20013 W ENADIA WAY 91306

Certificate Information: 20013 W ENADIA WAY 91306

Application / Permit
19014-20000-04318
Plan Check / Job No.
B19VN13337
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
Add 18'4" x 9' to and convert 18'1" x 20'1" detached garage to accessory dwelling unit per AB494 & SB229, Add 20'1" x 5'10" attached patio cover, repair fire damaged interior . All works are per design
Permit Issued
Issued on 11/8/2019
Issuing Office
Valley
Current Status
Issued on 11/8/2019
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/9/2019 APPLICANT
Assigned to Plan Check Engineer 8/9/2019 ALDOUS CHIC
Corrections Issued 8/9/2019 ALDOUS CHIC
Issued 11/8/2019 LADBS

Permit Application Clearance Information

Address approval Cleared 8/9/2019 SAFA JAVANMARDI
Eng Process Fee Ord 176,300 Cleared 8/9/2019 SAFA JAVANMARDI
Roof/Waste drainage to street Cleared 8/9/2019 SAFA JAVANMARDI
Sewer availability Cleared 8/9/2019 SAFA JAVANMARDI
Hold Cleared 1/13/2020 LOURDES RAMIRO

Contact Information

Contractor Homecrafters; Lic. No.: 657087-B P O BOX 55      SIMI VALLEY, CA 930620055
Engineer Basma,, Ali J; Lic. No.: C53080 21500 WYANDOTTE ST 106      CANOGA PARK, CA 91303

Inspector Information

ALEXANDER HANDY, (818) 774-4317 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 11/13/2019 Not Ready for Inspection DAVID SANDOVAL
Pre-Inspection 11/13/2019 Approved DAVID SANDOVAL
Excavation/Setback/Form/Re-Bar 1/17/2020 Partial Approval HENRY KIM
PLUMBING-Rough 1/17/2020 Not Ready for Inspection HENRY KIM
Underground Mechanical 1/17/2020 Not Ready for Inspection HENRY KIM
Excavation/Setback/Form/Re-Bar 1/24/2020 Approved HENRY KIM
Gas Test 1/24/2020 Not Ready for Inspection HENRY KIM
Underground Mechanical 1/24/2020 Partial Approval HENRY KIM
Deputy Drilled-In Anchors 2/7/2020 Conditional Approval HENRY KIM
Pre-Inspection 2/14/2020 Approved HENRY KIM
BUILDING-Rough-Frame 2/25/2020 Not Ready for Inspection HENRY KIM
Floor/Roof Diaphrgm/Shear Wall 2/25/2020 Partial Approval HENRY KIM
BUILDING-Rough-Frame 10/26/2020 Corrections Issued HENRY KIM
ELECTRICAL-Rough 10/26/2020 Corrections Issued HENRY KIM
Floor/Roof Diaphrgm/Shear Wall 10/26/2020 Partial Approval HENRY KIM
PLUMBING-Rough 10/26/2020 Corrections Issued HENRY KIM
Sewer 10/26/2020 Corrections Issued HENRY KIM
Underground Mechanical 10/26/2020 Corrections Issued HENRY KIM
ELECTRICAL-Rough 4/20/2021 Approved HENRY KIM
Interior/Exterior Lathing 4/20/2021 Partial Approval HENRY KIM
PLUMBING-Rough 4/20/2021 Corrections Issued HENRY KIM
Sewer 4/20/2021 Corrections Issued HENRY KIM
Underground Mechanical 4/20/2021 Corrections Issued HENRY KIM
Sewer 5/3/2021 Approved HENRY KIM
BUILDING-Rough-Frame 1/31/2022 Corrections Issued STEVEN BACK
Underground Mechanical 1/31/2022 Approved STEVEN BACK
Deputy Drilled-In Anchors 3/22/2022 Conditional Approval JESUS PINEDA
Excavation/Setback/Form/Re-Bar 3/29/2022 Approved STEVEN BACK
ELECTRICAL-Rough 3/29/2023 Corrections Issued JON MCHUGH
HVAC-Rough 3/29/2023 Corrections Issued JON MCHUGH
Interior/Exterior Lathing 3/29/2023 Partial Approval JON MCHUGH
PLUMBING-Rough 3/29/2023 Corrections Issued JON MCHUGH
BUILDING-Rough-Frame 8/15/2023 Approved ALEXANDER HANDY
Green Building Rough 8/15/2023 Approved ALEXANDER HANDY
Rough-Elec/Plmb/HVAC 8/15/2023 Approved ALEXANDER HANDY
HVAC-Rough 8/28/2025 Not Ready for Inspection SCOTT SOBEL
Insulation 8/28/2025 Approved SCOTT SOBEL
Drywall Nailing 9/25/2025 Approved ALEXANDER HANDY
Interior/Exterior Lathing 9/25/2025 Not Ready for Inspection ALEXANDER HANDY
Interior/Exterior Lathing 10/1/2025 Approved ALEXANDER HANDY