11355-11377 W OLYMPIC BLVD 90064

Certificate Information: 11355-11377 W OLYMPIC BLVD 90064

Application / Permit
19014-10002-05107
Plan Check / Job No.
B20LA01925
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
SUPPLEMENTAL TO PERMIT 19014-10000-05107. NORTH TOWER CRANE FOUNDATIONS
Permit Issued
Issued on 5/12/2020
Issuing Office
Current Status
Permit Finaled on 10/30/2023

Permit Application Status History

Submitted 1/31/2020 APPLICANT
Assigned to Plan Check Engineer 2/20/2020 LARRY LEE
Corrections Issued 2/25/2020 LARRY LEE
Quality Review Completed 2/26/2020 CHARLES CHANG
Building Plans Picked Up 2/27/2020 APPLICANT
Plan Check Approved 5/7/2020 LARRY LEE
Issued 5/12/2020 APPLICANT
Permit Finaled 10/27/2023 DERRICK SPENCER

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Hathaway Dinwiddie Construction Company; Lic. No.: 729664-A 275 BATTERY STREET SUITE 300      SAN FRANCISCO, CA 941113330
Engineer Orozco,, Gregory Louis; Lic. No.: S4957 13506 BLUEGROVE AVE      BELLFLOWER, CA 90706
Landscape Architect Lenahan,, Brad C; Lic. No.: LA4470 1136 MADISON AVE      SAN DIEGO, CA 92116

Inspector Information

PAUL DAVIDSON, (310) 914-3914 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 6/2/2020 Approved TED RIES
Footing/Foundation/Slab 6/3/2020 Partial Approval TED RIES
Piling/Pier/Caisson 6/3/2020 Partial Approval TED RIES
Deputy Reinf. Concrete 6/5/2020 Conditional Approval TED RIES
Piling/Pier/Caisson 6/5/2020 Partial Approval TED RIES
Deputy Drilled-In Anchors 6/8/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 6/8/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 6/9/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 6/9/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 6/10/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 6/10/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 6/11/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 6/11/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 6/12/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 6/12/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 6/16/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 6/17/2020 Conditional Approval TED RIES
Reinforced Concrete Frame 6/17/2020 Partial Inspection TED RIES
Deputy Reinf. Concrete 6/18/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 6/19/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 6/23/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 6/23/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 6/24/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 6/24/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 6/25/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 6/25/2020 Conditional Approval TED RIES
Footing/Foundation/Slab 6/25/2020 Partial Approval TED RIES
Deputy Drilled-In Anchors 6/26/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/26/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/2/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/6/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/7/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/8/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/9/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/10/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/13/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/14/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/15/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/16/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/17/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/20/2020 Conditional Approval TED RIES
Piling/Pier/Caisson 7/20/2020 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 7/21/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/22/2020 Conditional Approval TED RIES
Piling/Pier/Caisson 7/22/2020 Partial Approval TED RIES
Deputy Other (see comments) 7/23/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/23/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/24/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/27/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/28/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/29/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/30/2020 Conditional Approval TED RIES
Reinforced Concrete Frame 7/30/2020 Partial Approval TED RIES
Deputy Reinf. Concrete 7/31/2020 Conditional Approval TED RIES
Reinforced Concrete Frame 7/31/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/3/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/4/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/5/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/6/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/7/2020 Approved TED RIES
