3102 W 36TH ST 90018

Certificate Information: 3102 W 36TH ST 90018

Application / Permit
19014-10000-06128
Plan Check / Job No.
B19LA24068
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
ADDITION OF 4 STORY CORE& SHELL OFFICE BUILDING ( PHASE II) WITH ROOF DECK OVER SUBTERRANEAN PARKING GARAGE TO PARKING STRUCTURE ( PARKING STRUCTURE PERMIT # 19010-10000-02837).
Permit Issued
Issued on 1/13/2021
Issuing Office
Metro
Current Status
CofO Issued on 7/13/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/12/2019 APPLICANT
Assigned to Plan Check Engineer 11/21/2019 GARO TELMI
Corrections Issued 12/2/2019 GARO TELMI
Quality Review Completed 12/2/2019 KEN GILL
Building Plans Picked Up 12/10/2019 APPLICANT
Applicant returned to address corrections 1/8/2020 GARO TELMI
Applicant returned to address corrections 1/15/2020 GARO TELMI
Disabled Access Plans Picked Up 1/15/2020 APPLICANT
Applicant returned to address corrections 1/30/2020 GARO TELMI
Applicant returned to address corrections 7/23/2020 GARO TELMI
Applicant returned to address corrections 9/3/2020 GARO TELMI
Applicant returned to address corrections 9/24/2020 GARO TELMI
Applicant returned to address corrections 10/1/2020 GARO TELMI
Applicant returned to address corrections 10/9/2020 GARO TELMI
Applicant returned to address corrections 10/15/2020 GARO TELMI
Green Plans Picked Up 11/10/2020 APPLICANT
Plan Check Approved 12/30/2020 GARO TELMI
Issued 1/13/2021 APPLICANT
TCO Issued (Expire Date: 09-14-2022) 3/18/2022 TERRY HERR
CofO in Progress 7/13/2022 RUSSELL BONVOULOIR
Permit Finaled 7/13/2022 ERNESTO CORRAL
CofO Issued 7/13/2022 ERNESTO CORRAL
Permit Finaled 7/13/2022 ERNESTO CORRAL

Permit Application Clearance Information

Encroachment in public way Cleared 1/29/2020 ELENA LOPEZ
Metro Rail approval Cleared 3/6/2020 GARO TELMI
Green Code Cleared 3/11/2020 GARO TELMI
Construction near power lines Cleared 4/30/2020 WALTER RAMIREZ
Construction within easement Cleared 4/30/2020 WALTER RAMIREZ
Eng Process Fee Ord 176,300 Cleared 5/28/2020 RENZ SORIANO
Permit Cleared 5/28/2020 RENZ SORIANO
Address approval Cleared 5/29/2020 RENZ SORIANO
Sewer availability Cleared 6/2/2020 RENZ SORIANO
Low Impact Development Cleared 6/23/2020 ORVAL HERNANDEZ-MARCI
Trees in Parkway Cleared 6/24/2020 JOHN KIM
Roof/Waste drainage to street Cleared 7/2/2020 WALLIE JONG
Internal circulation Cleared 7/7/2020 MOHAMMAD HASAN
Specific Plan Cleared 7/7/2020 MOHAMMAD HASAN
Transportation Demand Ord. Cleared 7/7/2020 MOHAMMAD HASAN
Historic Resource Verification Cleared 8/4/2020 MICAELA TORRES-GIL
Building over 3-story or 36-ft Cleared 8/7/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/7/2020 CALOSHA APPROVED
Highway dedication Cleared 8/31/2020 THAN WIN
Hydrant and Access approval Cleared 9/14/2020 MATTHEW CRAIG
Work Adjacent to Public Way Cleared 9/15/2020 CHIU TAM
"D" conditions Cleared 10/14/2020 KYLE WINSTON
Specific Plan Cleared 10/14/2020 KYLE WINSTON
DAS Clearance Cleared 10/22/2020 ELIZABETH TOMS
Miscellaneous Cleared 11/2/2020 KYLE WINSTON
Tract Map conditions Cleared 11/2/2020 KYLE WINSTON
Redevelopment Project Area Cleared 11/10/2020 DAVID URITA
Fire Marshall Fire Life Safety Cleared 11/18/2020 DOMINIQUE MEDINA
Miscellaneous Cleared 12/4/2020 KYLE WINSTON

Contact Information

Architect Swartz,, David Louis; Lic. No.: C19729 1437 4TH STREET SUITE 400      SANTA MONICA, CA 90401
Contractor G C X Llc; Lic. No.: 1045286-B 221 S FIGUEROA ST #240      LOS ANGELES, CA 90012
Engineer Albus,, David Edward; Lic. No.: GE2455 1612 WINDSOR LN      SANTA ANA, CA 92705
