4838 N ATOLL AVE 91423

Certificate Information: 4838 N ATOLL AVE 91423

Application / Permit
19014-20000-06904
Plan Check / Job No.
B19VN22050
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMOVE ALL EXISTING AND INTERIOR WALLS OF AN EXISTING ONE STORY DWELLING EXCEPT FOR 5 LINEAR FT AT NORTH SIDE AND BUILD AN IRREGULAR 44'7" X 83'10" ONE STORY SINGLE FAMILY DWELLING WITH AN ATTACHED TWO CAR GARAGE, NEW 17'6" X 11'6" REAR OPEN TRELLIS , NFPA-13D FIRE SPRINKLERS REQUIRED , ALL WORK PER ENGINEERING
Permit Issued
Issued on 3/5/2020
Issuing Office
Valley
Current Status
CofO Issued on 10/16/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/19/2019 APPLICANT
Assigned to Plan Check Engineer 1/2/2020 RARES BODEA
Corrections Issued 1/4/2020 RARES BODEA
Green Plans Picked Up 1/8/2020 APPLICANT
Quality Review Completed 1/10/2020 GUANG MIN TUNG
Building Plans Picked Up 1/14/2020 APPLICANT
Plan Check Approved 3/4/2020 RARES BODEA
Issued 3/5/2020 LADBS
CofO in Progress 1/28/2021 BRENDAN LOONEY
Permit Finaled 10/16/2021 MICHAEL SMITH
CofO Issued 10/16/2021 MICHAEL SMITH
Permit Finaled 10/16/2021 MICHAEL SMITH

Permit Application Clearance Information

Trees in Parkway Cleared 2/20/2020 JOHN KIM
Low Impact Development Cleared 2/24/2020 JORGE MEJIA LEMUS
Green Code Cleared 2/25/2020 DAVID MATSON
Hydrant and Access approval Cleared 2/25/2020 GEORGE SUCHAND
Eng Process Fee Ord 176,300 Cleared 3/2/2020 LEE GUILBEAUX
Permit Cleared 3/2/2020 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 3/2/2020 LEE GUILBEAUX
Sewer availability Cleared 3/2/2020 LEE GUILBEAUX

Contact Information

Contractor Owner-Builder       ,
Engineer Yuzon,, Benigno S; Lic. No.: S3454 25531 PRADO DELAS BELLOTAS      CALABASAS, CA 91302

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 5/27/2020 Conditional Approval BRENDAN LOONEY
Underground Mechanical 6/18/2020 Approved BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 6/23/2020 Partial Approval BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 7/7/2020 Corrections Issued BRENDAN LOONEY
Deputy Wood Construction 7/15/2020 Conditional Approval BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 7/16/2020 Partial Approval BRENDAN LOONEY
ELECTRICAL-Rough 7/29/2020 Approved BRENDAN LOONEY
HVAC-Rough 7/29/2020 Approved BRENDAN LOONEY
BUILDING-Rough-Frame 8/3/2020 Conditional Approval BRENDAN LOONEY
MERV13>=Rough 8/3/2020 Partial Approval BRENDAN LOONEY
PLUMBING-Rough 8/3/2020 Approved BRENDAN LOONEY
Interior/Exterior Lathing 8/18/2020 Approved BRENDAN LOONEY
Shower Pan 8/18/2020 Approved BRENDAN LOONEY
Interior/Exterior Lathing 8/20/2020 Approved BRENDAN LOONEY
BUILDING-Rough-Frame 9/3/2020 Approved BRENDAN LOONEY
Drywall Nailing 9/3/2020 Approved BRENDAN LOONEY
Green Building Rough 9/3/2020 Approved BRENDAN LOONEY
Insulation 9/3/2020 Approved BRENDAN LOONEY
MERV13>=Rough 9/3/2020 Approved BRENDAN LOONEY
Final 1/4/2021 Corrections Issued ARAM AVEDISIAN
Footing/Foundation/Slab 1/4/2021 Not Ready for Inspection ARAM AVEDISIAN
Green Building Final 1/4/2021 Not Ready for Inspection ARAM AVEDISIAN
MERV13>=Final 1/4/2021 Not Ready for Inspection ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 1/4/2021 SGSOV Approved ARAM AVEDISIAN
Smoke Detectors 1/4/2021 Approved ARAM AVEDISIAN
Final 1/11/2021 Not Ready for Inspection ARAM AVEDISIAN
Footing/Foundation/Slab 1/11/2021 Not Ready for Inspection ARAM AVEDISIAN
Green Building Final 1/11/2021 Not Ready for Inspection ARAM AVEDISIAN
MERV13>=Final 1/11/2021 Not Ready for Inspection ARAM AVEDISIAN
Final 1/12/2021 Conditional Approval BRENDAN LOONEY
Footing/Foundation/Slab 1/12/2021 Approved BRENDAN LOONEY
Green Building Final 1/12/2021 Approved BRENDAN LOONEY
MERV13>=Final 1/12/2021 Approved BRENDAN LOONEY
Final 1/27/2021 OK to Issue CofO BRENDAN LOONEY
Service/Power Release 1/27/2021 Approved BRENDAN LOONEY