Deputy Reinf. Concrete 8/10/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/11/2020 Approved TED RIES
Deputy Steel/Welding 8/11/2020 Approved TED RIES
Deputy Reinf. Concrete 8/12/2020 Conditional Approval TED RIES
Deputy Steel/Welding 8/12/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/13/2020 Conditional Approval TED RIES
Deputy Steel/Welding 8/13/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/14/2020 Conditional Approval TED RIES
Deputy Steel/Welding 8/14/2020 Conditional Approval TED RIES
Deputy Steel/Welding 8/17/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/18/2020 Conditional Approval TED RIES
Deputy Steel/Welding 8/18/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 8/19/2020 Conditional Approval TED RIES
Deputy Steel/Welding 8/19/2020 Conditional Approval TED RIES
Deputy Steel/Welding 8/20/2020 Conditional Approval TED RIES
Deputy Steel/Welding 8/21/2020 Conditional Approval TED RIES
Deputy Steel/Welding 8/25/2020 Conditional Approval TED RIES
Deputy Steel/Welding 8/26/2020 Conditional Approval TED RIES
Deputy Steel/Welding 8/27/2020 Conditional Approval TED RIES
Deputy Steel/Welding 8/28/2020 Conditional Approval TED RIES
Deputy Steel/Welding 8/31/2020 Approved TED RIES
Deputy Steel/Welding 9/1/2020 Approved TED RIES
Deputy Steel/Welding 9/2/2020 Approved TED RIES
Deputy Steel/Welding 9/3/2020 Approved TED RIES
Deputy Steel/Welding 9/4/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 9/8/2020 Conditional Approval TED RIES
Deputy Steel/Welding 9/8/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 9/9/2020 Conditional Approval TED RIES
Deputy Steel/Welding 9/9/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 9/10/2020 Conditional Approval TED RIES
Deputy Steel/Welding 9/10/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 9/11/2020 Conditional Approval TED RIES
Deputy Steel/Welding 9/11/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 9/14/2020 Approved TED RIES
Deputy Steel/Welding 9/14/2020 Approved TED RIES
Deputy Drilled-In Anchors 9/15/2020 Approved TED RIES
Deputy Steel/Welding 9/15/2020 Approved TED RIES
Deputy Drilled-In Anchors 9/16/2020 Conditional Approval TED RIES
Deputy Steel/Welding 9/16/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 9/17/2020 Conditional Approval TED RIES
Deputy Steel/Welding 9/17/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 9/18/2020 Conditional Approval TED RIES
Deputy Shotcrete 9/18/2020 Conditional Approval TED RIES
Deputy Steel/Welding 9/18/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 9/21/2020 Conditional Approval TED RIES
Deputy Steel/Welding 9/21/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 9/22/2020 Conditional Approval TED RIES
Deputy Steel/Welding 9/22/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 9/23/2020 Conditional Approval TED RIES
Deputy Steel/Welding 9/23/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 9/24/2020 Conditional Approval TED RIES
Deputy Steel/Welding 9/24/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 9/25/2020 Conditional Approval TED RIES
Deputy Steel/Welding 9/25/2020 Conditional Approval TED RIES
Deputy Steel/Welding 9/29/2020 Conditional Approval TED RIES
Deputy Steel/Welding 9/30/2020 Conditional Approval TED RIES
Deputy Steel/Welding 10/1/2020 Conditional Approval TED RIES
Deputy Steel/Welding 10/2/2020 Approved TED RIES
Deputy Steel/Welding 10/5/2020 Approved TED RIES
Deputy Steel/Welding 10/6/2020 Conditional Approval TED RIES
Deputy Steel/Welding 10/7/2020 Conditional Approval TED RIES
Deputy Steel/Welding 10/8/2020 Approved TED RIES
Deputy Steel/Welding 10/9/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 10/13/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 10/14/2020 Conditional Approval TED RIES
Deputy Steel/Welding 10/14/2020 Conditional Approval TED RIES
Deputy Steel/Welding 10/15/2020 Conditional Approval TED RIES
Deputy Steel/Welding 10/16/2020 Conditional Approval TED RIES
Deputy Steel/Welding 10/19/2020 Conditional Approval TED RIES
Deputy Steel/Welding 10/20/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 10/21/2020 Approved TED RIES
Deputy Steel/Welding 10/21/2020 Approved TED RIES
Deputy Steel/Welding 10/22/2020 Approved TED RIES
Deputy Steel/Welding 10/23/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 10/26/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 10/26/2020 Conditional Approval TED RIES
Deputy Steel/Welding 10/26/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 10/27/2020 Approved TED RIES
Deputy Reinf. Concrete 10/27/2020 Approved TED RIES
Deputy Steel/Welding 10/27/2020 Approved TED RIES
Deputy Drilled-In Anchors 10/28/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 10/28/2020 Conditional Approval TED RIES
