6600 N TOPANGA CANYON BLVD 91303

Certificate Information: 6600 N TOPANGA CANYON BLVD 91303

Application / Permit
19014-10000-06122
Plan Check / Job No.
B19LA24035
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(16) Shopping Center
Work Description
NEW GROUND-UP AND SHELL ADDITION TO EXISTING MALL TO ADD FOOD COURT, RETAIL AND MOVIE THEATHER.
Permit Issued
Issued on 9/28/2020
Issuing Office
Metro
Current Status
CofO Issued on 3/8/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/13/2019 APPLICANT
Assigned to Plan Check Engineer 11/26/2019 QUAN NGHIEM
Corrections Issued 3/17/2020 QUAN NGHIEM
Quality Review Completed 3/25/2020 ALLEN MANALANSAN
Building Plans Picked Up 4/2/2020 APPLICANT
Applicant returned to address corrections 4/24/2020 QUAN NGHIEM
Applicant returned to address corrections 5/26/2020 QUAN NGHIEM
Applicant returned to address corrections 6/4/2020 QUAN NGHIEM
Applicant returned to address corrections 6/5/2020 QUAN NGHIEM
Applicant returned to address corrections 7/9/2020 QUAN NGHIEM
Green Plans Picked Up 7/21/2020 APPLICANT
Applicant returned to address corrections 8/11/2020 QUAN NGHIEM
Applicant returned to address corrections 8/12/2020 QUAN NGHIEM
Applicant returned to address corrections 8/14/2020 QUAN NGHIEM
Plan Check Approved 9/28/2020 QUAN NGHIEM
Issued 9/28/2020 APPLICANT
TCO Issued (Expire Date: 11-21-2022) 5/25/2022 RICKEY JACKSON
TCO Issued (Expire Date: 05-27-2023) 11/28/2022 RICKEY JACKSON
CofO in Progress 3/8/2023 JEFFREY FULTON
Permit Finaled 3/8/2023 RICKEY JACKSON
CofO Issued 3/8/2023 RICKEY JACKSON
Permit Finaled 3/8/2023 RICKEY JACKSON

Permit Application Clearance Information

Sewer availability Cleared 3/31/2020 GUILLERMO PETRA
Eng Process Fee Ord 176,300 Cleared 4/17/2020 PAMELA TENEZA
Hydrant and Access approval Cleared 4/21/2020 KURT CORRAL
Address approval Cleared 4/23/2020 GUILLERMO PETRA
Green Code Cleared 4/23/2020 KHEDER ALRAZAA
Roof/Waste drainage to street Cleared 4/23/2020 GUILLERMO PETRA
Specific Plan Cleared 5/8/2020 MARITZA PRZEKOP
ZA Case Cleared 5/8/2020 MARITZA PRZEKOP
ZI Cleared 5/8/2020 MARITZA PRZEKOP
Low Impact Development Cleared 7/27/2020 MARTIN FRAGOSO
DAS Clearance Cleared 8/25/2020 ELIZABETH TOMS
Fire Marshall Fire Life Safety Cleared 9/22/2020 WILLIAM JOHNS
Food Service Establishment Cleared 9/22/2020 KENNETH BROWNE
Specific Plan Cleared 9/24/2020 SHEILA AHORAIAN
Food establishment approval Cleared 9/25/2020 LACDHS APPROVED
Miscellaneous Cleared 9/25/2020 MARITZA PRZEKOP

Contact Information

Architect Budetti,, Robert Peter; Lic. No.: C23757 49 NIGHTHAWK      IRVINE, CA 926043609
Contractor Westfield Ddc Inc; Lic. No.: 1055618-B 2049 CENTURY PARK EAST      LOS ANGELES, CA 90067
Engineer Siegel,, Timothy Carl; Lic. No.: C78792 1808 NORTHSHORE HILLS E      KNOXVILLE, TN 37922
Engineer Volnyy,, Vladimir A; Lic. No.: S4817 11342 PALA MESA DR      NORTHRIDGE, CA 91326

Inspector Information

EDWIN GREGORYONA, (818) 374-1105 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 9/30/2020 Partial Inspection JEFFREY DURAN
Pre-Inspection 9/30/2020 Partial Inspection JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/1/2020 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 10/2/2020 Partial Inspection JEFFREY FULTON
Pre-Inspection 10/6/2020 Not Ready for Inspection JEFFREY FULTON
Footing/Foundation/Slab 10/8/2020 Partial Approval JEFFREY DURAN
Piling/Pier/Caisson 10/13/2020 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/15/2020 Partial Approval DANIEL VARNUM
Piling/Pier/Caisson 10/15/2020 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 10/16/2020 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/19/2020 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 10/20/2020 Partial Approval JEFFREY DURAN
Pre-Inspection 10/20/2020 Partial Approval JEFFREY DURAN
Piling/Pier/Caisson 10/21/2020 Partial Approval DANIEL VARNUM
Piling/Pier/Caisson 10/22/2020 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 10/23/2020 Partial Approval DANIEL VARNUM
Piling/Pier/Caisson 10/26/2020 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 10/27/2020 Partial Inspection DANIEL VARNUM
Piling/Pier/Caisson 10/27/2020 No Access for Inspection DANIEL VARNUM
Piling/Pier/Caisson 10/29/2020 Approved HAMID PISHEHVAR
Footing/Foundation/Slab 10/30/2020 Not Ready for Inspection JEFFREY FULTON
Piling/Pier/Caisson 10/30/2020 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 11/2/2020 Partial Approval JONATHAN QUACH
Green Building Rough 11/2/2020 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 11/2/2020 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 11/4/2020 Partial Inspection JEFFREY DURAN
Footing/Foundation/Slab 11/9/2020 Partial Approval JEFFREY DURAN
Green Building Rough 11/9/2020 Not Ready for Inspection JEFFREY DURAN
Reinforced Concrete Frame 11/9/2020 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 11/12/2020 Partial Approval HAMID PISHEHVAR
Green Building Rough 11/12/2020 Not Ready for Inspection HAMID PISHEHVAR
Reinforced Concrete Frame 11/12/2020 Partial Inspection HAMID PISHEHVAR
Deputy Grading 11/16/2020 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 11/16/2020 Partial Inspection JEFFREY FULTON
Grading Pre-Inspection 11/16/2020 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 11/16/2020 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 11/16/2020 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 11/17/2020 Not Ready for Inspection HAMID PISHEHVAR
Footing/Foundation/Slab 11/18/2020 Partial Approval JEFFREY DURAN
Green Building Rough 11/18/2020 Not Ready for Inspection JEFFREY DURAN