Engineer Breaks,, Matthew Calvin; Lic. No.: S6028 5056 TUJUNGA AVE APT 17      NORTH HOLLYWOOD, CA 91601
Engineer Mcdougall,, Dane Philip; Lic. No.: L9297 6 ORCHARD STE 200      LAKE FOREST, CA 92630
Engineer Risha,, Janah Adib; Lic. No.: C46811 410 EAST CYPRESS AVE      BURBANK, CA 91501

Inspector Information

PAUL BAZERKANIAN, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI
LUIS CCAMACHO, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI
ALAN MORELOS, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Methane Barrier 2/12/2021 Conditional Approval LANNY MERRICK
METHANE-Subgrade 2/13/2021 Off-Hour Fees Due
METHANE-Subgrade 2/13/2021 Partial Approval JONATHAN QUACH
Deputy Methane Barrier 2/19/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Methane Barrier 2/22/2021 Conditional Approval LANNY MERRICK
Excavation/Setback/Form/Re-Bar 2/22/2021 Partial Approval LANNY MERRICK
Green Building Rough 2/23/2021 Not Ready for Inspection LANNY MERRICK
METHANE-Rough 2/23/2021 Not Ready for Inspection LANNY MERRICK
Reinforced Concrete Frame 2/23/2021 Not Ready for Inspection LANNY MERRICK
Reinforced Masonry Frame 2/23/2021 Not Ready for Inspection LANNY MERRICK
Deputy Methane Barrier 2/24/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Methane Barrier 2/25/2021 Conditional Approval RUSSELL BONVOULOIR
METHANE-Barrier 2/25/2021 Conditional Approval LANNY MERRICK
METHANE-Subgrade 2/25/2021 Partial Approval LANNY MERRICK
Deputy Drilled-In Anchors 2/26/2021 Conditional Approval LANNY MERRICK
Green Building Rough 2/26/2021 Not Ready for Inspection LANNY MERRICK
METHANE-Rough 2/26/2021 Partial Approval LANNY MERRICK
Reinforced Concrete Frame 2/26/2021 Not Ready for Inspection LANNY MERRICK
Special/Order Compliance 3/1/2021 Partial Approval LANNY MERRICK
Piling/Pier/Caisson 3/3/2021 Partial Approval LANNY MERRICK
Deputy Reinf. Concrete 3/12/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 3/15/2021 Conditional Approval LANNY MERRICK
Green Building Rough 3/15/2021 Not Ready for Inspection LANNY MERRICK
METHANE-Rough 3/15/2021 Partial Approval LANNY MERRICK
Reinforced Concrete Frame 3/15/2021 Not Ready for Inspection LANNY MERRICK
Deputy Reinf. Concrete 3/16/2021 Conditional Approval LANNY MERRICK
Deputy Reinf. Concrete 3/17/2021 Conditional Approval LANNY MERRICK
Reinforced Masonry Frame 3/17/2021 Partial Approval LANNY MERRICK
Deputy Reinf. Concrete 3/18/2021 Conditional Approval LANNY MERRICK
Deputy Shotcrete 3/30/2021 Conditional Approval LANNY MERRICK
Deputy Shotcrete 3/31/2021 Conditional Approval LANNY MERRICK
Green Building Rough 3/31/2021 Approved LANNY MERRICK
METHANE-Rough 3/31/2021 Approved LANNY MERRICK
Reinforced Concrete Frame 3/31/2021 Partial Approval LANNY MERRICK
Deputy Shotcrete 4/1/2021 Conditional Approval LANNY MERRICK
Deputy Reinf. Concrete 4/5/2021 Conditional Approval DANIEL COLLINS
Deputy Shotcrete 4/5/2021 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 4/6/2021 Conditional Approval DANIEL COLLINS
Deputy Methane Barrier 4/15/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 4/26/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 4/29/2021 Conditional Approval LEOPOLDO MENDOZA
Reinforced Concrete Frame 4/29/2021 Partial Inspection LEOPOLDO MENDOZA
Footing/Foundation/Slab 4/30/2021 Partial Approval LEOPOLDO MENDOZA
METHANE-Barrier 4/30/2021 Not Ready for Inspection LEOPOLDO MENDOZA
METHANE-Subgrade 4/30/2021 Not Ready for Inspection LEOPOLDO MENDOZA
Deputy Reinf. Concrete 5/3/2021 Conditional Approval LEOPOLDO MENDOZA
