631 N EDINBURGH AVE 90048

Certificate Information: 631 N EDINBURGH AVE 90048

Application / Permit
19014-30000-01882
Plan Check / Job No.
B19WL02024
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) DETACHED GARAGE TO ADU WITH ADDITION PER AB 494 AND SB 229. PER ENGINEERED DESIGN.
Permit Issued
Issued on 6/21/2019
Issuing Office
West Los Angeles
Current Status
CofO Issued on 2/28/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/12/2019 APPLICANT
Assigned to Plan Check Engineer 4/18/2019 ALFREDO JARA
Corrections Issued 4/22/2019 ALFREDO JARA
Building Plans Picked Up 4/24/2019 APPLICANT
Plan Check Approved 6/14/2019 ALFREDO JARA
Issued 6/21/2019 LADBS
CofO in Progress 1/17/2024 LILIANA PORTILLO
No Progress 1/26/2024 DEROLD HAUFF
Permit Finaled 2/28/2024 DEROLD HAUFF
CofO Issued 2/28/2024 DEROLD HAUFF
Permit Finaled 2/28/2024 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 4/24/2019 JOSE CRUZ RODRIGUEZ
Eng Process Fee Ord 176,300 Cleared 4/24/2019 JOSE CRUZ RODRIGUEZ
Construction near power lines Cleared 5/18/2019 RIDWAN HARDY
Low Impact Development Cleared 6/10/2019 MITESH PATEL
Roof/Waste drainage to street Cleared 6/10/2019 ELENA LOPEZ
Sewer availability Cleared 6/10/2019 ELENA LOPEZ

Contact Information

Architect Bambrough,, Patrick; Lic. No.: C34299 4132 ALLA ROAD      LOS ANGELES, CA 90066
Contractor Owner-Builder       ,
Engineer Garestani,, Siamak; Lic. No.: M26426 6345 BALBOA BLVD #288      ENCINO, CA 91316

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

METHANE-Barrier 7/5/2019 Approved JOSEPH MCGARRY
METHANE-Subgrade 7/5/2019 Approved JOSEPH MCGARRY
Pre-Inspection 7/5/2019 Partial Approval JOSEPH MCGARRY
PLUMBING-Rough 7/29/2019 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 8/13/2019 Corrections Issued JOSEPH MCGARRY
Footing/Foundation/Slab 8/19/2019 Partial Approval JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 5/26/2020 Partial Approval CHRIS CHRISTENSEN
Floor/Roof Diaphrgm/Shear Wall 6/5/2020 Partial Approval CHRIS CHRISTENSEN
Deputy Wood Construction 12/24/2020 No Access for Inspection ELMER BLAND
Wood Frame 12/29/2020 Partial Approval CHRIS CHRISTENSEN
BUILDING-Rough-Frame 1/5/2021 Conditional Approval CHRIS CHRISTENSEN
ELECTRICAL-Rough 1/5/2021 Approved CHRIS CHRISTENSEN
Green Building Rough 1/5/2021 Corrections Issued CHRIS CHRISTENSEN
HVAC-Rough 1/5/2021 Approved CHRIS CHRISTENSEN
METHANE-Rough 1/5/2021 Approved CHRIS CHRISTENSEN
PLUMBING-Rough 1/5/2021 Corrections Issued CHRIS CHRISTENSEN
Interior/Exterior Lathing 1/22/2021 Partial Approval CHRIS CHRISTENSEN
BUILDING-Rough-Frame 3/3/2021 Approved CHRIS CHRISTENSEN
Green Building Rough 3/3/2021 Approved CHRIS CHRISTENSEN
Insulation 3/3/2021 Conditional Approval CHRIS CHRISTENSEN
PLUMBING-Rough 3/3/2021 Approved CHRIS CHRISTENSEN
Drywall Nailing 5/14/2021 Approved CHRIS CHRISTENSEN
Interior/Exterior Lathing 9/16/2021 Partial Approval CHRIS CHRISTENSEN
Special/Order Compliance 4/4/2022 Corrections Issued JOSEPH MCGARRY
Underground Mechanical 4/4/2022 Partial Approval JOSEPH MCGARRY
Gas Test 4/21/2022 Approved ADAM ESCOTO
Underground Mechanical 4/21/2022 Approved ADAM ESCOTO
Special/Order Compliance 6/23/2023 Corrections Issued LILIANA PORTILLO
Final 8/29/2023 Corrections Issued LILIANA PORTILLO
Footing/Foundation/Slab 8/29/2023 Approved LILIANA PORTILLO
PLUMBING-Final 8/29/2023 Conditional Approval LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 8/29/2023 SGSOV Approved LILIANA PORTILLO
Smoke Detectors 8/29/2023 Approved LILIANA PORTILLO
Final 9/28/2023 Corrections Issued LILIANA PORTILLO
Green Building Final 9/28/2023 Not Ready for Inspection LILIANA PORTILLO
ELECTRICAL-Final 12/22/2023 Approved LILIANA PORTILLO
Final 12/22/2023 Not Ready for Inspection LILIANA PORTILLO
HVAC-Final 12/22/2023 Approved LILIANA PORTILLO
PLUMBING-Final 12/22/2023 Approved LILIANA PORTILLO
Final 1/16/2024 OK to Issue CofO LILIANA PORTILLO
Green Building Final 1/16/2024 Approved LILIANA PORTILLO