Reinforced Concrete Frame 11/18/2020 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 11/20/2020 Partial Approval JEFFREY DURAN
Green Building Rough 11/20/2020 Partial Approval JEFFREY DURAN
Reinforced Concrete Frame 11/20/2020 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 11/24/2020 Partial Approval RICKEY JACKSON
Footing/Foundation/Slab 12/1/2020 Not Ready for Inspection JEFFREY FULTON
Footing/Foundation/Slab 12/3/2020 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 12/14/2020 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 12/23/2020 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 12/28/2020 Not Ready for Inspection HAMID PISHEHVAR
Footing/Foundation/Slab 12/29/2020 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 12/30/2020 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 1/5/2021 Approved HAMID PISHEHVAR
Green Building Rough 1/6/2021 Partial Approval HAMID PISHEHVAR
Reinforced Concrete Frame 1/6/2021 Partial Approval HAMID PISHEHVAR
Grading Pre-Inspection 1/7/2021 Not Ready for Inspection HAMID PISHEHVAR
Special/Order Compliance 1/12/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 1/13/2021 Approved HAMID PISHEHVAR
Deputy Steel/Welding 1/14/2021 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 1/14/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 1/19/2021 Partial Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 1/22/2021 Approved HAMID PISHEHVAR
Structural Steel Frame 1/22/2021 Partial Approval HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 2/3/2021 Approved HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 2/4/2021 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 2/16/2021 Partial Inspection JEFFREY FULTON
Grading Pre-Inspection 2/17/2021 No Access for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 2/18/2021 Approved DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 2/26/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 3/1/2021 Approved HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 3/5/2021 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 3/11/2021 Partial Inspection HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 3/12/2021 Partial Approval HAMID PISHEHVAR
Drywall Nailing 3/18/2021 Partial Approval HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 3/22/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 3/24/2021 Partial Approval HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 3/31/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 4/6/2021 Partial Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 4/9/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 4/13/2021 Partial Inspection JEFFREY FULTON
Masonry Wall/Backfill 4/13/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 4/19/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 4/20/2021 Approved HAMID PISHEHVAR
Light Gage Steel Frame 4/20/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 4/26/2021 Partial Inspection JEFFREY FULTON
Masonry Wall/Backfill 4/27/2021 Approved HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 4/30/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/3/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/15/2021 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/17/2021 Partial Approval HAMID PISHEHVAR
Excavation/Setback/Form/Re-Bar 5/21/2021 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/27/2021 Partial Approval DANIEL VARNUM
Insulation 5/27/2021 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 5/27/2021 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 5/27/2021 Partial Approval HAMID PISHEHVAR
Drywall Nailing 6/1/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 6/3/2021 Partial Approval HAMID PISHEHVAR
Drywall Nailing 6/8/2021 Partial Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 6/8/2021 Partial Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 6/9/2021 Partial Approval JEFFREY DURAN
Light Gage Steel Frame 6/11/2021 Partial Approval GRANT WOODS
Excavation/Setback/Form/Re-Bar 6/15/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 6/17/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 6/18/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 6/18/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 6/18/2021 Partial Inspection JEFFREY FULTON
Deputy Steel/Welding 6/21/2021 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 6/22/2021 Approved HAMID PISHEHVAR
Deputy Steel/Welding 6/22/2021 Conditional Approval JEFFREY DURAN
Insulation 6/22/2021 Approved HAMID PISHEHVAR
Light Gage Steel Frame 6/22/2021 Approved HAMID PISHEHVAR
Deputy Steel/Welding 6/23/2021 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 6/24/2021 Approved HAMID PISHEHVAR
Deputy Steel/Welding 6/25/2021 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 6/28/2021 Conditional Approval RICKEY JACKSON
Deputy Steel/Welding 6/29/2021 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 6/30/2021 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 7/1/2021 Conditional Approval DANIEL VARNUM
Drywall Nailing 7/1/2021 Partial Approval DANIEL VARNUM
Deputy Grading 7/2/2021 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 7/2/2021 Conditional Approval DANIEL VARNUM
Drywall Nailing 7/2/2021 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 7/2/2021 Partial Approval DANIEL VARNUM
Deputy Steel/Welding 7/7/2021 Conditional Approval JEFFREY DURAN
Insulation 7/7/2021 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 7/7/2021 Partial Approval DANIEL VARNUM
Deputy Steel/Welding 7/8/2021 Conditional Approval DANIEL VARNUM