Reinforced Concrete Frame 5/5/2021 Partial Inspection LEOPOLDO MENDOZA
Deputy Shotcrete 5/17/2021 Conditional Approval LEOPOLDO MENDOZA
Reinforced Concrete Frame 5/17/2021 Not Ready for Inspection LEOPOLDO MENDOZA
Deputy Shotcrete 5/18/2021 Conditional Approval LEOPOLDO MENDOZA
Excavation/Setback/Form/Re-Bar 5/18/2021 Partial Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/19/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Shotcrete 5/20/2021 Conditional Approval LEOPOLDO MENDOZA
Reinforced Concrete Frame 5/24/2021 Not Ready for Inspection JOEY BUCHANAN
Special/Order Compliance 6/8/2021 Partial Inspection LEOPOLDO MENDOZA
Reinforced Concrete Frame 6/15/2021 Corrections Issued LEOPOLDO MENDOZA
Deputy Reinf. Concrete 6/21/2021 Conditional Approval RUSSELL BONVOULOIR
Reinforced Concrete Frame 6/21/2021 Partial Inspection LEOPOLDO MENDOZA
Deputy Reinf. Concrete 6/28/2021 Conditional Approval LEOPOLDO MENDOZA
Footing/Foundation/Slab 6/28/2021 Partial Approval LEOPOLDO MENDOZA
METHANE-Barrier 6/28/2021 Not Ready for Inspection LEOPOLDO MENDOZA
METHANE-Subgrade 6/28/2021 Not Ready for Inspection LEOPOLDO MENDOZA
Deputy Reinf. Concrete 6/29/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Masonry 7/7/2021 Conditional Approval LEOPOLDO MENDOZA
Masonry Wall/Backfill 7/9/2021 Partial Approval LEOPOLDO MENDOZA
Deputy Reinf. Masonry 7/12/2021 Conditional Approval LEOPOLDO MENDOZA
Reinforced Masonry Frame 7/14/2021 Partial Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 7/21/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 7/22/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 7/23/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 7/23/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 7/26/2021 Conditional Approval LEOPOLDO MENDOZA
Structural Steel Frame 7/26/2021 Partial Inspection LEOPOLDO MENDOZA
Deputy Steel/Welding 7/27/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 7/28/2021 Conditional Approval LEOPOLDO MENDOZA
Excavation/Setback/Form/Re-Bar 7/29/2021 Partial Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 7/30/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Masonry 8/2/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 8/2/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Masonry 8/3/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 8/3/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 8/4/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 8/5/2021 Conditional Approval LEOPOLDO MENDOZA
Masonry Wall/Backfill 8/5/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 8/10/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 8/11/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 8/11/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 8/12/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 8/12/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 8/13/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 8/16/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 8/17/2021 Conditional Approval TIMOTHY BUXTON
Deputy Steel/Welding 8/18/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 8/19/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 8/20/2021 Conditional Approval LANNY MERRICK
Deputy Steel/Welding 8/20/2021 Conditional Approval LANNY MERRICK
Deputy Steel/Welding 8/23/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 8/24/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 8/25/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 8/26/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 8/26/2021 Conditional Approval LEOPOLDO MENDOZA
