2726 S DUNLEER PL 90064

Certificate Information: 2726 S DUNLEER PL 90064

Application / Permit
19014-20000-00690
Plan Check / Job No.
B19VN02172
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
2-STORY ADDITION (IRR ADDT'N'S @ 1ST FLR & 46' X 49'-1" @ 2ND FLR) TO (E) 2-STORY SFD W/ ATTACHED ACCESSORY DWELLING UNIT; INTERIOR REMODEL TO CONVERT 1ST FLOOR ADU INTO (N) GARAGE & CONVERT (E) ADU AT 2ND FLR TO BEDROOM/BATHROOM; ADD (4) BEDROOMS & (4) BATHROOMS FOR SFD ON 2ND FLOOR (NFPA-13D FIRE SPRINKLERS THROUGHOUT) TO REMOVE ENTIRE ADU CREATING SFD W/ ATTACHED GARAGE
Permit Issued
Issued on 10/12/2022
Issuing Office
Valley
Current Status
CofO Issued on 7/29/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/11/2019 APPLICANT
Assigned to Plan Check Engineer 3/7/2019 NILOOFAR MEHRAIN
Green Plans Picked Up 3/15/2019 APPLICANT
Corrections Issued 3/21/2019 NILOOFAR MEHRAIN
Quality Review Completed 3/22/2019 CHON CHIO KUO
Building Plans Picked Up 3/26/2019 APPLICANT
Applicant returned to address corrections 4/22/2019 NILOOFAR MEHRAIN
Applicant returned to address corrections 9/9/2019 NILOOFAR MEHRAIN
Applicant returned to address corrections 2/14/2022 NILOOFAR MEHRAIN
Applicant returned to address corrections 6/21/2022 NILOOFAR MEHRAIN
Applicant returned to address corrections 9/9/2022 NILOOFAR MEHRAIN
Plan Check Approved 10/12/2022 NILOOFAR MEHRAIN
Issued 10/12/2022 APPLICANT
CofO in Progress 7/25/2024 ASHLEY THOMPSON
Permit Finaled 7/29/2024 DANIEL ORRANTE
CofO Issued 7/29/2024 DANIEL ORRANTE
Permit Finaled 7/29/2024 DANIEL ORRANTE

Permit Application Clearance Information

Green Code Cleared 7/18/2019 PARISA ZAHABI
GPI Written Notices Cleared 9/9/2019 NILOOFAR MEHRAIN
Grading Pre-Inspection Cleared 9/9/2019 NILOOFAR MEHRAIN
Flood clearance Cleared 1/31/2022 TIFFANY WONG
Flood clearance Cleared 1/31/2022 TIFFANY WONG
CPC Cleared 5/13/2022 LOUIS ORTEGA
Metro Rail approval Cleared 5/26/2022 NILOOFAR MEHRAIN
Construction near power lines Cleared 6/24/2022 RIDWAN HARDY
Construction within easement Cleared 6/24/2022 RIDWAN HARDY
Hydrant and Access approval Cleared 6/25/2022 JOHN CONNEALLY
Address approval Cleared 6/30/2022 ANTHONY MAINEZ
Eng Process Fee Ord 176,300 Cleared 7/5/2022 ANTHONY MAINEZ
Sewer availability Cleared 7/5/2022 ANTHONY MAINEZ
Low Impact Development Cleared 8/8/2022 ANTHONY VARGAS
Roof/Waste drainage to street Cleared 8/10/2022 ANTHONY MAINEZ

Contact Information

Contractor Highline General Construction Inc; Lic. No.: 1028345-B 4812 BURNABY DR      COVINA, CA 91724
Engineer Erdelyi,, Peter Tibor; Lic. No.: C26962 1950 SAWTELLE BLVD STE 175      LOS ANGELES, CA 90025

