4524 E TOLAND WAY 90041

Certificate Information: 4524 E TOLAND WAY 90041

Application / Permit
19014-20000-05611
Plan Check / Job No.
B19VN17684
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL OF (E) SFD TO CONVERT STORAGE TO LAUNDRY ROOM , UPGRADE MECHANICAL ROOM AT BASEMENT, REMOVE WALLS BETWEEN KITCHEN , LAUNDRY , DINING ROOM , BEDROOM AND BATHROOM TO ENLARGE AND REMODEL KITCHEN AND CREATE NEW PANTRY ROOM AND POWDER ROOM AT 1ST FLOOR,, REMODEL DINING ROOM , LIVING ROOM AND ENTRY ,INSTALL NEW HANDRAILS AT EXTERIOR DECK AND BALCONY, CONVERT MASTER BEDROOM AND MASTER BATHROOM INTO (2) BEDROOMS , (2) CLOSETS, (2) BATHROOMS , CONVERT MASTER W.I.C. TO NOOK , INFILL 17' X 14' CEILING AREA WITH NEW FLOOR JOISTS TO CREATE NEW BEDROOM , CLOSET AND BATHROOM , CONVERT DEN TO BEDROOM , CLOSET AND BATHROOM AT 2ND FLOOR ,DOORS AND WINDOWS CHANGEOUT , Re-roof with Class A roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing 12.5 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). ALL WORK PER ENGINEERING
Permit Issued
Issued on 3/18/2020
Issuing Office
Valley
Current Status
CofO Issued on 2/6/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/15/2019 APPLICANT
Green Plans Picked Up 10/22/2019 APPLICANT
Assigned to Plan Check Engineer 10/24/2019 RARES BODEA
Corrections Issued 10/27/2019 RARES BODEA
Quality Review Completed 10/29/2019 GUANG MIN TUNG
Building Plans Picked Up 11/4/2019 APPLICANT
Plan Check Approved 1/9/2020 RARES BODEA
Issued 3/18/2020 LADBS
CofO in Progress 1/27/2021 HAMIK HARTOUNIAN
Permit Finaled 2/6/2021 DEROLD HAUFF
CofO Issued 2/6/2021 DEROLD HAUFF
Permit Finaled 2/6/2021 DEROLD HAUFF

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 12/4/2019 GUILLERMO PETRA
Green Code Cleared 12/4/2019 DAVID MATSON
Hydrant and Access approval Cleared 12/4/2019 GEORGE SUCHAND
Roof/Waste drainage to street Cleared 12/4/2019 GUILLERMO PETRA
Sewer availability Cleared 12/4/2019 GUILLERMO PETRA
Tract Map conditions Cleared 12/11/2019 HERMINIGILDO AGUSTIN
Housing rent stabilization Cleared 1/8/2020 MICHAEL SOTO
Grading Pre-Inspection Cleared 1/9/2020 RARES BODEA

Contact Information

Architect Zentmyer,, Brian Miles; Lic. No.: C35377 1434 FOOTHILL BLVD      LA CANADA, CA 91011
Contractor Landmark Building & Design Inc; Lic. No.: 982610-B 4717 VAN NUYS BLVD STE 104      SHERMAN OAKS, CA 91403
Engineer Chiu,, Ivan Wai-Kuen; Lic. No.: C44672 2160 PARNELL WY      ALTADENA, CA 91001

Inspector Information

NICHOLAS LOPEZ, (213) 202-3224 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Green Building Rough 4/20/2020 Not Ready for Inspection HAMIK HARTOUNIAN
Pre-Inspection 4/20/2020 Approved HAMIK HARTOUNIAN
BUILDING-Rough-Frame 4/27/2020 Not Ready for Inspection HAMIK HARTOUNIAN
ELECTRICAL-Rough 4/27/2020 Corrections Issued HAMIK HARTOUNIAN
Footing/Foundation/Slab 4/27/2020 Approved HAMIK HARTOUNIAN
PLUMBING-Rough 4/27/2020 Approved HAMIK HARTOUNIAN
BUILDING-Rough-Frame 5/1/2020 Corrections Issued HAMIK HARTOUNIAN
HVAC-Rough 5/1/2020 Corrections Issued HAMIK HARTOUNIAN
BUILDING-Rough-Frame 5/11/2020 Approved HAMIK HARTOUNIAN
ELECTRICAL-Rough 5/11/2020 Approved HAMIK HARTOUNIAN
HVAC-Rough 5/11/2020 Approved HAMIK HARTOUNIAN
Interior/Exterior Lathing 5/11/2020 Partial Approval HAMIK HARTOUNIAN
Insulation 5/18/2020 Conditional Approval CHRISTOPHER DELLEFIELD
Drywall Nailing 5/26/2020 Approved HAMIK HARTOUNIAN
Insulation 5/26/2020 Approved HAMIK HARTOUNIAN
Interior/Exterior Lathing 6/17/2020 No Access for Inspection HAMIK HARTOUNIAN
Interior/Exterior Lathing 6/18/2020 Approved HAMIK HARTOUNIAN
BUILDING-Rough-Frame 12/10/2020 Corrections Issued HAMIK HARTOUNIAN
Final 12/10/2020 Corrections Issued HAMIK HARTOUNIAN
Green Building Final 12/10/2020 Corrections Issued HAMIK HARTOUNIAN
Green Building Rough 12/10/2020 Approved HAMIK HARTOUNIAN
SGSOV-Seismic Gas S/O Valve 12/10/2020 SGSOV Not Ready HAMIK HARTOUNIAN
Smoke Detectors 12/10/2020 Approved HAMIK HARTOUNIAN
BUILDING-Rough-Frame 1/5/2021 Approved HAMIK HARTOUNIAN
ELECTRICAL-Final 1/5/2021 Approved HAMIK HARTOUNIAN
Final 1/5/2021 Not Ready for Inspection HAMIK HARTOUNIAN
Green Building Final 1/5/2021 Corrections Issued HAMIK HARTOUNIAN
SGSOV-Seismic Gas S/O Valve 1/5/2021 SGSOV Approved HAMIK HARTOUNIAN
Final 1/26/2021 OK to Issue CofO HAMIK HARTOUNIAN
Green Building Final 1/26/2021 Approved HAMIK HARTOUNIAN