Excavation/Setback/Form/Re-Bar 8/26/2021 Partial Inspection LEOPOLDO MENDOZA
Deputy Steel/Welding 8/27/2021 Conditional Approval LEOPOLDO MENDOZA
Reinforced Concrete Frame 8/27/2021 Partial Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 8/30/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 8/31/2021 Approved JOEY BUCHANAN
Deputy Steel/Welding 9/1/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/2/2021 Conditional Approval LEOPOLDO MENDOZA
Pre-Inspection 9/2/2021 Partial Inspection LEOPOLDO MENDOZA
Deputy Steel/Welding 9/3/2021 Conditional Approval LEOPOLDO MENDOZA
Reinforced Concrete Frame 9/3/2021 Partial Approval LEOPOLDO MENDOZA
Excavation/Setback/Form/Re-Bar 9/7/2021 Partial Inspection LEOPOLDO MENDOZA
Deputy Reinf. Concrete 9/8/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/8/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/9/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/10/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Reinf. Concrete 9/13/2021 Conditional Approval MARK FERRARI
Deputy Steel/Welding 9/13/2021 Conditional Approval JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 9/13/2021 Conditional Approval DARRYL ARNOLD
Reinforced Concrete Frame 9/13/2021 Conditional Approval DARRYL ARNOLD
Deputy Reinf. Concrete 9/14/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/14/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/15/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/16/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/17/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/20/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/21/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/22/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/23/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 9/24/2021 Conditional Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/24/2021 Conditional Approval LEOPOLDO MENDOZA
Light Gage Steel Frame 9/24/2021 Partial Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/27/2021 Conditional Approval LEOPOLDO MENDOZA
Light Gage Steel Frame 9/27/2021 Partial Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/28/2021 Conditional Approval LEOPOLDO MENDOZA
Drywall Nailing 9/28/2021 Partial Approval LEOPOLDO MENDOZA
Light Gage Steel Frame 9/28/2021 Partial Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/29/2021 Conditional Approval LEOPOLDO MENDOZA
Drywall Nailing 9/29/2021 Partial Approval LEOPOLDO MENDOZA
Insulation 9/29/2021 Partial Approval LEOPOLDO MENDOZA
Light Gage Steel Frame 9/29/2021 Partial Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 9/30/2021 Conditional Approval LEOPOLDO MENDOZA
Drywall Nailing 9/30/2021 Partial Approval LEOPOLDO MENDOZA
Insulation 9/30/2021 Partial Approval LEOPOLDO MENDOZA
Light Gage Steel Frame 9/30/2021 Partial Approval LEOPOLDO MENDOZA
Deputy Steel/Welding 10/1/2021 Conditional Approval LEOPOLDO MENDOZA
Drywall Nailing 10/4/2021 Partial Approval LEOPOLDO MENDOZA
Light Gage Steel Frame 10/4/2021 Partial Inspection LEOPOLDO MENDOZA
Drywall Nailing 10/5/2021 Partial Approval LEOPOLDO MENDOZA
Insulation 10/5/2021 Not Ready for Inspection LEOPOLDO MENDOZA
Light Gage Steel Frame 10/5/2021 Partial Inspection LEOPOLDO MENDOZA
Deputy Drilled-In Anchors 10/6/2021 Conditional Approval LEOPOLDO MENDOZA
Drywall Nailing 10/6/2021 Partial Approval LEOPOLDO MENDOZA
Drywall Nailing 10/7/2021 Not Ready for Inspection LEOPOLDO MENDOZA
Insulation 10/7/2021 Not Ready for Inspection LEOPOLDO MENDOZA
