5206 S MESMER AVE 90230

Certificate Information: 5206 S MESMER AVE 90230

Application / Permit
19014-20000-06366
Plan Check / Job No.
B19VN20402
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
CONVERT EX BEDROOM INTO MASTER BATHROOM AND HALLWAY TO NEW MASTER BEDROOM ADDITION AT REAR. REMOVE & REPLACE EXISTING SLIDING DOOR & WINDOW W/ NEW SLIDING DOORS PER PLAN.
Permit Issued
Issued on 12/13/2019
Issuing Office
Valley
Current Status
CofO Issued on 7/28/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/21/2019 APPLICANT
Assigned to Plan Check Engineer 11/21/2019 HAYATO TSUCHIYA
Corrections Issued 11/21/2019 HAYATO TSUCHIYA
Plan Check Approved 12/13/2019 LUIS RINCON
Issued 12/13/2019 LADBS
CofO in Progress 7/28/2020 CRAIG DAVIS
Permit Finaled 7/28/2020 VINCENT COTTON
CofO Issued 7/28/2020 VINCENT COTTON
Permit Finaled 7/28/2020 VINCENT COTTON

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 11/21/2019 ADRIAN CASTRO
Roof/Waste drainage to street Cleared 11/21/2019 ADRIAN CASTRO
Specific Plan Cleared 11/21/2019 ALBERT ISAGULIAN

Contact Information

Contractor Owner-Builder       ,
Engineer Zolfaghari,, Saeed; Lic. No.: C86761 6201 BEE AVE      AGOURA HILLS, CA 91301

