1825 S BELOIT AVE 90025
Certificate Information: 1825 S BELOIT AVE 90025
- Application / Permit
- 19016-10000-03137
- Plan Check / Job No.
- B19LA02240
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- SOFT-STORY SEISMIC RETROFIT PER LAMC DIVISION 93. INSTALLATION OF 2 SPECIAL CANTILEVERED COLUMN SYSTEM (SCCS) WITH CONCRETE GRADE BEAM. WORKS AT TUCK-UNDER PARKING AREAS, NOT ON TENANTS' UNITS.
- Permit Issued
- Issued on 2/12/2020
- Issuing Office
- Metro
- Current Status
- CofC Issued on 8/6/2020
Permit Application Status History
| Submitted | 2/1/2019 | APPLICANT |
| Assigned to Plan Check Engineer | 2/13/2019 | ERWIN PASCUA |
| Corrections Issued | 2/17/2019 | ERWIN PASCUA |
| Quality Review Completed | 2/19/2019 | MARJAN SHENASI |
| Building Plans Picked Up | 3/22/2019 | APPLICANT |
| Plan Check Approved | 10/24/2019 | ERWIN PASCUA |
| Issued | 2/12/2020 | LADBS |
| OK for CofC | 8/6/2020 | GRANT WOODS |
| CofC Issued | 8/6/2020 | HENRY BAGHDASSARIAN |
Permit Application Clearance Information
| Housing rent stabilization | Cleared | 2/5/2020 | STEVEN HOFSTAD |
Contact Information
| Contractor | Retrofitting360 Inc; Lic. No.: 1039226-B | 19562 VENTURA BLVD# 230 TARZANA, CA 91356 |
| Engineer | Watson,, Darren S; Lic. No.: C87717 | 3704 MIDVALE AVE 6 LOS ANGELES, CA 90034 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Steel/Welding | 4/28/2020 | Approved | GRANT WOODS |
| Pre-Inspection | 5/15/2020 | Not Ready for Inspection | JOHN DODGE |
| Footing/Foundation/Slab | 5/19/2020 | Approved | GRANT WOODS |
| Pre-Inspection | 5/19/2020 | Approved | GRANT WOODS |
| Wood Frame | 5/19/2020 | Partial Approval | GRANT WOODS |
| Interior/Exterior Lathing | 5/29/2020 | Partial Inspection | SORIN CIRSTOIU |
| Interior/Exterior Lathing | 6/3/2020 | Approved | SORIN CIRSTOIU |
| Structural Steel Frame | 6/3/2020 | Approved | SORIN CIRSTOIU |
| Final | 6/23/2020 | Not Ready for Inspection | JOHN DODGE |
| METHANE-Final | 6/23/2020 | Approved | JOHN DODGE |
| SGSOV-Seismic Gas S/O Valve | 6/23/2020 | SGSOV Not Ready | JOHN DODGE |
| Smoke Detectors | 6/23/2020 | Approved | JOHN DODGE |
| Final | 8/6/2020 | OK for CofC | GRANT WOODS |
| SGSOV-Seismic Gas S/O Valve | 8/6/2020 | SGSOV Approved | GRANT WOODS |