11028 W CALIFA ST 91601

Certificate Information: 11028 W CALIFA ST 91601

Application / Permit
19014-20000-04103
Plan Check / Job No.
B19VN12645
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
Remove all on grade structure of detached garage except slab and 18' (L) East side wall with footing, rebuild with irregular shape 37'4" x 29'3" addition for new accessory dwelling unit and attached patio cover per AB494 & SB229. All works are per design
Permit Issued
Issued on 9/3/2020
Issuing Office
Valley
Current Status
CofO Issued on 7/17/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/30/2019 APPLICANT
Assigned to Plan Check Engineer 7/30/2019 ALDOUS CHIC
Corrections Issued 7/30/2019 ALDOUS CHIC
Plan Check Approved 9/24/2019 ALDOUS CHIC
Issued 9/3/2020 APPLICANT
CofO in Progress 3/4/2021 DANIEL DREW
CofO Issued 7/17/2021 MICHAEL SMITH
Permit Finaled 7/17/2021 MICHAEL SMITH

Permit Application Clearance Information

Address approval Cleared 7/30/2019 ERIK BEASLEY
Roof/Waste drainage to street Cleared 7/30/2019 ERIK BEASLEY
Eng Process Fee Ord 176,300 Cleared 9/3/2019 GABRIEL ROBLES
Sewer availability Cleared 9/3/2019 GABRIEL ROBLES
Low Impact Development Cleared 9/24/2019 ANDRES COVARRUBIAS

Contact Information

Contractor Armscraft Construction Inc; Lic. No.: 905702-B 1125 E BROADWAY #15      GLENDALE, CA 91205
Engineer , ; Lic. No.: C89103 1010 RALEIGH ST   APT 107    GLENDALE, CA 91205

Inspector Information

GAREN HAYRAPETYAN, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI
ROBERTO PALACIOS-LOPEZ, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/9/2020 Approved DANIEL DREW
Excavation/Setback/Form/Re-Bar 9/28/2020 Partial Approval DANIEL DREW
PLUMBING-Rough 10/9/2020 Partial Approval DANIEL DREW
Excavation/Setback/Form/Re-Bar 10/19/2020 Not Ready for Inspection THOMAS FINNILA
Footing/Foundation/Slab 10/19/2020 Corrections Issued THOMAS FINNILA
Excavation/Setback/Form/Re-Bar 10/22/2020 Approved DANIEL DREW
ELECTRICAL-Rough 11/30/2020 Partial Approval DAVID MATSON
Floor/Roof Diaphrgm/Shear Wall 11/30/2020 Partial Approval DAVID MATSON
PLUMBING-Rough 11/30/2020 Approved DAVID MATSON
BUILDING-Rough-Frame 12/1/2020 Not Ready for Inspection THOMAS FINNILA
HVAC-Rough 12/1/2020 Approved THOMAS FINNILA
Sewer 12/1/2020 Corrections Issued THOMAS FINNILA
Sewer 12/7/2020 Approved DANIEL DREW
Shower Pan 12/7/2020 Approved DANIEL DREW
Floor/Roof Diaphrgm/Shear Wall 12/10/2020 Approved DANIEL DREW
Interior/Exterior Lathing 12/10/2020 Approved DANIEL DREW
BUILDING-Rough-Frame 12/11/2020 Approved DANIEL DREW
Green Building Rough 12/11/2020 Approved DANIEL DREW
Interior/Exterior Lathing 12/11/2020 Not Ready for Inspection DANIEL DREW
Insulation 12/16/2020 Conditional Approval DANIEL DREW
Insulation 12/21/2020 Approved DANIEL DREW
Interior/Exterior Lathing 12/21/2020 Approved DANIEL DREW
Drywall Nailing 12/24/2020 Approved DANIEL DREW
Service/Power Release 1/26/2021 Not Ready for Inspection DANIEL DREW
ELECTRICAL-Final 2/4/2021 Approved DANIEL DREW
HVAC-Final 2/4/2021 Corrections Issued DANIEL DREW
PLUMBING-Final 2/4/2021 Approved DANIEL DREW
HVAC-Final 2/16/2021 Approved DANIEL DREW
Service/Power Release 2/16/2021 Not Ready for Inspection DANIEL DREW
Footing/Foundation/Slab 3/3/2021 Approved DANIEL DREW
Green Building Final 3/3/2021 Approved DANIEL DREW
SGSOV-Seismic Gas S/O Valve 3/3/2021 SGSOV Not Ready DANIEL DREW
Smoke Detectors 3/3/2021 Approved DANIEL DREW
Final 3/4/2021 OK to Issue CofO DANIEL DREW
SGSOV-Seismic Gas S/O Valve 3/4/2021 SGSOV Approved DANIEL DREW
Service/Power Release 3/4/2021 Approved DANIEL DREW