Deputy Steel/Welding 10/28/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 10/29/2020 Approved TED RIES
Deputy Reinf. Concrete 10/29/2020 Approved TED RIES
Deputy Steel/Welding 10/29/2020 Approved TED RIES
Deputy Drilled-In Anchors 10/30/2020 Approved TED RIES
Deputy Reinf. Concrete 10/30/2020 Approved TED RIES
Deputy Steel/Welding 10/30/2020 Approved TED RIES
Deputy Drilled-In Anchors 11/2/2020 Approved TED RIES
Deputy Reinf. Concrete 11/2/2020 Approved TED RIES
Deputy Steel/Welding 11/2/2020 Approved TED RIES
Deputy Drilled-In Anchors 11/4/2020 Approved TED RIES
Deputy Reinf. Concrete 11/4/2020 Approved TED RIES
Deputy Steel/Welding 11/4/2020 Approved TED RIES
Deputy Drilled-In Anchors 11/5/2020 Approved TED RIES
Deputy Reinf. Concrete 11/5/2020 Approved TED RIES
Deputy Steel/Welding 11/5/2020 Approved TED RIES
Deputy Drilled-In Anchors 11/6/2020 Approved TED RIES
Deputy Reinf. Concrete 11/6/2020 Approved TED RIES
Deputy Steel/Welding 11/6/2020 Approved TED RIES
Deputy Drilled-In Anchors 11/9/2020 Approved TED RIES
Deputy Reinf. Concrete 11/9/2020 Approved TED RIES
Deputy Steel/Welding 11/9/2020 Approved TED RIES
Deputy Drilled-In Anchors 11/10/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/10/2020 Conditional Approval TED RIES
Deputy Steel/Welding 11/10/2020 Conditional Approval TED RIES
Reinforced Concrete Frame 11/10/2020 Partial Approval TED RIES
Deputy Drilled-In Anchors 11/12/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 11/12/2020 Approved JEFF BYTHEWAY
Deputy Steel/Welding 11/12/2020 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 11/13/2020 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 11/13/2020 Approved SORIN CIRSTOIU
Deputy Steel/Welding 11/13/2020 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 11/16/2020 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 11/16/2020 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 11/16/2020 Conditional Approval PAUL DAVIDSON
Deputy Drilled-In Anchors 11/17/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/17/2020 Conditional Approval TED RIES
Deputy Steel/Welding 11/17/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 11/18/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/18/2020 Conditional Approval TED RIES
Deputy Steel/Welding 11/18/2020 Conditional Approval TED RIES
Special/Order Compliance 11/18/2020 Approved TED RIES
Deputy Drilled-In Anchors 11/19/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/19/2020 Conditional Approval TED RIES
Deputy Steel/Welding 11/19/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 11/20/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/20/2020 Conditional Approval TED RIES
Deputy Steel/Welding 11/20/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 11/23/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 11/23/2020 Conditional Approval TED RIES
Deputy Steel/Welding 11/23/2020 Conditional Approval TED RIES
Deputy Steel/Welding 11/24/2020 Conditional Approval TED RIES
Deputy Steel/Welding 11/25/2020 Approved JEFF BYTHEWAY
Deputy Steel/Welding 11/30/2020 Approved JEFF BYTHEWAY
Deputy Steel/Welding 12/1/2020 Approved TED RIES
Deputy Steel/Welding 12/2/2020 Approved TED RIES
Deputy Steel/Welding 12/3/2020 Conditional Approval TED RIES
Deputy Steel/Welding 12/4/2020 Conditional Approval TED RIES
Deputy Steel/Welding 12/7/2020 Conditional Approval TED RIES
Deputy Steel/Welding 12/8/2020 Conditional Approval TED RIES
Deputy Steel/Welding 12/9/2020 Conditional Approval TED RIES
Deputy Steel/Welding 12/10/2020 Conditional Approval TED RIES
Deputy Steel/Welding 12/11/2020 Approved TED RIES
Deputy Steel/Welding 12/14/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 12/15/2020 Conditional Approval TED RIES
Deputy Steel/Welding 12/16/2020 Conditional Approval TED RIES
Deputy Steel/Welding 12/17/2020 Approved DERRICK SPENCER
Deputy Steel/Welding 12/18/2020 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 12/22/2020 Approved JEFF BYTHEWAY
Deputy Steel/Welding 12/23/2020 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 12/24/2020 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/28/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 12/28/2020 Approved JEFF BYTHEWAY
Deputy Steel/Welding 12/28/2020 Conditional Approval PAUL DAVIDSON
Deputy Drilled-In Anchors 12/29/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 12/29/2020 Conditional Approval TED RIES
Deputy Steel/Welding 12/29/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 12/30/2020 Conditional Approval TED RIES
Deputy Reinf. Concrete 12/30/2020 Conditional Approval TED RIES
Deputy Steel/Welding 12/30/2020 Conditional Approval TED RIES
Deputy Drilled-In Anchors 12/31/2020 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 12/31/2020 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 12/31/2020 Conditional Approval PAUL DAVIDSON
