3911 1/2 W 60TH ST 90043

Certificate Information: 3911 1/2 W 60TH ST 90043

Application / Permit
19014-20000-06634
Plan Check / Job No.
B19VN21166
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) 18'-4" X 20'-5" DETACHED GARAGE AND ADD 12'-0" X 13'-0" FOR (N) ACCESSORY DWELLING UNIT PER AB 494 AND SB 229. ALL WORK PER WFPP.
Permit Issued
Issued on 3/9/2020
Issuing Office
Valley
Current Status
CofO Issued on 12/24/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/5/2019 APPLICANT
Assigned to Plan Check Engineer 12/12/2019 JENNIFER LEE
Corrections Issued 12/12/2019 JENNIFER LEE
Plan Check Approved 3/9/2020 ANGELICA MARTINEZ
Issued 3/9/2020 LADBS
CofO in Progress 12/16/2020 FREDDIE RIVERA
Permit Finaled 12/24/2020 DEROLD HAUFF
CofO Issued 12/24/2020 DEROLD HAUFF
Permit Finaled 12/24/2020 DEROLD HAUFF

Permit Application Clearance Information

Construction near power lines Cleared 1/22/2020 RIDWAN HARDY
Address approval Cleared 3/9/2020 MARKOS PEREZ-BRAN
Eng Process Fee Ord 176,300 Cleared 3/9/2020 MARKOS PEREZ-BRAN
Grading Pre-Inspection Cleared 3/9/2020 BARTON HOLMES
Roof/Waste drainage to street Cleared 3/9/2020 MARKOS PEREZ-BRAN
Sewer availability Cleared 3/9/2020 MARKOS PEREZ-BRAN

Contact Information

Contractor Unlimited Construction & Remodeling Inc; Lic. No.: 1047565-B 8500 WILSHIRE BLVD STE 829      BEVERLY HILLS, CA 90211

Inspector Information

SALVADOR MARTINEZ, (213) 202-3479 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 5/11/2020 Conditional Approval SABAS ALONSO
Gas Test 5/11/2020 Approved ENRIQUE MIRELES
Sewer 5/11/2020 Approved ENRIQUE MIRELES
Underground Mechanical 5/11/2020 Approved ENRIQUE MIRELES
Footing/Foundation/Slab 5/12/2020 Approved FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 5/26/2020 Approved FREDDIE RIVERA
ELECTRICAL-Rough 5/29/2020 Approved COREY HUPP
BUILDING-Rough-Frame 6/3/2020 Approved FREDDIE RIVERA
Green Building Rough 6/3/2020 Approved FREDDIE RIVERA
PLUMBING-Rough 6/3/2020 Approved FREDDIE RIVERA
Pre-Inspection 6/3/2020 Corrections Issued FREDDIE RIVERA
Insulation 6/8/2020 Approved SABAS ALONSO
Shower Pan 6/8/2020 Approved SABAS ALONSO
Drywall Nailing 6/11/2020 Approved SABAS ALONSO
Interior/Exterior Lathing 6/11/2020 Approved SABAS ALONSO
Interior/Exterior Lathing 6/15/2020 Approved SABAS ALONSO
Final 9/11/2020 Corrections Issued FREDDIE RIVERA
Green Building Final 9/11/2020 Conditional Approval FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 9/11/2020 SGSOV Not Ready FREDDIE RIVERA
Smoke Detectors 9/11/2020 Approved FREDDIE RIVERA
Final 9/18/2020 Conditional Approval FREDDIE RIVERA
Green Building Final 9/18/2020 Approved FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 9/18/2020 SGSOV Approved FREDDIE RIVERA
Final 12/14/2020 Not Ready for Inspection FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 12/14/2020 Approved FREDDIE RIVERA
Insulation 12/14/2020 Approved FREDDIE RIVERA
Special/Order Compliance 12/14/2020 Approved FREDDIE RIVERA