6568 S 5TH AVE 90043

Certificate Information: 6568 S 5TH AVE 90043

Application / Permit
19014-30000-03571
Plan Check / Job No.
B19WL03737
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ADDITION TO EXISTING 1-STORY SINGLE FAMILY DWELLING.
Permit Issued
Issued on 6/4/2020
Issuing Office
Metro
Current Status
Issued on 6/4/2020
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/3/2019 APPLICANT
Assigned to Plan Check Engineer 7/3/2019 SERGIO SILVA
Corrections Issued 7/3/2019 SERGIO SILVA
Plan Check Approved 7/8/2019 CRISTINA SALAZAR
Issued 6/4/2020 LADBS
Building Plans Picked Up 6/8/2020 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 7/8/2019 JOSE CRUZ RODRIGUEZ
Permit Cleared 7/8/2019 JOSE CRUZ RODRIGUEZ
Roof/Waste drainage to street Cleared 7/8/2019 JOSE CRUZ RODRIGUEZ
Sewer availability Cleared 7/8/2019 JOSE CRUZ RODRIGUEZ
Trees in Parkway Cleared 7/8/2019 HECTOR BANUELOS

Contact Information

Contractor Good Seed Community Development Corporation; Lic. No.: 993528-B 6568 5TH AVENUE      LOS ANGELES, CA 90043
Engineer Lobnan,, Essam; Lic. No.: C78053 PO BOX 64373      LOS ANGELES, CA 90064

Inspector Information

SALVADOR MARTINEZ, (213) 202-3479 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 8/3/2020 Corrections Issued FREDDIE RIVERA
Grading Pre-Inspection 8/3/2020 Not Ready for Inspection FREDDIE RIVERA
Footing/Foundation/Slab 8/7/2020 Approved FREDDIE RIVERA
BUILDING-Rough-Frame 12/2/2020 Not Ready for Inspection FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 12/2/2020 Approved FREDDIE RIVERA
Green Building Rough 12/2/2020 Not Ready for Inspection FREDDIE RIVERA
Wood Frame 12/2/2020 Not Ready for Inspection FREDDIE RIVERA
BUILDING-Rough-Frame 3/8/2021 Conditional Approval FREDDIE RIVERA
ELECTRICAL-Rough 3/8/2021 Approved FREDDIE RIVERA
Green Building Rough 3/8/2021 Approved FREDDIE RIVERA
HVAC-Rough 3/8/2021 Approved FREDDIE RIVERA
Pre-Inspection 3/8/2021 Corrections Issued FREDDIE RIVERA
Interior/Exterior Lathing 3/12/2021 Not Ready for Inspection FREDDIE RIVERA
Interior/Exterior Lathing 6/22/2021 Partial Approval JESUS PINEDA
Insulation 7/2/2021 Approved CHRISTOPHER DELLEFIELD
Drywall Nailing 7/13/2021 Approved JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 11/5/2021 SGSOV Not Ready FREDDIE RIVERA
BUILDING-Rough-Frame 11/18/2021 Approved SABAS ALONSO
Final 11/18/2021 Not Ready for Inspection SABAS ALONSO
Green Building Final 11/18/2021 Not Ready for Inspection SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 11/18/2021 SGSOV Approved SABAS ALONSO
Smoke Detectors 11/18/2021 Approved SABAS ALONSO
Final 11/29/2021 Not Ready for Inspection FREDDIE RIVERA
Green Building Final 11/29/2021 Not Ready for Inspection FREDDIE RIVERA
Service/Power Release 11/29/2021 Not Ready for Inspection FREDDIE RIVERA