Deputy Drilled-In Anchors 1/4/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/4/2021 Conditional Approval TED RIES
Deputy Steel/Welding 1/4/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 1/5/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/5/2021 Conditional Approval TED RIES
Deputy Steel/Welding 1/5/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 1/6/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/6/2021 Conditional Approval TED RIES
Deputy Steel/Welding 1/6/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 1/7/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/7/2021 Conditional Approval TED RIES
Deputy Steel/Welding 1/7/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 1/8/2021 Approved TED RIES
Deputy Reinf. Concrete 1/8/2021 Approved TED RIES
Deputy Steel/Welding 1/8/2021 Approved TED RIES
Deputy Steel/Welding 1/11/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 1/12/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/12/2021 Conditional Approval TED RIES
Deputy Steel/Welding 1/12/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 1/13/2021 Approved TED RIES
Deputy Reinf. Concrete 1/13/2021 Approved TED RIES
Deputy Steel/Welding 1/13/2021 Approved TED RIES
Deputy Drilled-In Anchors 1/14/2021 Approved TED RIES
Deputy Reinf. Concrete 1/14/2021 Approved TED RIES
Deputy Steel/Welding 1/14/2021 Approved TED RIES
Deputy Drilled-In Anchors 1/15/2021 Conditional Approval JOHN DODGE
Deputy Reinf. Concrete 1/15/2021 Conditional Approval JOHN DODGE
Deputy Steel/Welding 1/15/2021 Conditional Approval JOHN DODGE
Deputy Drilled-In Anchors 1/19/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/19/2021 Conditional Approval TED RIES
Deputy Steel/Welding 1/19/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 1/20/2021 Approved DERRICK SPENCER
Deputy Reinf. Concrete 1/20/2021 Approved DERRICK SPENCER
Deputy Steel/Welding 1/20/2021 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 1/21/2021 Conditional Approval JOHN DODGE
Deputy Reinf. Concrete 1/21/2021 Conditional Approval JOHN DODGE
Deputy Steel/Welding 1/21/2021 Conditional Approval JOHN DODGE
Deputy Drilled-In Anchors 1/22/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/22/2021 Conditional Approval TED RIES
Deputy Steel/Welding 1/22/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 1/25/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/25/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 1/26/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/26/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 1/27/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/27/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 1/28/2021 Approved TED RIES
Deputy Reinf. Concrete 1/28/2021 Approved TED RIES
Deputy Drilled-In Anchors 1/29/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 1/29/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/1/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/1/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/2/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/2/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/2/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/3/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/3/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/3/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/4/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/4/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/4/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/5/2021 Conditional Approval TED RIES
Deputy Fireproofing 2/5/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/5/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/5/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/8/2021 Approved TED RIES
Deputy Fireproofing 2/8/2021 Approved TED RIES
Deputy Steel/Welding 2/8/2021 Approved TED RIES
Deputy Drilled-In Anchors 2/9/2021 Conditional Approval TED RIES
Deputy Fireproofing 2/9/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/9/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/10/2021 Approved TED RIES
Deputy Fireproofing 2/10/2021 Approved TED RIES
Deputy Steel/Welding 2/10/2021 Approved TED RIES
Deputy Drilled-In Anchors 2/11/2021 Conditional Approval TED RIES
Deputy Fireproofing 2/11/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/11/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/12/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/12/2021 Conditional Approval TED RIES
Deputy Fireproofing 2/17/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/18/2021 Conditional Approval TED RIES
