/2024 Not Ready for Inspection JOEY BUCHANAN
Special/Order Compliance 5/15/2024 Approved JOEY BUCHANAN
Verify Rec and Parks Fee Memo 5/15/2024 Approved JOEY BUCHANAN
Grading Pre-Inspection 5/16/2024 Approved JOEY BUCHANAN
Verify Rec and Parks Fee Memo 5/16/2024 Corrections Issued JOEY BUCHANAN
Final 5/21/2024 Corrections Issued JOEY BUCHANAN
Final 5/30/2024 OK for TCO JOEY BUCHANAN
Final 6/6/2024 Not Ready for Inspection AMANUEL BERHE