1138 S BEDFORD ST 90035

Certificate Information: 1138 S BEDFORD ST 90035

Application / Permit
19016-10000-02983
Plan Check / Job No.
B19LA02092
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT AS PER LABC CH. 93 USING (N) SHEAR WALLS
Permit Issued
Issued on 10/1/2020
Issuing Office
Current Status
CofC Issued on 6/15/2021

Permit Application Status History

Submitted 1/31/2019 APPLICANT
Assigned to Plan Check Engineer 2/28/2019 CHUNG-WEN CHUANG
Corrections Issued 3/6/2019 CHUNG-WEN CHUANG
Quality Review Completed 3/18/2019 HANS SANTIAGO
Building Plans Picked Up 3/22/2019 APPLICANT
Applicant returned to address corrections 11/20/2019 CHUNG-WEN CHUANG
Plan Check Approved 11/22/2019 CHUNG-WEN CHUANG
Plan Check Approved 11/22/2019 JESSE VIDUYA
Issued 10/1/2020 APPLICANT
OK for CofC 1/8/2021 DARRYL ARNOLD
CofC Issued 6/15/2021 ERNESTO CORRAL

Permit Application Clearance Information

Housing rent stabilization Cleared 9/23/2020 STEVEN HOFSTAD

Contact Information

Contractor Repipe 1 Restoration Inc; Lic. No.: 1003868-B 19326 VENTURA BLVD #200      TARZANA, CA 91356
Engineer Ni,, Zhang Yuan; Lic. No.: C68149 743 S SIERRA VISTA AVE C      ALHAMBRA, CA 91801

Inspector Information

DARRYL ARNOLD, (213) 482-0341 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/29/2020 Approved DARRYL ARNOLD
Deputy Steel/Welding 11/6/2020 Conditional Approval DARRYL ARNOLD
Deputy Steel/Welding 11/18/2020 Conditional Approval MARK FERRARI
Footing/Foundation/Slab 11/20/2020 Conditional Approval DARRYL ARNOLD
Structural Steel Frame 11/20/2020 Conditional Approval DARRYL ARNOLD
Wood Frame 11/20/2020 Conditional Approval DARRYL ARNOLD
Deputy Reinf. Concrete 11/24/2020 Conditional Approval DARRYL ARNOLD
Deputy Wood Construction 12/2/2020 Conditional Approval JONATHAN QUACH
Structural Steel Frame 12/3/2020 Approved JONATHAN QUACH
Wood Frame 12/3/2020 Partial Approval JONATHAN QUACH
Floor/Roof Diaphrgm/Shear Wall 12/9/2020 Approved JONATHAN QUACH
Structural Steel Frame 12/9/2020 Approved JONATHAN QUACH
Wood Frame 12/9/2020 Approved JONATHAN QUACH
Interior/Exterior Lathing 12/28/2020 Approved JONATHAN QUACH
Final 1/8/2021 OK for CofC DARRYL ARNOLD
METHANE-Final 1/8/2021 Approved DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 1/8/2021 SGSOV Approved DARRYL ARNOLD
Smoke Detectors 1/8/2021 Approved DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 4/23/2021 SGSOV Not Ready DARRYL ARNOLD
Pre-Inspection 4/26/2021 Conditional Approval DARRYL ARNOLD
Final 4/27/2021 Partial Inspection DARRYL ARNOLD
METHANE-Final 4/27/2021 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 4/27/2021 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 4/27/2021 Corrections Issued DARRYL ARNOLD