1056 S STEARNS DR 90035

Certificate Information: 1056 S STEARNS DR 90035

Application / Permit
19014-20000-06906
Plan Check / Job No.
B19VN22053
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL (E) SFD TO RECONFIGURE KITCHEN/BEDROOMS/BATHROOMS, 14' X 20'-6" ADDITON FOR BEDROOM/ BATHROOM EXPANSION, NEW 4' X 13'-4" ATTACHED PATIO COVER. WORK PER ENGINEERING.
Permit Issued
Issued on 5/10/2021
Issuing Office
Current Status
CofO Issued on 12/5/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/19/2019 APPLICANT
Assigned to Plan Check Engineer 12/19/2019 ALDOUS CHIC
Corrections Issued 12/20/2019 ALDOUS CHIC
Building Plans Picked Up 12/23/2019 APPLICANT
Applicant returned to address corrections 2/24/2020 ALDOUS CHIC
Applicant returned to address corrections 7/1/2020 ROSENDO MEDINA
Applicant returned to address corrections 7/17/2020 ROSENDO MEDINA
Plan Check Approved 7/21/2020 ROSENDO MEDINA
Issued 5/10/2021 APPLICANT
CofO in Progress 6/29/2023 JOSE AVILA
CofO Issued 12/5/2023 DEROLD HAUFF
Permit Finaled 12/5/2023 DEROLD HAUFF

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 2/24/2020 JOSHUA DIAZ
Roof/Waste drainage to street Cleared 2/24/2020 JOSHUA DIAZ
HPOZ Cleared 7/7/2020 JONATHAN KAPLAN
Miscellaneous Cleared 7/7/2020 JONATHAN KAPLAN
ZI Cleared 7/7/2020 JONATHAN KAPLAN

Contact Information

Contractor K S Construction And Design; Lic. No.: 896510-B 22100 BURBANK BL #226C      WOODLAND HILLS, CA 91367
Engineer Standley,, Craig Erick; Lic. No.: C87675 6631 MURIETTA AVE      LOS ANGELES, CA 91405

Inspector Information

DAVID WILLIAMS, (213) 202-3126 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/12/2021 Approved JOAQUIN GREENOUGH
Deputy Drilled-In Anchors 8/25/2021 Conditional Approval STUART CHAPMAN
Special/Order Compliance 9/13/2021 Corrections Issued CALEB MEISTER
Excavation/Setback/Form/Re-Bar 1/11/2022 Approved JOSE AVILA
Footing/Foundation/Slab 1/11/2022 Approved JOSE AVILA
METHANE-Barrier 1/11/2022 Approved JOSE AVILA
METHANE-Subgrade 1/11/2022 Approved JOSE AVILA
Deputy Reinf. Concrete 1/13/2022 Conditional Approval JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 1/21/2022 Corrections Issued JOSE AVILA
Insulation 1/21/2022 Not Ready for Inspection JOSE AVILA
Wood Frame 1/27/2022 Approved JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 3/31/2022 Corrections Issued JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 5/10/2022 Partial Approval JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 5/26/2022 Corrections Issued JOSE AVILA
Deputy Wood Construction 6/8/2022 Conditional Approval JOSE AVILA
METHANE-Rough 6/22/2022 Approved JOSE AVILA
PLUMBING-Rough 6/29/2022 Partial Approval JOSE AVILA
Interior/Exterior Lathing 7/8/2022 Approved JOSE AVILA
ELECTRICAL-Rough 8/11/2022 Approved JOSE AVILA
Gas Test 8/11/2022 Partial Approval JOSE AVILA
HVAC-Rough 8/11/2022 Approved JOSE AVILA
PLUMBING-Rough 8/11/2022 Approved JOSE AVILA
BUILDING-Rough-Frame 10/17/2022 Approved JOSE AVILA
Green Building Rough 10/17/2022 Approved JOSE AVILA
Wood Frame 10/17/2022 Approved JOSE AVILA
Insulation 10/19/2022 Approved JOSE AVILA
Drywall Nailing 11/1/2022 Approved JOSE AVILA
Pre-Inspection 2/1/2023 Approved JOSE AVILA
Final 5/5/2023 Corrections Issued JOSE AVILA
Green Building Final 5/5/2023 Approved JOSE AVILA
SGSOV-Seismic Gas S/O Valve 5/5/2023 SGSOV Approved JOSE AVILA
Smoke Detectors 5/5/2023 Approved JOSE AVILA
Final 6/16/2023 Not Ready for Inspection JOSE AVILA
Final 6/29/2023 OK to Issue CofO JOSE AVILA