21903 W YBARRA ROAD 91364

Certificate Information: 21903 W YBARRA ROAD 91364

Application / Permit
19014-20000-02323
Plan Check / Job No.
B19VN07265
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Remodel kitchen, doors and windows changeout at living room and bedroom , remove attached patio cover at rear and replaced with 15' x 22'2" addition for new family room per design
Permit Issued
Issued on 6/21/2019
Issuing Office
Valley
Current Status
CofO Issued on 1/31/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/3/2019 APPLICANT
Assigned to Plan Check Engineer 5/3/2019 ALDOUS CHIC
Corrections Issued 5/3/2019 ALDOUS CHIC
Plan Check Approved 6/21/2019 RARES BODEA
Plan Check Approved 6/21/2019 RARES BODEA
Issued 6/21/2019 LADBS
Permit Finaled 1/31/2026 MICHAEL PELHAM
CofO Issued 1/31/2026 MICHAEL PELHAM
Permit Finaled 1/31/2026 MICHAEL PELHAM

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 5/3/2019 SAFA JAVANMARDI
Roof/Waste drainage to street Cleared 5/3/2019 SAFA JAVANMARDI
Grading Pre-Inspection Cleared 6/21/2019 ALDOUS CHIC
Miscellaneous Cleared 6/21/2019 DOMINICK ORTIZ
Specific Plan Cleared 6/21/2019 DOMINICK ORTIZ
Specific Plan Cleared 6/21/2019 DOMINICK ORTIZ
ZI Cleared 6/21/2019 DOMINICK ORTIZ
ZI Cleared 6/21/2019 DOMINICK ORTIZ

Contact Information

Architect Stockton,, Richard Kenneth; Lic. No.: C35492 20140 ZIMMERMAN PLACE      SANTA CLARITA, CA 91390
Contractor Owner-Builder       ,
Engineer Freitas,, Richard Gomes; Lic. No.: C49072 240 COPA DE ORO DR      BREA, CA 92823
Engineer Lacher,, Todd Lee; Lic. No.: C67656 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

JOHN HAYES, (818) 774-4302 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 2/19/2020 Corrections Issued DAVID STEPANYAN
Footing/Foundation/Slab 2/27/2020 Approved PETER FOLLING
BUILDING-Rough-Frame 3/4/2020 Partial Approval PETER FOLLING
Floor/Roof Diaphrgm/Shear Wall 3/4/2020 Not Ready for Inspection PETER FOLLING
Green Building Rough 3/4/2020 Not Ready for Inspection PETER FOLLING
Floor/Roof Diaphrgm/Shear Wall 3/5/2020 Partial Approval PETER FOLLING
Floor/Roof Diaphrgm/Shear Wall 3/20/2020 Partial Approval MICHAEL TEMPLE
Deputy Drilled-In Anchors 4/2/2020 Conditional Approval MICHAEL TEMPLE
Insulation 4/8/2020 Partial Approval DAVID SANDOVAL
PLUMBING-Rough 4/8/2020 Not Ready for Inspection DAVID SANDOVAL
BUILDING-Rough-Frame 4/10/2020 Approved DAVID SANDOVAL
Deputy Wood Construction 4/10/2020 Approved DAVID SANDOVAL
ELECTRICAL-Rough 4/10/2020 Approved DAVID SANDOVAL
PLUMBING-Rough 4/10/2020 Approved DAVID SANDOVAL
BUILDING-Rough-Frame 4/16/2020 Approved RONALD COWAN
Green Building Rough 4/16/2020 Approved RONALD COWAN
Insulation 4/16/2020 Approved RONALD COWAN
Interior/Exterior Lathing 4/16/2020 Approved RONALD COWAN
Drywall Nailing 4/20/2020 Approved RONALD COWAN
Final 3/15/2021 Partial Approval DAVID SANDOVAL
Green Building Final 3/15/2021 Approved DAVID SANDOVAL
SGSOV-Seismic Gas S/O Valve 3/15/2021 SGSOV Approved DAVID SANDOVAL
Smoke Detectors 3/15/2021 Approved DAVID SANDOVAL