Drywall Nailing 7/8/2021 Partial Inspection DANIEL VARNUM
Light Gage Steel Frame 7/8/2021 Partial Approval DANIEL VARNUM
Deputy Steel/Welding 7/9/2021 Conditional Approval KENNETH ROBERTS
Deputy Steel/Welding 7/12/2021 Conditional Approval JEFFREY DURAN
Drywall Nailing 7/12/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 7/12/2021 Not Ready for Inspection JEFFREY FULTON
Deputy Steel/Welding 7/13/2021 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 7/14/2021 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 7/15/2021 Conditional Approval JEFFREY FULTON
Drywall Nailing 7/15/2021 Partial Approval JEFFREY FULTON
Light Gage Steel Frame 7/15/2021 Partial Inspection JEFFREY FULTON
Deputy Steel/Welding 7/16/2021 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 7/20/2021 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 7/21/2021 Conditional Approval JEFFREY FULTON
Drywall Nailing 7/21/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 7/21/2021 Partial Inspection JEFFREY FULTON
Deputy Steel/Welding 7/22/2021 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 7/23/2021 Conditional Approval JEFFREY FULTON
Drywall Nailing 7/23/2021 Partial Inspection JEFFREY FULTON
Insulation 7/23/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 7/23/2021 Partial Inspection JEFFREY FULTON
Deputy Steel/Welding 7/27/2021 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 7/28/2021 Conditional Approval JEFFREY FULTON
Drywall Nailing 7/28/2021 Partial Inspection JEFFREY FULTON
Insulation 7/28/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 7/28/2021 Partial Inspection JEFFREY FULTON
Deputy Steel/Welding 7/29/2021 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 7/30/2021 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 8/2/2021 Conditional Approval JEFFREY FULTON
Drywall Nailing 8/2/2021 Partial Inspection JEFFREY FULTON
Insulation 8/2/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 8/2/2021 Partial Inspection JEFFREY FULTON
Deputy Steel/Welding 8/3/2021 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 8/4/2021 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 8/5/2021 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 8/6/2021 Conditional Approval JEFFREY FULTON
Drywall Nailing 8/6/2021 Partial Inspection JEFFREY FULTON
Insulation 8/6/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 8/6/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 8/10/2021 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 8/10/2021 Partial Approval CAMERON CHABAN
Insulation 8/10/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 8/10/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 8/12/2021 Partial Inspection JEFFREY FULTON
Insulation 8/12/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/12/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 8/13/2021 Partial Inspection JEFFREY FULTON
Insulation 8/13/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/13/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/16/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 8/18/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 8/18/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/18/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/19/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/21/2021 Partial Approval CAMERON CHABAN
Drywall Nailing 8/24/2021 Partial Inspection JEFFREY FULTON
Insulation 8/24/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/24/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 8/25/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/25/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 8/26/2021 Partial Inspection JEFFREY FULTON
Insulation 8/26/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 8/26/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/27/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 8/31/2021 Partial Inspection JEFFREY FULTON
Insulation 8/31/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 8/31/2021 Partial Inspection JEFFREY FULTON
Insulation 9/1/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 9/1/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 9/3/2021 Not Ready for Inspection JEFFREY FULTON
Insulation 9/3/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 9/3/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 9/7/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 9/7/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 9/8/2021 Partial Approval GRANT WOODS
Insulation 9/8/2021 Partial Approval GRANT WOODS
Light Gage Steel Frame 9/8/2021 Partial Approval GRANT WOODS
Drywall Nailing 9/10/2021 Partial Inspection JEFFREY FULTON
Insulation 9/10/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 9/10/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 9/14/2021 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/14/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/14/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 9/16/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 9/16/2021 Partial Inspection JEFFREY FULTON
Insulation 9/16/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 9/16/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 9/17/2021 Partial Approval GRANT WOODS
Insulation 9/17/2021 Partial Approval GRANT WOODS
Light Gage Steel Frame 9/17/2021 Partial Approval GRANT WOODS
Drywall Nailing 9/20/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 9/20/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 9/20/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 9/22/2021 Partial Approval KENNETH ROBERTS
