2859 N LA CASTANA DR 90046

Certificate Information: 2859 N LA CASTANA DR 90046

Application / Permit
19014-10000-07208
Plan Check / Job No.
B19LA27549
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW ADDITION TO EXISTING SINGLE FAMILY DWELLING WITH ATTACHED GARAGE. NEW DECK AT THE REAR OF THE BUILDING. REMOVE AND REPLACE WINDOWS AND INSTALL NEW WINDOWS. INTERIOR REMODEL OF EXISTING SINGLE FAMILY DWELLING.
Permit Issued
Issued on 8/6/2020
Issuing Office
Current Status
CofO Issued on 4/11/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/30/2019 APPLICANT
Assigned to Plan Check Engineer 2/13/2020 MANUEL MONTUFAR
Corrections Issued 2/20/2020 MANUEL MONTUFAR
Quality Review Completed 3/4/2020 HERNAN ARREOLA
Building Plans Picked Up 3/6/2020 APPLICANT
Green Plans Picked Up 3/6/2020 APPLICANT
Applicant returned to address corrections 6/25/2020 MANUEL MONTUFAR
Applicant returned to address corrections 7/7/2020 MANUEL MONTUFAR
Applicant returned to address corrections 7/28/2020 MANUEL MONTUFAR
Plan Check Approved 8/6/2020 MANUEL MONTUFAR
Issued 8/6/2020 APPLICANT
Permit Closed-Status Void 10/22/2020 BRIAN SULLIVAN
Re-Activate Permit 10/26/2020 BRIAN SULLIVAN
CofO in Progress 3/24/2023 BRIAN SULLIVAN
Permit Finaled 4/11/2023 DEROLD HAUFF
CofO Issued 4/11/2023 DEROLD HAUFF
Permit Finaled 4/11/2023 DEROLD HAUFF

Permit Application Clearance Information

GPI Written Notices Cleared 5/20/2020 MANUEL MONTUFAR
Low Impact Development Cleared 5/20/2020 MARTIN FRAGOSO
Specific Plan Cleared 5/26/2020 DOMINICK ORTIZ
ZI Cleared 5/26/2020 DOMINICK ORTIZ
Sewer availability Cleared 6/2/2020 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 6/4/2020 WALLIE JONG
Green Code Cleared 6/23/2020 MANUEL MONTUFAR
Roof/Waste drainage to street Cleared 6/23/2020 WALLIE JONG
Miscellaneous Cleared 7/7/2020 MANUEL MONTUFAR

Contact Information

Architect Boyle,, Spencer T; Lic. No.: C38077 1333 VALLEY VIEW ROAD #19      GLENDALE, CA 91202
Contractor Gramercy Group Design And Build Inc The; Lic. No.: 943331-B 149 S BARRINGTON AVENUE   SUITE 671    BRENTWOOD, CA 90049
Engineer De, Leon, Cynthia Aguilar; Lic. No.: C31604 8061 SAN MATEO CIR      BUENA PARK, CA 90620
Engineer Mahn,, Jonathan Edward; Lic. No.: C60293 12848 FOOTHILL BLVD      SYLMAR, CA 91381
Engineer Obando,, Gaspar Eduardo; Lic. No.: C71382 1453 14TH ST STE A      SANTA MONICA, CA 90404
Engineer Roth,, Jennifer Nicole; Lic. No.: C84889 110 THE VILLAGE UNIT 504      REDONDO BEACH, CA 90277
Geologist Pongracz-Bartha,, Ed; Lic. No.: EG2370 10501 COLLETT AVE      GRANADA HILLS, CA 91344

