2108 S OVERLAND AVE 90025

Certificate Information: 2108 S OVERLAND AVE 90025

Application / Permit
19014-30000-02478
Plan Check / Job No.
B19WL02602
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
Addition to and conversion of (E) detached garage to an accessory dwelling unit per AB 494 and SB 229.
Permit Issued
Issued on 9/23/2019
Issuing Office
West Los Angeles
Current Status
CofO Issued on 11/24/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/10/2019 APPLICANT
Assigned to Plan Check Engineer 5/16/2019 REZA HAGHIGHAT
Corrections Issued 5/16/2019 REZA HAGHIGHAT
Building Plans Picked Up 5/21/2019 APPLICANT
Applicant returned to address corrections 9/17/2019 JAHANSHAH POURHASSAN
Plan Check Approved 9/18/2019 KAVIAN REFAHI
Issued 9/23/2019 LADBS
CofO in Progress 10/28/2021 GERMAN RODRIGUEZ MENDOZA
Permit Finaled 11/24/2021 DANIEL ORRANTE
CofO Issued 11/24/2021 DANIEL ORRANTE
Permit Finaled 11/24/2021 DANIEL ORRANTE

Permit Application Clearance Information

Address approval Cleared 5/23/2019 HISASHI KOBAYAKAWA
Grading Pre-Inspection Cleared 5/28/2019 PATRICK MISCHLICH
Eng Process Fee Ord 176,300 Cleared 8/6/2019 HISASHI KOBAYAKAWA
Roof/Waste drainage to street Cleared 8/6/2019 HISASHI KOBAYAKAWA
Sewer availability Cleared 8/6/2019 HISASHI KOBAYAKAWA
Hydrant and Access approval Cleared 8/12/2019 ROBERT DUFF
Construction near power lines Cleared 8/28/2019 RIDWAN HARDY
Permit Cleared 9/17/2019 OSCAR GUTIERREZ

Contact Information

Contractor Owner-Builder       ,
Engineer Cohanfard,, Albert; Lic. No.: C45408 910 S BEDFORD ST 304      LOS ANGELES, CA 90035

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/19/2020 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Sewer 3/31/2020 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Special/Order Compliance 3/31/2020 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Sewer 4/14/2020 Partial Approval GERMAN RODRIGUEZ MENDOZA
Pre-Inspection 5/15/2020 Not Ready for Inspection KEVIN SARGSYAN
Pre-Inspection 5/19/2020 Not Ready for Inspection KEVIN SARGSYAN
Pre-Inspection 5/29/2020 Partial Inspection GERMAN RODRIGUEZ MENDOZA
Pre-Inspection 6/30/2020 Partial Inspection GERMAN RODRIGUEZ MENDOZA
Pre-Inspection 8/4/2020 Partial Inspection GERMAN RODRIGUEZ MENDOZA
METHANE-Barrier 8/6/2020 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
METHANE-Subgrade 8/6/2020 Approved GERMAN RODRIGUEZ MENDOZA
Footing/Foundation/Slab 8/18/2020 Approved GERMAN RODRIGUEZ MENDOZA
METHANE-Barrier 8/18/2020 Approved GERMAN RODRIGUEZ MENDOZA
Floor/Roof Diaphrgm/Shear Wall 9/2/2020 Partial Approval GERMAN RODRIGUEZ MENDOZA
METHANE-Rough 9/2/2020 Corrections Issued GERMAN RODRIGUEZ MENDOZA
ELECTRICAL-Rough 9/18/2020 Corrections Issued GERMAN RODRIGUEZ MENDOZA
METHANE-Rough 9/18/2020 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Floor/Roof Diaphrgm/Shear Wall 10/5/2020 Partial Approval GERMAN RODRIGUEZ MENDOZA
Green Building Rough 10/5/2020 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
HVAC-Rough 10/5/2020 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
METHANE-Rough 10/5/2020 Approved GERMAN RODRIGUEZ MENDOZA
PLUMBING-Rough 10/5/2020 Approved GERMAN RODRIGUEZ MENDOZA
BUILDING-Rough-Frame 10/14/2020 Approved GERMAN RODRIGUEZ MENDOZA
ELECTRICAL-Rough 10/14/2020 Approved GERMAN RODRIGUEZ MENDOZA
Green Building Rough 10/14/2020 Approved GERMAN RODRIGUEZ MENDOZA
HVAC-Rough 10/14/2020 Approved GERMAN RODRIGUEZ MENDOZA
Interior/Exterior Lathing 10/14/2020 Partial Approval GERMAN RODRIGUEZ MENDOZA
Insulation 11/10/2020 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Drywall Nailing 11/16/2020 Approved GERMAN RODRIGUEZ MENDOZA
Shower Pan 11/24/2020 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Shower Pan 11/30/2020 Approved GERMAN RODRIGUEZ MENDOZA
ELECTRICAL-Final 8/12/2021 Corrections Issued GERMAN RODRIGUEZ MENDOZA
HVAC-Final 8/12/2021 Corrections Issued GERMAN RODRIGUEZ MENDOZA
PLUMBING-Final 8/12/2021 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Final 8/13/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Footing/Foundation/Slab 8/13/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Green Building Final 8/13/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
SGSOV-Seismic Gas S/O Valve 8/13/2021 SGSOV Not Ready GERMAN RODRIGUEZ MENDOZA
Smoke Detectors 8/13/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Gas Test 8/26/2021 Approved GERMAN RODRIGUEZ MENDOZA
SGSOV-Seismic Gas S/O Valve 9/8/2021 SGSOV Not Ready GERMAN RODRIGUEZ MENDOZA
Final 10/4/2021 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Footing/Foundation/Slab 10/4/2021 Approved GERMAN RODRIGUEZ MENDOZA
Green Building Final 10/4/2021 Approved GERMAN RODRIGUEZ MENDOZA
SGSOV-Seismic Gas S/O Valve 10/4/2021 SGSOV Approved GERMAN RODRIGUEZ MENDOZA
Smoke Detectors 10/4/2021 Approved GERMAN RODRIGUEZ MENDOZA
Final 10/6/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Final 10/25/2021 Conditional Approval GERMAN RODRIGUEZ MENDOZA