4401 N TRANCAS PL 91356

Certificate Information: 4401 N TRANCAS PL 91356

Application / Permit
19014-20000-06440
Plan Check / Job No.
B19VN20665
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
CONVERT EX REC RM INTO MASTER CLOSET, ENLARGE MASTER BEDRM & REMODEL EX MASTER BATHRM. EX SAUNA RM TO BE ACCESSIBLE FROM OUTSIDE ONLY FOR EX POOL. CONVERT EX 2 CLOSETS INTO BATHRM. AND REMODEL EX BATHRM. REMOVE WALLS BETWEEN KITCHEN/LIV/FAMILY RM. ADDN TO EXPAND EX KITCHEN & ENTRY. AND REMODEL KITCHEN. REROOF ENTIRE HOUSE W/ COOL ROOF COMPLIANCE COMP SHINGLES, CLASS'A'. SEE COMMENTS.
Permit Issued
Issued on 1/15/2020
Issuing Office
Valley
Current Status
CofO Issued on 12/6/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/26/2019 APPLICANT
Assigned to Plan Check Engineer 11/27/2019 HAYATO TSUCHIYA
Corrections Issued 12/3/2019 HAYATO TSUCHIYA
Building Plans Picked Up 12/9/2019 APPLICANT
Applicant returned to address corrections 1/8/2020 HAYATO TSUCHIYA
Plan Check Approved 1/15/2020 HAYATO TSUCHIYA
Issued 1/15/2020 LADBS
CofO in Progress 12/6/2025 MICHAEL PELHAM
Permit Finaled 12/6/2025 MICHAEL PELHAM
CofO Issued 12/6/2025 MICHAEL PELHAM
Permit Finaled 12/6/2025 MICHAEL PELHAM

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 12/18/2019 ADRIAN CASTRO
Roof/Waste drainage to street Cleared 12/18/2019 ADRIAN CASTRO
Grading Pre-Inspection Cleared 1/8/2020 HAYATO TSUCHIYA

Contact Information

Contractor Owner-Builder       ,
Engineer Maalouf,, Sami; Lic. No.: C53210 15445 VENTURA BLVD STE 367      SHERMAN OAKS, CA 91403

Inspector Information

JOHN KIDWELL, (818) 774-4314 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 3/11/2020 Corrections Issued DAVID SANDOVAL
Footing/Foundation/Slab 3/16/2020 Approved RONALD COWAN
PLUMBING-Rough 3/16/2020 Partial Approval RONALD COWAN
PLUMBING-Rough 4/1/2020 Partial Approval DAVID SANDOVAL
Floor/Roof Diaphrgm/Shear Wall 4/6/2020 Corrections Issued DAVID SANDOVAL
Deputy Wood Construction 4/7/2020 Approved DAVID SANDOVAL
Floor/Roof Diaphrgm/Shear Wall 4/7/2020 Partial Approval DAVID SANDOVAL
ELECTRICAL-Rough 4/13/2020 Approved DAVID SANDOVAL
BUILDING-Rough-Frame 4/17/2020 Not Ready for Inspection VINCENT HANLEY
Green Building Rough 4/17/2020 Not Ready for Inspection VINCENT HANLEY
HVAC-Rough 4/17/2020 Corrections Issued VINCENT HANLEY
PLUMBING-Rough 4/17/2020 Approved VINCENT HANLEY
Interior/Exterior Lathing 4/30/2020 Not Ready for Inspection DAVID SANDOVAL
Shower Pan 4/30/2020 Corrections Issued DAVID SANDOVAL
Shower Pan 5/4/2020 Approved DAVID SANDOVAL
BUILDING-Rough-Frame 5/18/2020 Approved DAVID SANDOVAL
Green Building Rough 5/18/2020 Approved DAVID SANDOVAL
Interior/Exterior Lathing 5/18/2020 Partial Approval DAVID SANDOVAL
Wood Frame 5/18/2020 Not Ready for Inspection DAVID SANDOVAL
Insulation 6/10/2020 No Access for Inspection DAVID SANDOVAL
Insulation 6/11/2020 Approved DAVID SANDOVAL
Drywall Nailing 6/24/2020 Approved DAVID SANDOVAL
HVAC-Final 9/30/2020 Approved DAVID SANDOVAL
ELECTRICAL-Final 6/2/2021 Not Ready for Inspection DAVID SANDOVAL
Final 6/2/2021 Corrections Issued DAVID SANDOVAL
Green Building Final 6/2/2021 Approved DAVID SANDOVAL
SGSOV-Seismic Gas S/O Valve 6/2/2021 SGSOV Approved DAVID SANDOVAL
Smoke Detectors 6/2/2021 Approved DAVID SANDOVAL
Final 7/26/2024 Corrections Issued MORRIS JACKSON
Final 7/18/2025 Not Ready for Inspection JOHN KIDWELL
Final 12/6/2025 OK to Issue CofO MICHAEL PELHAM