12995 W GALEWOOD ST 91604

Certificate Information: 12995 W GALEWOOD ST 91604

Application / Permit
19014-20000-03756
Plan Check / Job No.
B19VN11635
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
10'-0" X 16'-6" IRREGULAR SHAPE ADDITION TO (E) SINGLE FAMILY DWELLING FOR (2) BATHROOMS. ENCLOSE 7'-0" X 14'-0" COVERED ROOF AREA AT REAR AND 9'-9" X 22'-6" AREA OF (E) BREEZEWAY TO LIVING SPACE. REMODEL KITCHEN, LIVING ROOM, AND RESTROOMS. CONVERT (E) RECREATION ROOM ABOVE (E) ATTACHED GARAGE TO BEDROOM WITH FULL RESTROOM AND (N) EXTERIOR STAIRS.
Permit Issued
Issued on 11/9/2020
Issuing Office
Current Status
CofO Issued on 12/26/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/15/2019 APPLICANT
Assigned to Plan Check Engineer 7/15/2019 ROSENDO MEDINA
Corrections Issued 7/16/2019 ROSENDO MEDINA
Building Plans Picked Up 7/18/2019 APPLICANT
Applicant returned to address corrections 7/29/2019 ROSENDO MEDINA
Applicant returned to address corrections 10/8/2019 ROSENDO MEDINA
Plan Check Approved 11/13/2019 ROSENDO MEDINA
Issued 11/9/2020 APPLICANT
CofO in Progress 12/8/2025 CHRISTOPHE COCHRAN
Permit Finaled 12/26/2025 RUBEN SALAS
CofO Issued 12/26/2025 RUBEN SALAS
Permit Finaled 12/26/2025 RUBEN SALAS

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 10/4/2019 ADRIAN CASTRO
Hydrant and Access approval Cleared 10/4/2019 GEORGE SUCHAND
Roof/Waste drainage to street Cleared 10/4/2019 ADRIAN CASTRO
Sewer availability Cleared 10/4/2019 ADRIAN CASTRO
Grading Pre-Inspection Cleared 11/13/2019 ROSENDO MEDINA

Contact Information

Contractor Owner-Builder       ,
Engineer Sayah,, Daniel Hoshyar; Lic. No.: C67905 15233 VENTURA BLVD STE 1130      SHERMAN OAKS, CA 91403

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/7/2021 Partial Inspection ARAM AVEDISIAN
Deputy Drilled-In Anchors 9/23/2021 Conditional Approval ARAM AVEDISIAN
Footing/Foundation/Slab 9/28/2021 Partial Approval ARAM AVEDISIAN
Footing/Foundation/Slab 10/8/2021 Approved WILLIAM WREN
BUILDING-Rough-Frame 11/18/2021 Partial Approval ARAM AVEDISIAN
PLUMBING-Rough 11/18/2021 Partial Approval ARAM AVEDISIAN
Floor/Roof Diaphrgm/Shear Wall 1/20/2022 Conditional Approval ARAM AVEDISIAN
BUILDING-Rough-Frame 9/2/2022 Partial Approval CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 12/22/2022 Approved CHRISTOPHE COCHRAN
ELECTRICAL-Rough 12/22/2022 Approved CHRISTOPHE COCHRAN
Green Building Rough 12/22/2022 Approved CHRISTOPHE COCHRAN
HVAC-Rough 12/22/2022 Approved CHRISTOPHE COCHRAN
PLUMBING-Rough 12/22/2022 Approved CHRISTOPHE COCHRAN
Insulation 4/19/2023 Approved CHRISTOPHE COCHRAN
Pre-Inspection 4/19/2023 Corrections Issued CHRISTOPHE COCHRAN
Interior/Exterior Lathing 7/3/2023 Approved CHRISTOPHE COCHRAN
Drywall Nailing 7/10/2023 Approved THOMAS FINNILA
Final 7/2/2025 Corrections Issued CHRISTOPHE COCHRAN
Green Building Final 7/2/2025 Not Ready for Inspection CHRISTOPHE COCHRAN
SGSOV-Seismic Gas S/O Valve 7/2/2025 SGSOV Approved CHRISTOPHE COCHRAN
Smoke Detectors 7/2/2025 Approved CHRISTOPHE COCHRAN
Final 8/28/2025 OK to Issue CofO CHRISTOPHE COCHRAN
Green Building Final 8/28/2025 Approved CHRISTOPHE COCHRAN