Light Gage Steel Frame 10/7/2021 Not Ready for Inspection LEOPOLDO MENDOZA
Drywall Nailing 10/12/2021 Partial Approval RUSSELL BONVOULOIR
Insulation 10/12/2021 Partial Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 10/12/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Wood Construction 10/13/2021 Conditional Approval RUSSELL BONVOULOIR
Drywall Nailing 10/13/2021 Partial Approval RUSSELL BONVOULOIR
Insulation 10/13/2021 Partial Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 10/13/2021 Partial Approval RUSSELL BONVOULOIR
Floor/Roof Diaphrgm/Shear Wall 10/22/2021 Partial Inspection RUSSELL BONVOULOIR
Insulation 10/22/2021 Partial Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 10/22/2021 Partial Approval RUSSELL BONVOULOIR
Drywall Nailing 11/1/2021 Partial Approval RUSSELL BONVOULOIR
Insulation 11/1/2021 Not Ready for Inspection RUSSELL BONVOULOIR
Drywall Nailing 11/8/2021 Partial Approval RUSSELL BONVOULOIR
Insulation 11/8/2021 Partial Inspection RUSSELL BONVOULOIR
Drywall Nailing 11/10/2021 Partial Approval RUSSELL BONVOULOIR
Insulation 11/10/2021 Partial Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 11/10/2021 Partial Approval RUSSELL BONVOULOIR
Insulation 11/19/2021 Partial Approval TIMOTHY BUXTON
Drywall Nailing 11/23/2021 Partial Approval RUSSELL BONVOULOIR
Insulation 11/23/2021 Partial Approval RUSSELL BONVOULOIR
Special/Order Compliance 11/23/2021 Approved RUSSELL BONVOULOIR
Reinforced Masonry Frame 11/30/2021 Partial Inspection TED RIES
Drywall Nailing 12/8/2021 Partial Approval RUSSELL BONVOULOIR
Insulation 12/8/2021 Partial Inspection RUSSELL BONVOULOIR
Light Gage Steel Frame 12/8/2021 Partial Approval RUSSELL BONVOULOIR
Insulation 12/10/2021 Partial Approval RUSSELL BONVOULOIR
Light Gage Steel Frame 12/10/2021 Partial Approval RUSSELL BONVOULOIR
Interior/Exterior Lathing 12/14/2021 Partial Approval JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 12/16/2021 Partial Inspection RUSSELL BONVOULOIR
Reinforced Concrete Frame 12/16/2021 Partial Inspection RUSSELL BONVOULOIR
Deputy Reinf. Concrete 12/17/2021 Conditional Approval RUSSELL BONVOULOIR
Footing/Foundation/Slab 12/17/2021 Partial Approval RUSSELL BONVOULOIR
METHANE-Barrier 12/17/2021 Approved RUSSELL BONVOULOIR
METHANE-Subgrade 12/17/2021 Approved RUSSELL BONVOULOIR
Drywall Nailing 12/21/2021 Not Ready for Inspection RUSSELL BONVOULOIR
Light Gage Steel Frame 12/21/2021 Not Ready for Inspection RUSSELL BONVOULOIR
Drywall Nailing 12/22/2021 Partial Inspection RUSSELL BONVOULOIR
Insulation 12/22/2021 Partial Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 1/11/2022 Conditional Approval RUSSELL BONVOULOIR
Special/Order Compliance 1/18/2022 Approved RUSSELL BONVOULOIR
T-Bar Ceiling 1/18/2022 Not Ready for Inspection RUSSELL BONVOULOIR
Special/Order Compliance 3/9/2022 Approved RUSSELL BONVOULOIR
Pre-Inspection 3/10/2022 Approved RUSSELL BONVOULOIR
Final 3/11/2022 Conditional Approval RUSSELL BONVOULOIR
Footing/Foundation/Slab 3/11/2022 Approved RUSSELL BONVOULOIR
Green Building Final 3/11/2022 Approved RUSSELL BONVOULOIR
Reinforced Concrete Frame 3/11/2022 Approved RUSSELL BONVOULOIR
Reinforced Masonry Frame 3/11/2022 Approved RUSSELL BONVOULOIR
SGSOV-Seismic Gas S/O Valve 3/11/2022 SGSOV Approved RUSSELL BONVOULOIR
Smoke Detectors 3/11/2022 Approved RUSSELL BONVOULOIR
Final 3/16/2022 Partial Inspection RUSSELL BONVOULOIR
Special/Order Compliance 3/16/2022 Partial Inspection RUSSELL BONVOULOIR
Final 3/25/2022 Conditional Approval RUSSELL BONVOULOIR