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 11/29/2022 Partial Approval OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 12/5/2022 Partial Inspection OGANES TARAKHCHYAN
Deputy Drilled-In Anchors 1/24/2023 Approved JOHNNY MIRANDA
Footing/Foundation/Slab 1/24/2023 Approved JOHNNY MIRANDA
Deputy Reinf. Concrete 1/27/2023 No Access for Inspection DAVID FEILER
Deputy Steel/Welding 2/6/2023 Conditional Approval MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 2/14/2023 Partial Approval CLAYTON GRAHAM
Structural Steel Frame 2/14/2023 Corrections Issued CLAYTON GRAHAM
Deputy Wood Construction 2/15/2023 Conditional Approval DAVID FEILER
Deputy Wood Construction 5/9/2023 Conditional Approval MICHAEL PELHAM
Deputy Wood Construction 5/17/2023 Conditional Approval MICHAEL PELHAM
BUILDING-Rough-Frame 5/18/2023 Not Ready for Inspection CLAYTON GRAHAM
ELECTRICAL-Rough 5/18/2023 Not Ready for Inspection CLAYTON GRAHAM
FLOOD-Proofing Certificate 5/18/2023 Not Ready for Inspection CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 5/18/2023 Partial Approval CLAYTON GRAHAM
Green Building Rough 5/18/2023 Not Ready for Inspection CLAYTON GRAHAM
PLUMBING-Rough 5/18/2023 Partial Approval CLAYTON GRAHAM
Sewer 5/18/2023 Partial Approval CLAYTON GRAHAM
Deputy Wood Construction 5/19/2023 Conditional Approval CLAYTON GRAHAM
Excavation/Setback/Form/Re-Bar 5/22/2023 Partial Approval CLAYTON GRAHAM
PLUMBING-Rough 5/22/2023 Corrections Issued CLAYTON GRAHAM
BUILDING-Rough-Frame 5/25/2023 Not Ready for Inspection CLAYTON GRAHAM
ELECTRICAL-Rough 5/25/2023 Not Ready for Inspection CLAYTON GRAHAM
FLOOD-Proofing Certificate 5/25/2023 Approved CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 5/25/2023 Corrections Issued CLAYTON GRAHAM
Green Building Rough 5/25/2023 Not Ready for Inspection CLAYTON GRAHAM
ELECTRICAL-Rough 5/31/2023 Corrections Issued CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 5/31/2023 Not Ready for Inspection CLAYTON GRAHAM
HVAC-Rough 5/31/2023 Corrections Issued CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 6/1/2023 Partial Approval CLAYTON GRAHAM
PLUMBING-Rough 6/1/2023 Approved CLAYTON GRAHAM
ELECTRICAL-Rough 6/6/2023 Corrections Issued EVAN COOPER
Interior/Exterior Lathing 6/7/2023 Partial Approval JESUS PINEDA
ELECTRICAL-Rough 6/9/2023 Approved JESUS PINEDA
BUILDING-Rough-Frame 6/13/2023 Corrections Issued CLAYTON GRAHAM
Green Building Rough 6/13/2023 Corrections Issued CLAYTON GRAHAM
BUILDING-Rough-Frame 6/15/2023 Approved HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 6/15/2023 Approved HERBERT GIRON
Green Building Rough 6/15/2023 Approved HERBERT GIRON
HVAC-Rough 6/15/2023 Approved HERBERT GIRON
Verify Sprinkler Sign Off 6/15/2023 Approved HERBERT GIRON
Insulation 6/21/2023 Approved CHRISTOPHER WILSON
Drywall Nailing 6/28/2023 Approved CLAYTON GRAHAM
Shower Pan 8/9/2023 Approved CLAYTON GRAHAM
Interior/Exterior Lathing 8/16/2023 Partial Approval MEL KHACHATOURIAN
ELECTRICAL-Final 10/26/2023 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Final 10/31/2023 Corrections Issued BEN MOLSTAD
ELECTRICAL-Final 11/2/2023 Approved BEN MOLSTAD
Service/Power Release 12/4/2023 Approved BEN MOLSTAD
Final 3/18/2024 Corrections Issued OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 3/18/2024 SGSOV Not Ready OGANES TARAKHCHYAN
HVAC-Final 4/10/2024 Corrections Issued OGANES TARAKHCHYAN
PLUMBING-Final 4/10/2024 Corrections Issued OGANES TARAKHCHYAN
Final 5/14/2024 Corrections Issued ASHLEY THOMPSON
Green Building Final 5/14/2024 Corrections Issued ASHLEY THOMPSON
SGSOV-Seismic Gas S/O Valve 5/14/2024 SGSOV Approved ASHLEY THOMPSON
Smoke Detectors 5/14/2024 Approved ASHLEY THOMPSON
Final 6/10/2024 Not Ready for Inspection ASHLEY THOMPSON
Green Building Final 6/10/2024 Approved ASHLEY THOMPSON
Final 7/25/2024 OK to Issue CofO ASHLEY THOMPSON