17127-17129 W LANARK ST 91406

Certificate Information: 17127-17129 W LANARK ST 91406

Application / Permit
19014-20000-03792
Plan Check / Job No.
B19VN11708
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
Proposed (8' x 39'-6" & 26'x 9'-6' & 4' x 12' TOTAL 420 SF) irregular shaped ADDITION to enlarge bedroom, living room, bathroom, & laundry room. Addition of a 9'-0" x 39'-6" trellis at rear of dwelling. Remodel kitchen, bathroom, & bedroom, change out 7 windows (same location/size, dual glazing, existing header remains). CONVERT (18'-6" x 20') family room to Accessory Dwelling Unit per AB494 & SB229. All works are per design.
Permit Issued
Issued on 2/6/2020
Issuing Office
Valley
Current Status
CofO Issued on 3/9/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/16/2019 APPLICANT
Assigned to Plan Check Engineer 7/16/2019 ALDOUS CHIC
Corrections Issued 7/16/2019 ALDOUS CHIC
Applicant returned to address corrections 1/29/2020 LUIS RINCON
Plan Check Approved 2/6/2020 LUIS RINCON
Issued 2/6/2020 LADBS
CofO in Progress 2/5/2021 ARTHUR SARGSYAN
CofO in Progress 2/5/2021 ARTHUR SARGSYAN
Permit Finaled 3/9/2022 MICHAEL SMITH
CofO Issued 3/9/2022 MICHAEL SMITH
Permit Finaled 3/9/2022 MICHAEL SMITH

Permit Application Clearance Information

Address approval Cleared 7/16/2019 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 7/16/2019 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 7/16/2019 LEE GUILBEAUX
Sewer availability Cleared 7/16/2019 LEE GUILBEAUX
Miscellaneous Cleared 8/1/2019 APEKSHYA BAJRACHARYA

Contact Information

Contractor Owner-Builder       ,
Engineer Basma,, Ali J; Lic. No.: C53080 21500 WYANDOTTE ST 106      CANOGA PARK, CA 91303

Inspector Information

MICHAEL CORTEZ, (818) 374-1176 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 5/26/2020 Partial Approval CHARLES POWELL
Footing/Foundation/Slab 6/17/2020 Approved WILLIAM KUEHN
Deputy Reinf. Concrete 6/19/2020 No Access for Inspection MICHEL ABAJAN
Floor/Roof Diaphrgm/Shear Wall 7/6/2020 Approved DANIEL DREW
Floor/Roof Diaphrgm/Shear Wall 7/13/2020 Approved DANIEL DREW
BUILDING-Rough-Frame 8/7/2020 Partial Approval WILLIAM KUEHN
Green Building Rough 8/7/2020 Not Ready for Inspection WILLIAM KUEHN
ELECTRICAL-Rough 9/8/2020 Approved VINCENT HANLEY
Interior/Exterior Lathing 9/8/2020 Not Ready for Inspection VINCENT HANLEY
PLUMBING-Rough 9/8/2020 Approved VINCENT HANLEY
HVAC-Rough 9/15/2020 Partial Approval WILLIAM KUEHN
Shower Pan 9/15/2020 Approved WILLIAM KUEHN
Insulation 9/21/2020 Approved WILLIAM KUEHN
Drywall Nailing 9/30/2020 Approved JENNIFER RABUCHIN
Green Building Rough 9/30/2020 Approved JENNIFER RABUCHIN
Interior/Exterior Lathing 9/30/2020 Approved JENNIFER RABUCHIN
BUILDING-Rough-Frame 2/4/2021 Approved ARTHUR SARGSYAN
Final 2/4/2021 OK to Issue CofO ARTHUR SARGSYAN
Green Building Final 2/4/2021 Approved ARTHUR SARGSYAN
SGSOV-Seismic Gas S/O Valve 2/4/2021 SGSOV Approved ARTHUR SARGSYAN
Smoke Detectors 2/4/2021 Approved ARTHUR SARGSYAN