1037 N MARONEY LANE 90272

Certificate Information: 1037 N MARONEY LANE 90272

Application / Permit
19014-20000-05927
Plan Check / Job No.
B19VN18940
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL OF SINGLE FAMILY DWELLING AND REPLACE (E) GARAGE WITH (N) 24'-10" X 24'-4" GARAGE WITH ADDITION OF 2ND FLOOR AND OPEN ROOF DECK ON PILES ALL WORK PER ENGINEERING
Permit Issued
Issued on 6/23/2022
Issuing Office
Current Status
Issued on 6/23/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 10/31/2019 APPLICANT
Assigned to Plan Check Engineer 11/26/2019 SEWADA ZADOORIAN MILAGARDI
Green Plans Picked Up 12/5/2019 APPLICANT
Corrections Issued 12/6/2019 SEWADA ZADOORIAN MILAGARDI
Quality Review Completed 12/13/2019 OMID HEDAYAT
Building Plans Picked Up 12/27/2019 APPLICANT
Applicant returned to address corrections 11/16/2021 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 6/4/2022 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 6/6/2022 SEWADA ZADOORIAN MILAGARDI
Plan Check Approved 6/23/2022 SEWADA ZADOORAN MILAGARDI
Issued 6/23/2022 APPLICANT

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 12/31/2019 GUILLERMO PETRA
BHO/Hillside ordinance Cleared 12/31/2019 GUILLERMO PETRA
BHO/Hillside ordinance Cleared 12/31/2019 GUILLERMO PETRA
Eng Process Fee Ord 176,300 Cleared 12/31/2019 GUILLERMO PETRA
Permit Cleared 12/31/2019 GUILLERMO PETRA
Watercourse Cleared 12/31/2019 GUILLERMO PETRA
Hydrant and Access approval Cleared 1/24/2020 GEORGE SUCHAND
Trees in Parkway Cleared 2/18/2020 JOHN KIM
Green Code Cleared 3/9/2020 DAVID MATSON
Low Impact Development Cleared 3/17/2020 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 3/17/2020 THOMAS LANG
Work Adjacent to Public Way Cleared 4/14/2020 SAUL GARCIA
Coastal Zone Cleared 5/15/2020 STEVEN WECHSLER
ZI Cleared 5/15/2020 STEVEN WECHSLER
Disturb/Remove Protected Trees Cleared 9/10/2020 STEPHEN DUPREY
BHO/Hillside ordinance Cleared 9/24/2021 DINAH GARIN
GPI Written Notices Cleared 6/23/2022 SEWADA ZADOORAN MILAGARDI
Grading Pre-Inspection Cleared 6/23/2022 SEWADA ZADOORAN MILAGARDI

Contact Information

Contractor S O D Home Group Inc; Lic. No.: 942085-B 1617 COSMO ST #403      LOS ANGELES, CA 90028
Engineer Burnazyan,, Gegam; Lic. No.: C76761 5832 JAMIESON AVE      ENCINO, CA 91316
Geologist Bovenizer,, Ernest; Lic. No.: EG2515 7622 GODDARD AVENUE      LOS ANGELES, CA 90045

Inspector Information

DANIEL VERA, (213) 577-9924 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Gas Test 10/13/2022 Corrections Issued CLAYTON GRAHAM
Gas Test 10/17/2022 Corrections Issued BRENDAN LOONEY
PLUMBING-Rough 10/17/2022 Not Ready for Inspection BRENDAN LOONEY
Pre-Inspection 10/17/2022 Corrections Issued BRENDAN LOONEY
Gas Test 10/18/2022 Partial Approval BRENDAN LOONEY
Piling/Pier/Caisson 10/31/2022 Partial Approval KEVIN SARGSYAN
Deputy Reinf. Concrete 11/4/2022 Conditional Approval BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 11/23/2022 Not Ready for Inspection BRENDAN LOONEY
Piling/Pier/Caisson 11/23/2022 Corrections Issued BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 11/29/2022 Partial Approval BRENDAN LOONEY
Deputy Reinf. Concrete 11/30/2022 Conditional Approval BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 12/22/2022 Corrections Issued BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 12/29/2022 Partial Approval BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 1/20/2023 Corrections Issued DAVID FEILER
Footing/Foundation/Slab 1/20/2023 Not Ready for Inspection DAVID FEILER
Excavation/Setback/Form/Re-Bar 1/24/2023 Partial Approval BRENDAN LOONEY
Deputy Reinf. Concrete 1/26/2023 Conditional Approval BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 1/30/2023 Partial Approval BRENDAN LOONEY
Deputy Reinf. Concrete 2/1/2023 Conditional Approval BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 2/13/2023 Corrections Issued BRENDAN LOONEY
Deputy Reinf. Concrete 2/14/2023 Conditional Approval BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 2/21/2023 Partial Approval KENNETH NAGLE
Footing/Foundation/Slab 2/21/2023 Partial Approval KENNETH NAGLE
Deputy Reinf. Concrete 2/23/2023 No Access for Inspection KENNETH NAGLE
Excavation/Setback/Form/Re-Bar 3/7/2023 Corrections Issued BRENDAN LOONEY
Deputy Reinf. Concrete 3/8/2023 Conditional Approval BRENDAN LOONEY
Deputy Wood Construction 4/18/2023 Approved BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 4/18/2023 Conditional Approval BRENDAN LOONEY
Deputy Wood Construction 5/3/2023 Conditional Approval BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 5/4/2023 Partial Approval BRENDAN LOONEY
PLUMBING-Rough 6/2/2023 Approved KENNETH NAGLE
ELECTRICAL-Rough 7/12/2023 Corrections Issued GERMAN RODRIGUEZ MENDOZA
HVAC-Rough 7/12/2023 Corrections Issued GERMAN RODRIGUEZ MENDOZA
ELECTRICAL-Rough 7/18/2023 Approved GERMAN RODRIGUEZ MENDOZA
HVAC-Rough 7/18/2023 Approved GERMAN RODRIGUEZ MENDOZA
Wood Frame 7/18/2023 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Deputy Wood Construction 7/20/2023 No Access for Inspection KENNETH NAGLE
BUILDING-Rough-Frame 7/21/2023 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
FLOOD-Proofing Certificate 7/21/2023 Approved GERMAN RODRIGUEZ MENDOZA
Green Building Rough 7/21/2023 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Insulation 7/21/2023 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
BUILDING-Rough-Frame 7/25/2023 Approved Pending GreenApproval GERMAN RODRIGUEZ MENDOZA
Interior/Exterior Lathing 9/7/2023 Corrections Issued EVAN COOPER
Shower Pan 9/7/2023 Corrections Issued EVAN COOPER
Interior/Exterior Lathing 9/11/2023 Partial Approval ARAM AVEDISIAN
Shower Pan 9/11/2023 Approved ARAM AVEDISIAN
Interior/Exterior Lathing 11/8/2023 Corrections Issued EVAN COOPER