13212 W DEWEY ST 90066

Certificate Information: 13212 W DEWEY ST 90066

Application / Permit
19014-30000-05331
Plan Check / Job No.
B19WL05505
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Bedroom, bath, and closet addition at 2nd floor of (E) 2 story SFD with attached garage.
Permit Issued
Issued on 1/6/2020
Issuing Office
Valley
Current Status
CofO Issued on 4/29/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/30/2019 APPLICANT
Assigned to Plan Check Engineer 10/9/2019 VLADIMIR ARUTYUNYAN
Corrections Issued 10/11/2019 VLADIMIR ARUTYUNYAN
Building Plans Picked Up 10/24/2019 APPLICANT
Plan Check Approved 1/6/2020 JEROME MAGAT PALMA
Issued 1/6/2020 LADBS
CofO in Progress 4/26/2021 PIERRE VEGA
CofO Issued 4/29/2021 VINCENT COTTON
Permit Finaled 4/29/2021 VINCENT COTTON

Permit Application Clearance Information

Low Impact Development Cleared 12/10/2019 JORGE MEJIA LEMUS
Eng Process Fee Ord 176,300 Cleared 12/16/2019 DENNIS BRAGIN
Grading Pre-Inspection Cleared 12/16/2019 VLADIMIR ARUTYUNYAN
Roof/Waste drainage to street Cleared 12/16/2019 DENNIS BRAGIN
Sewer availability Cleared 12/16/2019 DENNIS BRAGIN

Contact Information

Architect Blumenberg,, Richard Leo; Lic. No.: C10862 15200 SUNSET BLVD STE 201      PACIFIC PALISADES, CA 90272
Contractor Basix Designs & Remodeling Inc; Lic. No.: 769443-B 650 S HIGHLAND AVE      LOS ANGELES, CA 90036
Engineer Niver,, Kenneth Earl; Lic. No.: S2554 10845 LINDBROOK DR STE 203      W LOS ANGELES, CA 90024
Engineer Zhong,, Raymond Meng; Lic. No.: M27635 2416 W VALLEY BLVD      ALHAMBRA, CA 91803

Inspector Information

DAKOTA LOW, (310) 914-3895 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 1/23/2020 Approved EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 2/5/2020 Partial Approval DAVID FEILER
ELECTRICAL-Rough 4/6/2020 Corrections Issued CRAIG DAVIS
Floor/Roof Diaphrgm/Shear Wall 4/6/2020 Corrections Issued CRAIG DAVIS
HVAC-Rough 4/6/2020 Corrections Issued CRAIG DAVIS
PLUMBING-Rough 4/6/2020 Corrections Issued CRAIG DAVIS
BUILDING-Rough-Frame 4/13/2020 Partial Approval JOHNNY MIRANDA
ELECTRICAL-Rough 4/13/2020 Partial Inspection JOHNNY MIRANDA
Green Building Rough 4/13/2020 Not Ready for Inspection JOHNNY MIRANDA
HVAC-Rough 4/13/2020 Approved JOHNNY MIRANDA
PLUMBING-Rough 4/13/2020 Approved JOHNNY MIRANDA
BUILDING-Rough-Frame 4/22/2020 Corrections Issued DAVID FEILER
ELECTRICAL-Rough 4/22/2020 Approved DAVID FEILER
Green Building Rough 4/22/2020 Not Ready for Inspection DAVID FEILER
Interior/Exterior Lathing 4/22/2020 Not Ready for Inspection DAVID FEILER
Shower Pan 4/22/2020 Approved DAVID FEILER
BUILDING-Rough-Frame 4/24/2020 Approved DAVID FEILER
Green Building Rough 4/24/2020 Approved DAVID FEILER
Insulation 4/24/2020 Approved DAVID FEILER
Interior/Exterior Lathing 4/24/2020 Approved DAVID FEILER
Drywall Nailing 5/6/2020 Approved DAVID FEILER
Final 8/31/2020 Conditional Approval EVAN COOPER
Green Building Final 8/31/2020 Approved EVAN COOPER
SGSOV-Seismic Gas S/O Valve 8/31/2020 SGSOV Approved EVAN COOPER
Smoke Detectors 8/31/2020 Approved EVAN COOPER
Service/Power Release 4/3/2021 Approved EVAN COOPER