7632 S GODDARD AVE 90045

Certificate Information: 7632 S GODDARD AVE 90045

Application / Permit
19014-20000-01625
Plan Check / Job No.
B19VN05075
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REPAIR & REFRAME 14' 2" X 16' IRREGULAR-SHAPE, ADD 27' 6" X 19' 2", ADD 13' 3" X 17' 10" COVERED PORCH AND ENCLOSE 4' 2" X 5' PATIO COVER TO MAKE HABITABLE SPACE FOR (E) SINGLE FAMILY DWELLING WITH ATTACHED 1-CAR GARAGE. ALL WORK DONE PER STRUCTURAL ENGINEERING.
Permit Issued
Issued on 10/30/2019
Issuing Office
Metro
Current Status
CofO Issued on 3/29/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/1/2019 APPLICANT
Assigned to Plan Check Engineer 4/1/2019 GURUNATH NESARAJAH
Corrections Issued 4/1/2019 GURUNATH NESARAJAH
Building Plans Picked Up 4/4/2019 APPLICANT
Plan Check Approved 5/1/2019 GURUNATH NESARAJAH
Issued 10/30/2019 LADBS
CofO in Progress 3/25/2022 BOBBY KEY
CofO Issued 3/29/2022 DANIEL ORRANTE
Permit Finaled 3/29/2022 DANIEL ORRANTE

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 4/30/2019 APEKSHYA BAJRACHARYA
Sewer availability Cleared 4/30/2019 APEKSHYA BAJRACHARYA
GPI Written Notices Cleared 5/1/2019 GURUNATH NESARAJAH
Grading Pre-Inspection Cleared 5/1/2019 GURUNATH NESARAJAH
Low Impact Development Cleared 5/1/2019 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 5/1/2019 JOSHUA DIAZ

Contact Information

Architect , ; Lic. No.: C33595       ,
Contractor Mybuildex Inc; Lic. No.: 978487-B 131 WEST TORRANCE BLVD      REDONDO BEACH, CA 90277

Inspector Information

MICHAEL LEWIS, (310) 914-3979 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 11/21/2019 No Access for Inspection JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 11/25/2019 Conditional Approval JUAN VALENZUELA
BUILDING-Rough-Frame 12/6/2019 Partial Approval JUAN VALENZUELA
METHANE-Barrier 12/6/2019 Not Ready for Inspection JUAN VALENZUELA
METHANE-Subgrade 12/6/2019 Not Ready for Inspection JUAN VALENZUELA
Floor/Roof Diaphrgm/Shear Wall 12/20/2019 Partial Approval JUAN VALENZUELA
Deputy Wood Construction 1/7/2020 Conditional Approval DAVID FEILER
BUILDING-Rough-Frame 1/9/2020 No Access for Inspection DAVID FEILER
ELECTRICAL-Rough 1/9/2020 No Access for Inspection DAVID FEILER
Green Building Rough 1/9/2020 No Access for Inspection DAVID FEILER
MERV13>=Rough 1/9/2020 No Access for Inspection DAVID FEILER
METHANE-Rough 1/9/2020 No Access for Inspection DAVID FEILER
PLUMBING-Rough 1/9/2020 No Access for Inspection DAVID FEILER
ELECTRICAL-Rough 1/10/2020 Not Ready for Inspection JUAN VALENZUELA
PLUMBING-Rough 1/10/2020 Not Ready for Inspection JUAN VALENZUELA
BUILDING-Rough-Frame 1/16/2020 Approved JUAN VALENZUELA
ELECTRICAL-Rough 1/16/2020 Approved JUAN VALENZUELA
Green Building Rough 1/16/2020 Not Ready for Inspection JUAN VALENZUELA
MERV13>=Rough 1/16/2020 Approved JUAN VALENZUELA
METHANE-Rough 1/16/2020 Approved JUAN VALENZUELA
PLUMBING-Rough 1/16/2020 Approved JUAN VALENZUELA
BUILDING-Rough-Frame 1/21/2020 Approved JUAN VALENZUELA
Green Building Rough 1/21/2020 Approved JUAN VALENZUELA
Insulation 1/21/2020 Approved JUAN VALENZUELA
Interior/Exterior Lathing 1/21/2020 Partial Approval JUAN VALENZUELA
Drywall Nailing 1/30/2020 Approved JUAN VALENZUELA
Interior/Exterior Lathing 1/30/2020 Approved JUAN VALENZUELA
Shower Pan 1/30/2020 Approved JUAN VALENZUELA
ELECTRICAL-Final 3/23/2020 Corrections Issued JUAN VALENZUELA
PLUMBING-Final 3/23/2020 Approved JUAN VALENZUELA
ELECTRICAL-Final 4/1/2020 No Access for Inspection DAVID FEILER
Final 4/1/2020 No Access for Inspection DAVID FEILER
Footing/Foundation/Slab 4/1/2020 No Access for Inspection DAVID FEILER
Green Building Final 4/1/2020 No Access for Inspection DAVID FEILER
MERV13>=Final 4/1/2020 No Access for Inspection DAVID FEILER
METHANE-Barrier 4/1/2020 No Access for Inspection DAVID FEILER
METHANE-Subgrade 4/1/2020 No Access for Inspection DAVID FEILER
SGSOV-Seismic Gas S/O Valve 4/1/2020 SGSOV Not Ready DAVID FEILER
Smoke Detectors 4/1/2020 No Access for Inspection DAVID FEILER
ELECTRICAL-Final 4/3/2020 Not Ready for Inspection CRAIG DAVIS
ELECTRICAL-Final 4/7/2020 Approved JUAN VALENZUELA
Final 4/7/2020 Corrections Issued JUAN VALENZUELA
Footing/Foundation/Slab 4/7/2020 Approved JUAN VALENZUELA
Green Building Final 4/7/2020 Approved JUAN VALENZUELA
MERV13>=Final 4/7/2020 Corrections Issued JUAN VALENZUELA
METHANE-Barrier 4/7/2020 Approved JUAN VALENZUELA
METHANE-Subgrade 4/7/2020 Approved JUAN VALENZUELA
SGSOV-Seismic Gas S/O Valve 4/7/2020 SGSOV Approved JUAN VALENZUELA
Service/Power Release 4/7/2020 Approved JUAN VALENZUELA
Smoke Detectors 4/7/2020 Approved JUAN VALENZUELA
Final 5/15/2020 No Access for Inspection CRAIG DAVIS
MERV13>=Final 5/15/2020 No Access for Inspection CRAIG DAVIS
Final 5/19/2020 Conditional Approval DAVID HEINE
MERV13>=Final 5/19/2020 Approved DAVID HEINE
PLUMBING-Final 5/19/2020 Approved DAVID HEINE
Sewer 4/26/2021 Not Ready for Inspection BRENDAN LOONEY
Final 3/25/2022 OK to Issue CofO BOBBY KEY
Service/Power Release 3/25/2022 Approved BOBBY KEY