Deputy Fireproofing 2/18/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/18/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/19/2021 Conditional Approval JOHN DODGE
Deputy Fireproofing 2/19/2021 Conditional Approval JOHN DODGE
Deputy Steel/Welding 2/19/2021 Conditional Approval JOHN DODGE
Deputy Drilled-In Anchors 2/22/2021 Conditional Approval JOHN DODGE
Deputy Fireproofing 2/22/2021 Conditional Approval JOHN DODGE
Deputy Steel/Welding 2/22/2021 Conditional Approval JOHN DODGE
Deputy Drilled-In Anchors 2/23/2021 Conditional Approval TED RIES
Deputy Fireproofing 2/23/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/23/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/24/2021 Approved TED RIES
Deputy Fireproofing 2/24/2021 Approved TED RIES
Deputy Steel/Welding 2/24/2021 Approved TED RIES
Deputy Drilled-In Anchors 2/25/2021 Conditional Approval TED RIES
Deputy Fireproofing 2/25/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/25/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 2/26/2021 Conditional Approval TED RIES
Deputy Fireproofing 2/26/2021 Conditional Approval TED RIES
Deputy Steel/Welding 2/26/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/1/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/1/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/1/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/2/2021 Approved TED RIES
Deputy Fireproofing 3/2/2021 Approved TED RIES
Deputy Steel/Welding 3/2/2021 Approved TED RIES
Deputy Drilled-In Anchors 3/3/2021 Approved TED RIES
Deputy Fireproofing 3/3/2021 Approved TED RIES
Deputy Reinf. Concrete 3/3/2021 Approved TED RIES
Deputy Reinf. Masonry 3/3/2021 Approved TED RIES
Deputy Steel/Welding 3/3/2021 Approved TED RIES
Reinforced Concrete Frame 3/3/2021 Partial Approval TED RIES
Deputy Drilled-In Anchors 3/4/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/4/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/4/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 3/4/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/4/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/5/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/5/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/5/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 3/5/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/5/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/8/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/8/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/8/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 3/8/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/8/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/9/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/9/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/9/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 3/9/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/9/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/10/2021 Approved TED RIES
Deputy Fireproofing 3/10/2021 Approved TED RIES
Deputy Reinf. Concrete 3/10/2021 Approved TED RIES
Deputy Reinf. Masonry 3/10/2021 Approved TED RIES
Deputy Steel/Welding 3/10/2021 Approved TED RIES
Deputy Drilled-In Anchors 3/11/2021 Approved TED RIES
Deputy Fireproofing 3/11/2021 Approved TED RIES
Deputy Reinf. Concrete 3/11/2021 Approved TED RIES
Deputy Reinf. Masonry 3/11/2021 Approved TED RIES
Deputy Steel/Welding 3/11/2021 Approved TED RIES
Deputy Drilled-In Anchors 3/12/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/12/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/12/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 3/12/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/12/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/15/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/15/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/15/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/16/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/16/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/16/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 3/16/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/16/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/17/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/17/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/17/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 3/17/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/17/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/18/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/18/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/18/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 3/18/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/18/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/19/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/19/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/19/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 