4538 W AMBROSE AVE 90027

Certificate Information: 4538 W AMBROSE AVE 90027

Application / Permit
19014-20000-02164
Plan Check / Job No.
B19VN06835
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) 18'-9.5" X 18'-3.5" DETACHED GARAGE AND (13'-3.5" X 19'-3.5") 2ND STORY ADDITION TO CREATE (N) ACCESSORY DWELLING UNIT PER AB 494 & SB 229. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 9/9/2019
Issuing Office
Valley
Current Status
CofO Issued on 2/23/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/26/2019 APPLICANT
Assigned to Plan Check Engineer 5/9/2019 RAPHAEL ROSAS
Corrections Issued 5/13/2019 RAPHAEL ROSAS
Quality Review Completed 5/13/2019 CHON CHIO KUO
Building Plans Picked Up 5/13/2019 APPLICANT
Green Plans Picked Up 5/13/2019 APPLICANT
Applicant returned to address corrections 8/19/2019 RAPHAEL ROSAS
Plan Check Approved 9/3/2019 RAPHAEL ROSAS
Issued 9/9/2019 LADBS
CofO in Progress 2/20/2021 JOSEPH MCGARRY
Permit Finaled 2/23/2021 DEROLD HAUFF
CofO Issued 2/23/2021 DEROLD HAUFF
Permit Finaled 2/23/2021 DEROLD HAUFF

Permit Application Clearance Information

Construction near power lines Cleared 7/31/2019 RIDWAN HARDY
Address approval Cleared 8/2/2019 GABRIEL ROBLES
Eng Process Fee Ord 176,300 Cleared 8/2/2019 GABRIEL ROBLES
Roof/Waste drainage to street Cleared 8/2/2019 GABRIEL ROBLES
Sewer availability Cleared 8/2/2019 GABRIEL ROBLES
Green Code Cleared 8/8/2019 DAVID MATSON
Grading Pre-Inspection Cleared 8/19/2019 RAPHAEL ROSAS
ZI Cleared 8/27/2019 LINDA LOU
GPI Written Notices Cleared 9/3/2019 RAPHAEL ROSAS

Contact Information

Contractor A A A Remodeling & Restoration Inc; Lic. No.: 859135-B 7105 GERALD AVENUE      VAN NUYS, CA 91406
Engineer Rhee,, Kyle; Lic. No.: C78215 2753 WAVERLY DR 403      LOS ANGELES, CA 90039

Inspector Information

ENRIQUE MIRELES, (213) 202-3438 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 10/7/2019 Approved BRAD BESCOS
Excavation/Setback/Form/Re-Bar 10/9/2019 Corrections Issued BRAD BESCOS
PLUMBING-Rough 10/9/2019 Corrections Issued BRAD BESCOS
Footing/Foundation/Slab 1/23/2020 Not Ready for Inspection BRAD BESCOS
PLUMBING-Rough 1/23/2020 Not Ready for Inspection BRAD BESCOS
Footing/Foundation/Slab 1/30/2020 Corrections Issued JOSEPH MCGARRY
Underground Mechanical 1/30/2020 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 2/12/2020 Approved JOSEPH MCGARRY
Green Building Rough 2/12/2020 Corrections Issued JOSEPH MCGARRY
Wood Frame 4/23/2020 Partial Inspection JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 5/8/2020 Corrections Issued JOSEPH MCGARRY
Rough-Elec/Plmb/HVAC 5/8/2020 Partial Inspection JOSEPH MCGARRY
Shower Pan 5/8/2020 Not Ready for Inspection JOSEPH MCGARRY
Deputy Wood Construction 5/13/2020 Partial Approval JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 5/14/2020 Approved JOSEPH MCGARRY
Footing/Foundation/Slab 5/14/2020 Approved JOSEPH MCGARRY
PLUMBING-Rough 5/14/2020 Approved JOSEPH MCGARRY
ELECTRICAL-Rough 5/19/2020 Not Ready for Inspection JOSEPH MCGARRY
Insulation 5/19/2020 Not Ready for Inspection JOSEPH MCGARRY
BUILDING-Rough-Frame 6/10/2020 Conditional Approval CHRIS CHRISTENSEN
ELECTRICAL-Rough 6/10/2020 Conditional Approval CHRIS CHRISTENSEN
Floor/Roof Diaphrgm/Shear Wall 6/10/2020 Partial Approval CHRIS CHRISTENSEN
Green Building Rough 6/10/2020 Conditional Approval CHRIS CHRISTENSEN
HVAC-Rough 6/10/2020 Not Ready for Inspection CHRIS CHRISTENSEN
Interior/Exterior Lathing 6/10/2020 Approved CHRIS CHRISTENSEN
PLUMBING-Rough 6/10/2020 Approved CHRIS CHRISTENSEN
Underground Mechanical 6/10/2020 Approved CHRIS CHRISTENSEN
BUILDING-Rough-Frame 6/15/2020 Conditional Approval JOSEPH MCGARRY
Green Building Rough 6/15/2020 Approved JOSEPH MCGARRY
HVAC-Rough 6/15/2020 Approved JOSEPH MCGARRY
Insulation 6/15/2020 Conditional Approval JOSEPH MCGARRY
Drywall Nailing 6/24/2020 Approved CHRISTOPHER DELLEFIELD
Gas Test 6/24/2020 Approved CHRISTOPHER DELLEFIELD
Interior/Exterior Lathing 6/24/2020 Partial Approval CHRISTOPHER DELLEFIELD
BUILDING-Rough-Frame 9/21/2020 Approved JOSEPH MCGARRY
Final 9/21/2020 Corrections Issued JOSEPH MCGARRY
Green Building Final 9/21/2020 Approved JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 9/21/2020 SGSOV Approved JOSEPH MCGARRY
Smoke Detectors 9/21/2020 Approved JOSEPH MCGARRY
Final 11/4/2020 Not Ready for Inspection JOSEPH MCGARRY
Final 2/5/2021 OK to Issue CofO JOSEPH MCGARRY