3131 N DONA MARIA DR 91604

Certificate Information: 3131 N DONA MARIA DR 91604

Application / Permit
19014-20000-05354
Plan Check / Job No.
B19VN16728
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 9' X 10'7-1/4" SECOND FLOOR ADDITION TO (E) SFD UNDER EXISTING ROOF TO CREATE A NEW BATHROOM , INTERIOR REMODEL TO (E) SFD TO REMODEL GARAGE , DINING ROOM , KITCHEN, LIVING ROOM AND FAMILY ROOM AT 1ST FLOOR , INTERIOR REMODEL TO SECOND FLOOR TO REMODEL MASTER BATHROOM, MASTER BEDROOM AND W.I.C. , DOORS AND WINDOWS CHANGEOUT , ALL WORK PER ENGINEERING
Permit Issued
Issued on 3/10/2020
Issuing Office
Valley
Current Status
Issued on 3/10/2020
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 10/1/2019 APPLICANT
Green Plans Picked Up 10/9/2019 APPLICANT
Assigned to Plan Check Engineer 10/10/2019 RARES BODEA
Corrections Issued 10/14/2019 RARES BODEA
Quality Review Completed 10/16/2019 GUANG MIN TUNG
Building Plans Picked Up 10/17/2019 APPLICANT
Applicant returned to address corrections 12/16/2019 RARES BODEA
Plan Check Approved 3/2/2020 RARES BODEA
Issued 3/10/2020 LADBS

Permit Application Clearance Information

Grading Pre-Inspection Cleared 10/29/2019 PATRICK MISCHLICH
Eng Process Fee Ord 176,300 Cleared 10/30/2019 ADRIAN CASTRO
Roof/Waste drainage to street Cleared 10/30/2019 ADRIAN CASTRO
Sewer availability Cleared 10/30/2019 ADRIAN CASTRO
Green Code Cleared 12/17/2019 AARON COSTA
Specific Plan Cleared 12/19/2019 LIZZI BEDUYA
ZI Cleared 12/19/2019 LIZZI BEDUYA
Hydrant and Access approval Cleared 2/27/2020 GEORGE SUCHAND

Contact Information

Architect Scrafano,, Elissa F; Lic. No.: C26071 163 N SYCAMORE      LOS ANGELES, CA 90036
Contractor Manasse Inc; Lic. No.: 607634-B 29059 RAINTREE LN      SAUGUS, CA 91390
Engineer Manalo,, Philip Casis; Lic. No.: S3823 9547 WYSTONE AVE      NORTHRIDGE, CA 91324

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 3/17/2020 Approved ARAM AVEDISIAN
BUILDING-Rough-Frame 4/16/2020 Approved JOHN HAYES
ELECTRICAL-Rough 4/16/2020 Approved JOHN HAYES
Floor/Roof Diaphrgm/Shear Wall 4/16/2020 Approved JOHN HAYES
Green Building Rough 4/16/2020 Approved JOHN HAYES
HVAC-Rough 4/16/2020 Not Ready for Inspection JOHN HAYES
PLUMBING-Rough 4/16/2020 Not Ready for Inspection JOHN HAYES
Drywall Nailing 4/27/2020 Approved MATTHEW NELSON
Insulation 4/27/2020 Approved MATTHEW NELSON
Shower Pan 4/27/2020 Approved MATTHEW NELSON
Special/Order Compliance 4/27/2020 Approved GREGG CUMMINGS
Final 9/29/2020 Corrections Issued ARAM AVEDISIAN
Green Building Final 9/29/2020 Approved ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 9/29/2020 SGSOV Not Ready ARAM AVEDISIAN
Smoke Detectors 9/29/2020 Not Ready for Inspection ARAM AVEDISIAN
Final 10/28/2020 Not Ready for Inspection ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 10/28/2020 SGSOV Approved ARAM AVEDISIAN
Smoke Detectors 10/28/2020 Not Ready for Inspection ARAM AVEDISIAN
Final 11/24/2020 Not Ready for Inspection ARAM AVEDISIAN
Smoke Detectors 11/24/2020 Approved ARAM AVEDISIAN