3/19/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/19/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/22/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/22/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/22/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 3/22/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/22/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/23/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/23/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/23/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 3/23/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/23/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/24/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/24/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/24/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 3/24/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/24/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/25/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/25/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/25/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 3/25/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/25/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/26/2021 Approved JEFF BYTHEWAY
Deputy Fireproofing 3/26/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/26/2021 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 3/26/2021 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/26/2021 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 3/30/2021 Conditional Approval TED RIES
Deputy Fireproofing 3/30/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/30/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 3/30/2021 Conditional Approval TED RIES
Deputy Steel/Welding 3/30/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 3/31/2021 Approved TED RIES
Deputy Fireproofing 3/31/2021 Approved TED RIES
Deputy Reinf. Concrete 3/31/2021 Approved TED RIES
Deputy Reinf. Masonry 3/31/2021 Approved TED RIES
Deputy Steel/Welding 3/31/2021 Approved TED RIES
Deputy Drilled-In Anchors 4/1/2021 Approved TED RIES
Deputy Fireproofing 4/1/2021 Approved TED RIES
Deputy Reinf. Concrete 4/1/2021 Approved TED RIES
Deputy Reinf. Masonry 4/1/2021 Approved TED RIES
Deputy Steel/Welding 4/1/2021 Approved TED RIES
Deputy Drilled-In Anchors 4/5/2021 Conditional Approval JOHN DODGE
Deputy Fireproofing 4/5/2021 Conditional Approval JOHN DODGE
Deputy Reinf. Concrete 4/5/2021 Conditional Approval JOHN DODGE
Deputy Reinf. Masonry 4/5/2021 Conditional Approval JOHN DODGE
Deputy Steel/Welding 4/5/2021 Conditional Approval JOHN DODGE
Deputy Drilled-In Anchors 4/6/2021 Conditional Approval TED RIES
Deputy Fireproofing 4/6/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/6/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 4/6/2021 Conditional Approval TED RIES
Deputy Steel/Welding 4/6/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 4/7/2021 Conditional Approval TED RIES
Deputy Fireproofing 4/7/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/7/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 4/7/2021 Conditional Approval TED RIES
Deputy Steel/Welding 4/7/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 4/8/2021 Conditional Approval TED RIES
Deputy Fireproofing 4/8/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/8/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 4/8/2021 Conditional Approval TED RIES
Deputy Steel/Welding 4/8/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 4/9/2021 Conditional Approval TED RIES
Deputy Fireproofing 4/9/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/9/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 4/9/2021 Conditional Approval TED RIES
Deputy Steel/Welding 4/9/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 4/12/2021 Conditional Approval TED RIES
Deputy Fireproofing 4/12/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/12/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 4/12/2021 Conditional Approval TED RIES
Deputy Steel/Welding 4/12/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 4/13/2021 Conditional Approval TED RIES
Deputy Fireproofing 4/13/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/13/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 4/13/2021 Conditional Approval TED RIES
Deputy Steel/Welding 4/13/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 4/14/2021 Conditional Approval TED RIES
Deputy Fireproofing 4/14/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/14/2021 Conditional Approval TED RIES
Deputy Reinf. Masonry 4/14/2021 Conditional Approval TED RIES