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Grading 10/9/2020 Conditional Approval BRIAN SULLIVAN
Deputy Reinf. Concrete 10/22/2020 Conditional Approval BRIAN SULLIVAN
Piling/Pier/Caisson 10/22/2020 Corrections Issued BRIAN SULLIVAN
Piling/Pier/Caisson 10/27/2020 Corrections Issued BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 12/7/2020 Partial Approval BRIAN SULLIVAN
Piling/Pier/Caisson 12/7/2020 Approved BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 12/15/2020 Partial Approval BRIAN SULLIVAN
Deputy Reinf. Concrete 12/17/2020 Conditional Approval BRIAN SULLIVAN
Deputy Grading 1/5/2021 Conditional Approval BRIAN SULLIVAN
Deputy Grading 1/6/2021 Conditional Approval BRIAN SULLIVAN
Deputy Grading 1/7/2021 No Access for Inspection ELMER BLAND
Deputy Grading 1/8/2021 Conditional Approval BRIAN SULLIVAN
Deputy Grading 1/11/2021 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 1/22/2021 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 1/22/2021 Partial Approval BRIAN SULLIVAN
Piling/Pier/Caisson 1/22/2021 Approved BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 1/25/2021 Partial Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 2/5/2021 Partial Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 2/19/2021 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 2/19/2021 Partial Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 2/26/2021 Partial Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 3/11/2021 Corrections Issued BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 3/30/2021 Partial Approval BRIAN SULLIVAN
Green Building Rough 3/30/2021 Not Ready for Inspection BRIAN SULLIVAN
Reinforced Concrete Frame 3/30/2021 Partial Approval BRIAN SULLIVAN
Deputy Steel/Welding 5/19/2021 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 6/22/2021 Approved BRIAN SULLIVAN
Footing/Foundation/Slab 6/22/2021 Approved BRIAN SULLIVAN
PLUMBING-Rough 6/22/2021 Partial Approval BRIAN SULLIVAN
Service/Power Release 8/20/2021 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Rough 10/12/2021 Partial Inspection RAUL BARAJAS
Deputy Drilled-In Anchors 12/20/2021 Conditional Approval BRIAN SULLIVAN
BUILDING-Rough-Frame 5/2/2022 Not Ready for Inspection BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 5/2/2022 Not Ready for Inspection BRIAN SULLIVAN
Green Building Rough 5/2/2022 Not Ready for Inspection BRIAN SULLIVAN
Wood Frame 5/2/2022 Not Ready for Inspection BRIAN SULLIVAN
Deputy Wood Construction 5/3/2022 Conditional Approval BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 5/4/2022 Partial Approval BRIAN SULLIVAN
Wood Frame 5/4/2022 Partial Approval BRIAN SULLIVAN
PLUMBING-Rough 6/13/2022 Approved BRIAN SULLIVAN
HVAC-Rough 6/22/2022 Approved BRIAN SULLIVAN
Shower Pan 7/8/2022 Approved BRIAN SULLIVAN
ELECTRICAL-Rough 7/18/2022 Partial Approval RYAN SALAZAR
Interior/Exterior Lathing 7/21/2022 Partial Approval BRIAN SULLIVAN
BUILDING-Rough-Frame 7/27/2022 Partial Approval BRIAN SULLIVAN
Interior/Exterior Lathing 7/27/2022 Approved BRIAN SULLIVAN
Deputy Wood Construction 8/5/2022 Conditional Approval BRIAN SULLIVAN
Insulation 8/17/2022 Approved BRIAN SULLIVAN
Drywall Nailing 8/19/2022 Approved BRIAN SULLIVAN
Green Building Rough 8/19/2022 Approved BRIAN SULLIVAN
Enclosure/Fence 11/16/2022 Partial Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 3/9/2023 Approved BRIAN SULLIVAN
ELECTRICAL-Final 3/9/2023 Approved BRIAN SULLIVAN
Final 3/9/2023 Not Ready for Inspection BRIAN SULLIVAN
Green Building Final 3/9/2023 Approved BRIAN SULLIVAN
HVAC-Final 3/9/2023 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Final 3/9/2023 Not Ready for Inspection BRIAN SULLIVAN
Reinforced Concrete Frame 3/9/2023 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 3/9/2023 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 3/9/2023 Approved BRIAN SULLIVAN
Final 3/20/2023 OK to Issue CofO BRIAN SULLIVAN
HVAC-Final 3/20/2023 Approved BRIAN SULLIVAN
PLUMBING-Final 3/20/2023 Approved BRIAN SULLIVAN