4574 N WINNETKA AVE 91364

Certificate Information: 4574 N WINNETKA AVE 91364

Application / Permit
19014-20000-03055
Plan Check / Job No.
B19VN09420
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
3'6" x 40' ADDITION TO EXTEND LIVING ROOM AND KITCHEN, 5'0" X 25'8" AND 4' X 34' 11" IRR. SHAPE ADDITION OF 2 STORY & REMODEL TO (E) SFD.
Permit Issued
Issued on 6/10/2020
Issuing Office
Current Status
CofO Issued on 12/8/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/6/2019 APPLICANT
Green Plans Picked Up 6/20/2019 APPLICANT
Assigned to Plan Check Engineer 6/27/2019 PINANK PATEL
Corrections Issued 7/1/2019 PINANK PATEL
Quality Review Completed 7/3/2019 OMID HEDAYAT
Building Plans Picked Up 7/3/2019 APPLICANT
Applicant returned to address corrections 8/29/2019 PINANK PATEL
Plan Check Approved 9/10/2019 PINANK PATEL
Plan Check Approved 5/8/2020 PINANK PATEL
Issued 6/10/2020 APPLICANT
CofO in Progress 12/7/2021 ROBERT GOLD
Permit Finaled 12/8/2021 MICHAEL SMITH
CofO Issued 12/8/2021 MICHAEL SMITH
Permit Finaled 12/8/2021 MICHAEL SMITH

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 8/23/2019 GUILLERMO PETRA
BHO/Hillside ordinance Cleared 8/23/2019 GUILLERMO PETRA
BHO/Hillside ordinance Cleared 8/23/2019 GUILLERMO PETRA
Eng Process Fee Ord 176,300 Cleared 8/23/2019 GUILLERMO PETRA
ZA Case Cleared 8/23/2019 STEVEN WECHSLER
Green Code Cleared 8/26/2019 DAVID MATSON
Grading Pre-Inspection Cleared 8/29/2019 PINANK PATEL
Low Impact Development Cleared 9/4/2019 MITESH PATEL
Roof/Waste drainage to street Cleared 9/5/2019 GABRIEL ROBLES

Contact Information

Architect Salcedo,, Glen Charles; Lic. No.: C33143 P O BOX 14202      VAN NUYS, CA 91409
Contractor Jm Alpha Construction Inc; Lic. No.: 1046537-B 1613 CHELSEA ROAD #354      SAN MARINO, CA 91108
Engineer Moeini,, Soheil; Lic. No.: C84000 1836 PARNELL AVE 202      LOS ANGELES, CA 90025

Inspector Information

JOHN HAYES, (818) 774-4302 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 6/12/2020 Partial Approval MICHAEL TEMPLE
PLUMBING-Rough 6/12/2020 Partial Approval MICHAEL TEMPLE
Deputy Drilled-In Anchors 6/30/2020 Partial Approval MICHAEL TEMPLE
Footing/Foundation/Slab 7/2/2020 Partial Approval MICHAEL TEMPLE
Deputy Wood Construction 8/27/2020 Approved DAVID SANDOVAL
Floor/Roof Diaphrgm/Shear Wall 9/2/2020 Approved DAVID SANDOVAL
BUILDING-Rough-Frame 10/2/2020 Not Ready for Inspection DAVID SCANTLIN
ELECTRICAL-Rough 10/2/2020 Not Ready for Inspection DAVID SCANTLIN
Green Building Rough 10/2/2020 Not Ready for Inspection DAVID SCANTLIN
PLUMBING-Rough 10/2/2020 Approved DAVID SCANTLIN
ELECTRICAL-Rough 10/8/2020 Approved HENRY KIM
BUILDING-Rough-Frame 10/14/2020 Not Ready for Inspection PAUL CHOPP
Green Building Rough 10/14/2020 Not Ready for Inspection PAUL CHOPP
HVAC-Rough 10/14/2020 Not Ready for Inspection PAUL CHOPP
BUILDING-Rough-Frame 10/30/2020 Approved RONALD COWAN
Green Building Rough 10/30/2020 Approved RONALD COWAN
HVAC-Rough 10/30/2020 Approved RONALD COWAN
Insulation 11/6/2020 Approved RONALD COWAN
Interior/Exterior Lathing 11/6/2020 Approved RONALD COWAN
Drywall Nailing 11/16/2020 Approved DONALD SUNSERI
Shower Pan 12/4/2020 Partial Approval DONALD SUNSERI
Interior/Exterior Lathing 12/8/2020 Approved DONALD SUNSERI
Shower Pan 12/8/2020 Approved DONALD SUNSERI
Gas Test 1/11/2021 Approved DONALD SUNSERI
Final 10/14/2021 Corrections Issued RONALD COWAN
Footing/Foundation/Slab 10/14/2021 Approved RONALD COWAN
Green Building Final 10/14/2021 Approved RONALD COWAN
SGSOV-Seismic Gas S/O Valve 10/14/2021 SGSOV Not Ready RONALD COWAN
Smoke Detectors 10/14/2021 Approved RONALD COWAN
Final 11/4/2021 Not Ready for Inspection PETER FOLLING
SGSOV-Seismic Gas S/O Valve 11/4/2021 SGSOV Approved PETER FOLLING
Final 12/3/2021 Conditional Approval ROBERT GOLD