4524 E TOLAND WAY 90041
Certificate Information: 4524 E TOLAND WAY 90041
- Application / Permit
- 19014-20000-05611
- Plan Check / Job No.
- B19VN17684
- Group
- Building
- Type
- Bldg-Addition
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- REMODEL OF (E) SFD TO CONVERT STORAGE TO LAUNDRY ROOM , UPGRADE MECHANICAL ROOM AT BASEMENT, REMOVE WALLS BETWEEN KITCHEN , LAUNDRY , DINING ROOM , BEDROOM AND BATHROOM TO ENLARGE AND REMODEL KITCHEN AND CREATE NEW PANTRY ROOM AND POWDER ROOM AT 1ST FLOOR,, REMODEL DINING ROOM , LIVING ROOM AND ENTRY ,INSTALL NEW HANDRAILS AT EXTERIOR DECK AND BALCONY, CONVERT MASTER BEDROOM AND MASTER BATHROOM INTO (2) BEDROOMS , (2) CLOSETS, (2) BATHROOMS , CONVERT MASTER W.I.C. TO NOOK , INFILL 17' X 14' CEILING AREA WITH NEW FLOOR JOISTS TO CREATE NEW BEDROOM , CLOSET AND BATHROOM , CONVERT DEN TO BEDROOM , CLOSET AND BATHROOM AT 2ND FLOOR ,DOORS AND WINDOWS CHANGEOUT , Re-roof with Class A roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing 12.5 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). ALL WORK PER ENGINEERING
- Permit Issued
- Issued on 3/18/2020
- Issuing Office
- Valley
- Current Status
- CofO Issued on 2/6/2021
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 10/15/2019 | APPLICANT |
| Green Plans Picked Up | 10/22/2019 | APPLICANT |
| Assigned to Plan Check Engineer | 10/24/2019 | RARES BODEA |
| Corrections Issued | 10/27/2019 | RARES BODEA |
| Quality Review Completed | 10/29/2019 | GUANG MIN TUNG |
| Building Plans Picked Up | 11/4/2019 | APPLICANT |
| Plan Check Approved | 1/9/2020 | RARES BODEA |
| Issued | 3/18/2020 | LADBS |
| CofO in Progress | 1/27/2021 | HAMIK HARTOUNIAN |
| Permit Finaled | 2/6/2021 | DEROLD HAUFF |
| CofO Issued | 2/6/2021 | DEROLD HAUFF |
| Permit Finaled | 2/6/2021 | DEROLD HAUFF |
Permit Application Clearance Information
| Eng Process Fee Ord 176,300 | Cleared | 12/4/2019 | GUILLERMO PETRA |
| Green Code | Cleared | 12/4/2019 | DAVID MATSON |
| Hydrant and Access approval | Cleared | 12/4/2019 | GEORGE SUCHAND |
| Roof/Waste drainage to street | Cleared | 12/4/2019 | GUILLERMO PETRA |
| Sewer availability | Cleared | 12/4/2019 | GUILLERMO PETRA |
| Tract Map conditions | Cleared | 12/11/2019 | HERMINIGILDO AGUSTIN |
| Housing rent stabilization | Cleared | 1/8/2020 | MICHAEL SOTO |
| Grading Pre-Inspection | Cleared | 1/9/2020 | RARES BODEA |
Contact Information
| Architect | Zentmyer,, Brian Miles; Lic. No.: C35377 | 1434 FOOTHILL BLVD LA CANADA, CA 91011 |
| Contractor | Landmark Building & Design Inc; Lic. No.: 982610-B | 4717 VAN NUYS BLVD STE 104 SHERMAN OAKS, CA 91403 |
| Engineer | Chiu,, Ivan Wai-Kuen; Lic. No.: C44672 | 2160 PARNELL WY ALTADENA, CA 91001 |
Inspector Information
| NICHOLAS LOPEZ, (213) 202-3224 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Green Building Rough | 4/20/2020 | Not Ready for Inspection | HAMIK HARTOUNIAN |
| Pre-Inspection | 4/20/2020 | Approved | HAMIK HARTOUNIAN |
| BUILDING-Rough-Frame | 4/27/2020 | Not Ready for Inspection | HAMIK HARTOUNIAN |
| ELECTRICAL-Rough | 4/27/2020 | Corrections Issued | HAMIK HARTOUNIAN |
| Footing/Foundation/Slab | 4/27/2020 | Approved | HAMIK HARTOUNIAN |
| PLUMBING-Rough | 4/27/2020 | Approved | HAMIK HARTOUNIAN |
| BUILDING-Rough-Frame | 5/1/2020 | Corrections Issued | HAMIK HARTOUNIAN |
| HVAC-Rough | 5/1/2020 | Corrections Issued | HAMIK HARTOUNIAN |
| BUILDING-Rough-Frame | 5/11/2020 | Approved | HAMIK HARTOUNIAN |
| ELECTRICAL-Rough | 5/11/2020 | Approved | HAMIK HARTOUNIAN |
| HVAC-Rough | 5/11/2020 | Approved | HAMIK HARTOUNIAN |
| Interior/Exterior Lathing | 5/11/2020 | Partial Approval | HAMIK HARTOUNIAN |
| Insulation | 5/18/2020 | Conditional Approval | CHRISTOPHER DELLEFIELD |
| Drywall Nailing | 5/26/2020 | Approved | HAMIK HARTOUNIAN |
| Insulation | 5/26/2020 | Approved | HAMIK HARTOUNIAN |
| Interior/Exterior Lathing | 6/17/2020 | No Access for Inspection | HAMIK HARTOUNIAN |
| Interior/Exterior Lathing | 6/18/2020 | Approved | HAMIK HARTOUNIAN |
| BUILDING-Rough-Frame | 12/10/2020 | Corrections Issued | HAMIK HARTOUNIAN |
| Final | 12/10/2020 | Corrections Issued | HAMIK HARTOUNIAN |
| Green Building Final | 12/10/2020 | Corrections Issued | HAMIK HARTOUNIAN |
| Green Building Rough | 12/10/2020 | Approved | HAMIK HARTOUNIAN |
| SGSOV-Seismic Gas S/O Valve | 12/10/2020 | SGSOV Not Ready | HAMIK HARTOUNIAN |
| Smoke Detectors | 12/10/2020 | Approved | HAMIK HARTOUNIAN |
| BUILDING-Rough-Frame | 1/5/2021 | Approved | HAMIK HARTOUNIAN |
| ELECTRICAL-Final | 1/5/2021 | Approved | HAMIK HARTOUNIAN |
| Final | 1/5/2021 | Not Ready for Inspection | HAMIK HARTOUNIAN |
| Green Building Final | 1/5/2021 | Corrections Issued | HAMIK HARTOUNIAN |
| SGSOV-Seismic Gas S/O Valve | 1/5/2021 | SGSOV Approved | HAMIK HARTOUNIAN |
| Final | 1/26/2021 | OK to Issue CofO | HAMIK HARTOUNIAN |
| Green Building Final | 1/26/2021 | Approved | HAMIK HARTOUNIAN |