2346 N EDGEWATER TER 90039

Certificate Information: 2346 N EDGEWATER TER 90039

Application / Permit
19014-10000-06800
Plan Check / Job No.
B19LA26449
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL OF (E) SFD AND ADDITION
Permit Issued
Issued on 8/5/2020
Issuing Office
Valley
Current Status
CofO Issued on 9/20/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/16/2019 APPLICANT
Assigned to Plan Check Engineer 1/16/2020 LAURA DUONG
Corrections Issued 1/29/2020 LAURA DUONG
Quality Review Completed 1/29/2020 KEN GILL
Building Plans Picked Up 1/30/2020 APPLICANT
Green Plans Picked Up 6/5/2020 APPLICANT
Plan Check Approved 6/29/2020 LAURA DUONG
Issued 8/5/2020 APPLICANT
CofO in Progress 9/14/2021 JOSEPH MCGARRY
Permit Finaled 9/20/2021 DEROLD HAUFF
CofO Issued 9/20/2021 DEROLD HAUFF
Permit Finaled 9/20/2021 DEROLD HAUFF

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 3/9/2020 ELENA LOPEZ
Roof/Waste drainage to street Cleared 3/9/2020 ELENA LOPEZ
Green Code Cleared 6/5/2020 VIVIAN LAO
Grading Pre-Inspection Cleared 6/10/2020 LAURA DUONG

Contact Information

Contractor Mega Builders Inc; Lic. No.: 898347-B 18375 VENTURA BLVD SUITE 520      TARZANA, CA 91356
Engineer Arakelyan,, Aram; Lic. No.: C82796 145 S GLENOAKS BI 328      BURBANK, CA 91502

Inspector Information

ENRIQUE MIRELES, (213) 202-3438 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/19/2020 Not Ready for Inspection CHRIS CHRISTENSEN
Footing/Foundation/Slab 8/24/2020 Corrections Issued OSVALDO PARAMO
Footing/Foundation/Slab 8/31/2020 Approved JOSEPH MCGARRY
Wood Frame 9/9/2020 Partial Approval JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 9/14/2020 Partial Approval JOSEPH MCGARRY
Insulation 9/14/2020 Partial Approval JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 10/23/2020 Partial Approval JOSEPH MCGARRY
BUILDING-Rough-Frame 11/23/2020 Not Ready for Inspection CHRIS CHRISTENSEN
ELECTRICAL-Rough 11/23/2020 Approved CHRIS CHRISTENSEN
Green Building Rough 11/23/2020 Not Ready for Inspection CHRIS CHRISTENSEN
HVAC-Rough 11/23/2020 Approved CHRIS CHRISTENSEN
PLUMBING-Rough 11/23/2020 Approved CHRIS CHRISTENSEN
BUILDING-Rough-Frame 12/10/2020 Approved OSVALDO PARAMO
Green Building Rough 12/10/2020 Approved OSVALDO PARAMO
Insulation 12/15/2020 Approved JOSEPH MCGARRY
Drywall Nailing 12/17/2020 Approved JOSEPH MCGARRY
Interior/Exterior Lathing 12/29/2020 Partial Approval JOSEPH MCGARRY
Shower Pan 12/29/2020 Approved JOSEPH MCGARRY
Final 8/9/2021 Corrections Issued JOSEPH MCGARRY
Green Building Final 8/9/2021 Approved JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 8/9/2021 SGSOV Approved JOSEPH MCGARRY
Smoke Detectors 8/9/2021 Approved JOSEPH MCGARRY
Final 9/1/2021 OK to Issue CofO JOSEPH MCGARRY