2651 S MALCOLM AVE 90064

Certificate Information: 2651 S MALCOLM AVE 90064

Application / Permit
19014-30000-00717
Plan Check / Job No.
B19WL00765
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
2-STORY TYPE VB ADDITION TO SINGLE FAMILY DWELLING WITH ATTACHED GARAGE, EQUIPPED THROUGHOUT WITH NFPA 13D FIRE SPRINKLERS. ADDITION OF ATTACHED GARAGE, AND PORCH ON 1ST FLOOR; (2) TWO BEDROOMS, (2) TWO BATHROOMS, AND LOFT ON 2ND FLOOR. REFRAME ENTIRE ROOF.
Permit Issued
Issued on 12/13/2022
Issuing Office
West Los Angeles
Current Status
CofO Issued on 9/18/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/12/2019 APPLICANT
Assigned to Plan Check Engineer 2/28/2019 SERGIO SILVA
Corrections Issued 3/7/2019 SERGIO SILVA
Quality Review Completed 3/14/2019 KAMRAN GHOTBI RAVANDI
Green Plans Picked Up 3/20/2019 APPLICANT
Applicant returned to address corrections 5/11/2020 SERGIO SILVA
Applicant returned to address corrections 6/10/2020 SERGIO SILVA
Applicant returned to address corrections 7/17/2020 SERGIO SILVA
Applicant returned to address corrections 7/20/2020 SERGIO SILVA
Applicant returned to address corrections 1/11/2022 SERGIO SILVA
Building Plans Picked Up 1/20/2022 APPLICANT
Plan Check Approved 12/12/2022 SERGIO SILVA
Issued 12/13/2022 APPLICANT
CofO in Progress 9/16/2025 MICHAEL PELHAM
Permit Finaled 9/18/2025 RICHARD STEINBACH
CofO Issued 9/18/2025 RICHARD STEINBACH
Permit Finaled 9/18/2025 RICHARD STEINBACH

Permit Application Clearance Information

Green Code Cleared 5/29/2019 DONALD CRICHLOW
Low Impact Development Cleared 3/11/2020 ANDRES COVARRUBIAS
CPC Cleared 8/6/2020 HERMINIGILDO AGUSTIN
Eng Process Fee Ord 176,300 Cleared 6/7/2021 TRACY TATE
Permit Cleared 9/21/2021 DINAH GARIN
Roof/Waste drainage to street Cleared 11/8/2021 ANTHONY MAINEZ
Sewer availability Cleared 11/22/2021 ANTHONY MAINEZ
GPI Written Notices Cleared 1/11/2022 SERGIO SILVA
Grading Pre-Inspection Cleared 1/11/2022 SERGIO SILVA
Trees in Parkway Cleared 2/18/2022 ADALBERTO VERA
Hydrant and Access approval Cleared 2/19/2022 KURT CORRAL
Miscellaneous Cleared 12/12/2022 SERGIO SILVA

Contact Information

Architect Yeh,, Te-Shun; Lic. No.: C28830 22288 ROUNDUP DRIVE      WALNUT, CA 91789
Contractor Owner-Builder       ,
Engineer Lu,, Yi; Lic. No.: S5678 P O BOX 2754      PALOS VERDES PENINSULA, CA 90274
Engineer Zhong,, Raymond Meng; Lic. No.: M27635 2416 W VALLEY BLVD      ALHAMBRA, CA 91803

Inspector Information

KIRK SANDERS, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI
ARAM AVEDISIAN, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 8/30/2023 Corrections Issued JESUS PINEDA
Footing/Foundation/Slab 10/2/2023 Approved CHRISTOPHER WILSON
ELECTRICAL-Rough 2/2/2024 Not Ready for Inspection JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 2/2/2024 Corrections Issued JESUS PINEDA
Green Building Rough 2/2/2024 Not Ready for Inspection JESUS PINEDA
PLUMBING-Rough 2/2/2024 Not Ready for Inspection JESUS PINEDA
ELECTRICAL-Rough 2/15/2024 Not Ready for Inspection JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 2/15/2024 Corrections Issued JESUS PINEDA
Green Building Rough 2/15/2024 Not Ready for Inspection JESUS PINEDA
PLUMBING-Rough 2/15/2024 Not Ready for Inspection JESUS PINEDA
PLUMBING-Rough 3/19/2024 Approved OGANES TARAKHCHYAN
BUILDING-Rough-Frame 3/27/2024 Partial Approval OGANES TARAKHCHYAN
ELECTRICAL-Rough 3/27/2024 Approved OGANES TARAKHCHYAN
BUILDING-Rough-Frame 4/2/2024 Conditional Approval BOBBY KEY
Green Building Rough 4/2/2024 Approved BOBBY KEY
HVAC-Rough 4/2/2024 Partial Approval BOBBY KEY
Insulation 4/2/2024 Approved BOBBY KEY
Interior/Exterior Lathing 4/2/2024 Approved BOBBY KEY
Special/Order Compliance 4/2/2024 Corrections Issued BOBBY KEY
Verify Sprinkler Sign Off 4/2/2024 Approved BOBBY KEY
Drywall Nailing 4/30/2024 Corrections Issued ASHLEY THOMPSON
Drywall Nailing 5/2/2024 Approved ASHLEY THOMPSON
Final 5/2/2024 Corrections Issued ASHLEY THOMPSON
HVAC-Rough 5/2/2024 Approved ASHLEY THOMPSON
BUILDING-Rough-Frame 10/16/2024 Not Ready for Inspection DANIEL VERA
Final 10/16/2024 Corrections Issued DANIEL VERA
Green Building Final 10/16/2024 Not Ready for Inspection DANIEL VERA
SGSOV-Seismic Gas S/O Valve 10/16/2024 SGSOV Not Ready DANIEL VERA
Smoke Detectors 10/16/2024 Corrections Issued DANIEL VERA
BUILDING-Rough-Frame 8/7/2025 Approved DANIEL VERA
Final 8/7/2025 Not Ready for Inspection DANIEL VERA
Green Building Final 8/7/2025 Not Ready for Inspection DANIEL VERA
SGSOV-Seismic Gas S/O Valve 8/7/2025 SGSOV Approved DANIEL VERA
Smoke Detectors 8/7/2025 Not Ready for Inspection DANIEL VERA
Final 9/12/2025 Not Ready for Inspection MICHAEL ALLEN
Green Building Final 9/12/2025 Conditional Approval MICHAEL ALLEN
Smoke Detectors 9/12/2025 Approved MICHAEL ALLEN
Final 9/16/2025 OK to Issue CofO MICHAEL PELHAM
Green Building Final 9/16/2025 Approved MICHAEL PELHAM