Insulation 9/22/2021 Partial Approval KENNETH ROBERTS
Light Gage Steel Frame 9/22/2021 Partial Approval KENNETH ROBERTS
Deputy Fireproofing 9/23/2021 Conditional Approval ALAN NOVAK
Deputy Fireproofing 9/24/2021 Conditional Approval JEFFREY FULTON
Drywall Nailing 9/24/2021 Partial Inspection JEFFREY FULTON
Insulation 9/24/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 9/24/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 9/25/2021 Partial Approval JOHN KITCKO
Insulation 9/27/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 9/27/2021 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 9/28/2021 Partial Inspection JEFFREY FULTON
Insulation 9/28/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 9/28/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 9/29/2021 Partial Approval DANIEL VARNUM
Insulation 9/29/2021 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 9/29/2021 Partial Approval DANIEL VARNUM
Drywall Nailing 10/1/2021 Partial Approval DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 10/1/2021 Partial Approval DANIEL VARNUM
Insulation 10/1/2021 Partial Approval DANIEL VARNUM
Light Gage Steel Frame 10/1/2021 Partial Approval DANIEL VARNUM
Drywall Nailing 10/4/2021 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/4/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 10/5/2021 Partial Inspection ANDREW DORSO
Light Gage Steel Frame 10/5/2021 Partial Inspection ANDREW DORSO
Drywall Nailing 10/8/2021 Partial Approval GRANT WOODS
Insulation 10/8/2021 Partial Approval GRANT WOODS
Light Gage Steel Frame 10/8/2021 Partial Approval GRANT WOODS
T-Bar Ceiling 10/8/2021 Partial Approval GRANT WOODS
Drywall Nailing 10/12/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 10/12/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 10/12/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/13/2021 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 10/13/2021 Partial Inspection JEFFREY FULTON
Insulation 10/13/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 10/13/2021 Partial Inspection JEFFREY FULTON
Insulation 10/14/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 10/14/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/18/2021 Partial Approval ROBERT DAVIS
Insulation 10/18/2021 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 10/18/2021 Partial Approval ROBERT DAVIS
Drywall Nailing 10/19/2021 Partial Inspection JEFFREY FULTON
T-Bar Ceiling 10/19/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/20/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 10/20/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 10/20/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/22/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 10/22/2021 Partial Inspection JEFFREY FULTON
T-Bar Ceiling 10/22/2021 Partial Inspection JEFFREY FULTON
Insulation 10/25/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 10/25/2021 Partial Inspection JEFFREY FULTON
T-Bar Ceiling 10/25/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/28/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 10/28/2021 Not Ready for Inspection JEFFREY FULTON
T-Bar Ceiling 10/28/2021 Partial Inspection JEFFREY FULTON
Insulation 10/29/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 10/29/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 11/1/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 11/1/2021 Partial Inspection JEFFREY FULTON
T-Bar Ceiling 11/1/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 11/2/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 11/4/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 11/4/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 11/4/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 11/8/2021 Not Ready for Inspection JEFFREY FULTON
Insulation 11/8/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 11/8/2021 Not Ready for Inspection JEFFREY FULTON
Insulation 11/13/2021 Partial Approval JEFFREY DURAN
Light Gage Steel Frame 11/13/2021 Partial Approval JEFFREY DURAN
Drywall Nailing 11/15/2021 Not Ready for Inspection JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 11/15/2021 Partial Approval JONATHAN QUACH
Insulation 11/15/2021 Partial Approval JONATHAN QUACH
Light Gage Steel Frame 11/15/2021 No Access for Inspection DANIEL VARNUM
Light Gage Steel Frame 11/15/2021 Partial Approval JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 11/16/2021 Partial Approval DANIEL VARNUM
Insulation 11/16/2021 No Access for Inspection DANIEL VARNUM
Light Gage Steel Frame 11/16/2021 No Access for Inspection DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 11/17/2021 No Access for Inspection DANIEL VARNUM
Light Gage Steel Frame 11/17/2021 Partial Inspection DANIEL VARNUM
Excavation/Setback/Form/Re-Bar 11/18/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 11/18/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 11/19/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 11/19/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 11/22/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 11/22/2021 Partial Inspection JEFFREY FULTON
Insulation 11/22/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 11/22/2021 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 11/23/2021 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 11/23/2021 Partial Inspection JEFFREY FULTON
T-Bar Ceiling 11/23/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 11/30/2021 Off-Hour Fees Due