Deputy Steel/Welding 4/14/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 4/15/2021 Approved DERRICK SPENCER
Deputy Fireproofing 4/15/2021 Approved DERRICK SPENCER
Deputy Reinf. Concrete 4/15/2021 Approved DERRICK SPENCER
Deputy Reinf. Masonry 4/15/2021 Approved DERRICK SPENCER
Deputy Steel/Welding 4/15/2021 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 4/16/2021 Conditional Approval JOHN DODGE
Deputy Fireproofing 4/16/2021 Conditional Approval JOHN DODGE
Deputy Reinf. Concrete 4/16/2021 Conditional Approval JOHN DODGE
Deputy Reinf. Masonry 4/16/2021 Conditional Approval JOHN DODGE
Deputy Steel/Welding 4/16/2021 Conditional Approval JOHN DODGE
Deputy Drilled-In Anchors 4/19/2021 Approved TED RIES
Deputy Fireproofing 4/19/2021 Approved TED RIES
Deputy Reinf. Concrete 4/19/2021 Approved TED RIES
Deputy Reinf. Masonry 4/19/2021 Approved TED RIES
Deputy Steel/Welding 4/19/2021 Approved TED RIES
Deputy Drilled-In Anchors 4/20/2021 Conditional Approval TED RIES
Deputy Fireproofing 4/20/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/20/2021 Conditional Approval TED RIES
Deputy Steel/Welding 4/20/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 4/21/2021 Conditional Approval TED RIES
Deputy Fireproofing 4/21/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/21/2021 Conditional Approval TED RIES
Deputy Steel/Welding 4/21/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 4/22/2021 Approved TED RIES
Deputy Fireproofing 4/22/2021 Approved TED RIES
Deputy Reinf. Concrete 4/22/2021 Approved TED RIES
Deputy Steel/Welding 4/22/2021 Approved TED RIES
Deputy Drilled-In Anchors 4/23/2021 Conditional Approval TED RIES
Deputy Fireproofing 4/23/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/23/2021 Conditional Approval TED RIES
Deputy Steel/Welding 4/23/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 4/26/2021 Conditional Approval TED RIES
Deputy Fireproofing 4/26/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/26/2021 Conditional Approval TED RIES
Deputy Steel/Welding 4/26/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 4/27/2021 Conditional Approval TED RIES
Deputy Fireproofing 4/27/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 4/27/2021 Conditional Approval TED RIES
Deputy Shotcrete 4/27/2021 Conditional Approval TED RIES
Deputy Steel/Welding 4/27/2021 Approved TED RIES
Deputy Steel/Welding 4/27/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 4/28/2021 Approved TED RIES
Deputy Fireproofing 4/28/2021 Approved TED RIES
Deputy Reinf. Concrete 4/28/2021 Approved TED RIES
Deputy Shotcrete 4/28/2021 Approved TED RIES
Deputy Steel/Welding 4/28/2021 Approved TED RIES
Deputy Drilled-In Anchors 4/29/2021 Approved TED RIES
Deputy Fireproofing 4/29/2021 Approved TED RIES
Deputy Reinf. Concrete 4/29/2021 Approved TED RIES
Deputy Shotcrete 4/29/2021 Approved TED RIES
Deputy Steel/Welding 4/29/2021 Approved TED RIES
Deputy Drilled-In Anchors 4/30/2021 Conditional Approval TED RIES
Deputy Fireproofing 4/30/2021 Conditional Approval TED RIES
Deputy Steel/Welding 4/30/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 5/3/2021 Conditional Approval TED RIES
Deputy Fireproofing 5/3/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 5/3/2021 Conditional Approval TED RIES
Deputy Steel/Welding 5/3/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 5/4/2021 Conditional Approval TED RIES
Deputy Fireproofing 5/4/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 5/4/2021 Conditional Approval TED RIES
Deputy Steel/Welding 5/4/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 5/5/2021 Approved TED RIES
Deputy Fireproofing 5/5/2021 Approved TED RIES
Deputy Reinf. Concrete 5/5/2021 Approved TED RIES
Deputy Steel/Welding 5/5/2021 Approved TED RIES
Deputy Drilled-In Anchors 5/6/2021 Conditional Approval TED RIES
Deputy Fireproofing 5/6/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 5/6/2021 Conditional Approval TED RIES
Deputy Steel/Welding 5/6/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 5/7/2021 Conditional Approval TED RIES
Deputy Fireproofing 5/7/2021 Conditional Approval TED RIES
Deputy Reinf. Concrete 5/7/2021 Conditional Approval TED RIES
Deputy Steel/Welding 5/7/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 5/10/2021 Approved TED RIES
Deputy Fireproofing 5/10/2021 Approved TED RIES
Deputy Steel/Welding 5/10/2021 Approved TED RIES
Deputy Fireproofing 6/7/2021 Conditional Approval TED RIES
Deputy Fireproofing 6/8/2021 Approved TED RIES
Deputy Fireproofing 6/9/2021 Approved TED RIES
Deputy Fireproofing 6/10/2021 Approved TED RIES
Deputy Fireproofing 6/11/2021 Approved TED RIES
Final 10/27/2023 Permit Finaled DERRICK SPENCER
Smoke Detectors 10/27/2023 Approved DERRICK SPENCER