Inspector Information

MORRIS JACKSON, (310) 914-3885 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 1/16/2020 Conditional Approval JUAN VALENZUELA
Footing/Foundation/Slab 1/27/2020 No Access for Inspection DAVID FEILER
METHANE-Barrier 1/27/2020 No Access for Inspection DAVID FEILER
METHANE-Subgrade 1/27/2020 No Access for Inspection DAVID FEILER
PLUMBING-Rough 1/27/2020 No Access for Inspection DAVID FEILER
Footing/Foundation/Slab 1/29/2020 Corrections Issued DAVID FEILER
METHANE-Barrier 1/29/2020 Not Ready for Inspection CRAIG DAVIS
METHANE-Subgrade 1/29/2020 Not Ready for Inspection DAVID FEILER
Deputy Drilled-In Anchors 2/18/2020 Conditional Approval CRAIG DAVIS
Footing/Foundation/Slab 2/20/2020 Corrections Issued CRAIG DAVIS
METHANE-Barrier 2/20/2020 Not Ready for Inspection CRAIG DAVIS
METHANE-Subgrade 2/20/2020 Not Ready for Inspection CRAIG DAVIS
Deputy Drilled-In Anchors 2/27/2020 Approved DAVID FEILER
Footing/Foundation/Slab 2/27/2020 Conditional Approval DAVID FEILER
METHANE-Barrier 2/27/2020 Not Ready for Inspection DAVID FEILER
METHANE-Subgrade 2/27/2020 Partial Inspection CRAIG DAVIS
PLUMBING-Rough 3/5/2020 Not Ready for Inspection JOHNNY MIRANDA
Wood Frame 3/5/2020 Not Ready for Inspection JOHNNY MIRANDA
Insulation 3/9/2020 Partial Approval JOHNNY MIRANDA
PLUMBING-Rough 3/9/2020 Partial Approval JOHNNY MIRANDA
BUILDING-Rough-Frame 3/10/2020 Partial Approval JOHNNY MIRANDA
Green Building Rough 3/10/2020 Not Ready for Inspection JOHNNY MIRANDA
MERV13>=Rough 3/10/2020 Not Ready for Inspection JOHNNY MIRANDA
METHANE-Rough 3/10/2020 Not Ready for Inspection JOHNNY MIRANDA
Floor/Roof Diaphrgm/Shear Wall 3/23/2020 Partial Approval JOHNNY MIRANDA
Green Building Rough 3/31/2020 Corrections Issued JOHNNY MIRANDA
BUILDING-Rough-Frame 4/1/2020 Partial Approval JOHNNY MIRANDA
Deputy Wood Construction 4/1/2020 Conditional Approval JOHNNY MIRANDA
MERV13>=Rough 4/1/2020 Approved JOHNNY MIRANDA
METHANE-Rough 4/1/2020 Approved JOHNNY MIRANDA
PLUMBING-Rough 4/1/2020 Approved JOHNNY MIRANDA
ELECTRICAL-Rough 4/6/2020 No Access for Inspection JOHNNY MIRANDA
Interior/Exterior Lathing 4/6/2020 No Access for Inspection JOHNNY MIRANDA
ELECTRICAL-Rough 4/7/2020 Corrections Issued JOHNNY MIRANDA
Interior/Exterior Lathing 4/7/2020 Partial Approval JOHNNY MIRANDA
ELECTRICAL-Rough 4/8/2020 Approved JOHNNY MIRANDA
Underground Mechanical 4/8/2020 Not Ready for Inspection JOHNNY MIRANDA
Insulation 4/10/2020 Conditional Approval JUAN VALENZUELA
Shower Pan 4/10/2020 Approved JUAN VALENZUELA
HVAC-Rough 4/15/2020 Approved JOHNNY MIRANDA
Wood Frame 4/15/2020 Approved JOHNNY MIRANDA
Drywall Nailing 4/20/2020 Partial Approval JOHNNY MIRANDA
Green Building Rough 4/20/2020 Approved JOHNNY MIRANDA
Interior/Exterior Lathing 4/20/2020 Approved JOHNNY MIRANDA
SGSOV-Seismic Gas S/O Valve 7/15/2020 SGSOV Not Ready JOHNNY MIRANDA
BUILDING-Rough-Frame 7/21/2020 Approved JOHNNY MIRANDA
Drywall Nailing 7/21/2020 Approved JOHNNY MIRANDA
Final 7/21/2020 Corrections Issued JOHNNY MIRANDA
Footing/Foundation/Slab 7/21/2020 Approved JOHNNY MIRANDA
Green Building Final 7/21/2020 Corrections Issued JOHNNY MIRANDA
MERV13>=Final 7/21/2020 Approved JOHNNY MIRANDA
METHANE-Barrier 7/21/2020 Approved JOHNNY MIRANDA
METHANE-Subgrade 7/21/2020 Approved JOHNNY MIRANDA
SGSOV-Seismic Gas S/O Valve 7/21/2020 SGSOV Approved JOHNNY MIRANDA
Smoke Detectors 7/21/2020 Approved JOHNNY MIRANDA
BUILDING-Rough-Frame 7/22/2020 Approved JOHNNY MIRANDA
Drywall Nailing 7/22/2020 Approved JOHNNY MIRANDA
ELECTRICAL-Final 7/22/2020 Approved JOHNNY MIRANDA
Final 7/22/2020 Partial Approval JOHNNY MIRANDA
Footing/Foundation/Slab 7/22/2020 Approved JOHNNY MIRANDA
Green Building Final 7/22/2020 Approved JOHNNY MIRANDA
HVAC-Final 7/22/2020 Approved JOHNNY MIRANDA
MERV13>=Final 7/22/2020 Approved JOHNNY MIRANDA
METHANE-Barrier 7/22/2020 Approved JOHNNY MIRANDA
METHANE-Subgrade 7/22/2020 Approved JOHNNY MIRANDA
PLUMBING-Final 7/22/2020 Approved JOHNNY MIRANDA
SGSOV-Seismic Gas S/O Valve 7/22/2020 SGSOV Approved JOHNNY MIRANDA
Smoke Detectors 7/22/2020 Approved JOHNNY MIRANDA