Drywall Nailing 12/1/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 12/1/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 12/1/2021 Partial Inspection JEFFREY FULTON
T-Bar Ceiling 12/1/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 12/2/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 12/3/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 12/3/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 12/8/2021 Partial Inspection JEFFREY FULTON
Structural Steel Frame 12/8/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 12/10/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 12/10/2021 Not Ready for Inspection JEFFREY FULTON
T-Bar Ceiling 12/10/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 12/14/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 12/14/2021 Partial Inspection JEFFREY FULTON
Drywall Nailing 12/16/2021 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 12/16/2021 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 12/18/2021 Partial Approval JOHN KITCKO
Light Gage Steel Frame 12/18/2021 Partial Approval JOHN KITCKO
Drywall Nailing 12/27/2021 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 12/27/2021 Partial Inspection JEFFREY FULTON
Special/Order Compliance 12/27/2021 No Access for Inspection JEFFREY FULTON
Light Gage Steel Frame 12/30/2021 Not Ready for Inspection CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 1/3/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/5/2022 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 1/5/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 1/5/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/7/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 1/7/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 1/10/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/12/2022 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 1/12/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 1/12/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/15/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 1/19/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 1/21/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 1/28/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 2/1/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 2/1/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 2/10/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 2/10/2022 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 2/14/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 2/14/2022 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 2/17/2022 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 2/22/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 2/28/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 3/7/2022 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 3/7/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 3/8/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 3/8/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 3/14/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 3/14/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 3/15/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 3/16/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 3/19/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 3/21/2022 Partial Approval DANIEL VARNUM
Deputy Grading 3/24/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 3/25/2022 Conditional Approval JEFFREY FULTON
Drywall Nailing 3/25/2022 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 3/25/2022 Not Ready for Inspection JEFFREY FULTON
Insulation 3/25/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 3/25/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 3/29/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 3/30/2022 Conditional Approval JEFFREY FULTON
Drywall Nailing 3/30/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 3/30/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 3/31/2022 Conditional Approval JEFFREY FULTON
Drywall Nailing 4/1/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 4/4/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 4/5/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 4/6/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 4/7/2022 Conditional Approval JEFFREY FULTON
Drywall Nailing 4/7/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 4/7/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 4/8/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 4/11/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 4/12/2022 Conditional Approval JEFFREY FULTON
Light Gage Steel Frame 4/12/2022 Corrections Issued JEFFREY FULTON
Deputy Grading 4/13/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 4/14/2022 Conditional Approval JEFFREY FULTON
Drywall Nailing 4/14/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 4/14/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 4/15/2022 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 4/15/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 4/15/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 4/18/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 4/19/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 4/20/2022 Conditional Approval JEFFREY FULTON
Drywall Nailing 4/20/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 4/20/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 4/21/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 4/22/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 4/25/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 4/26/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 4/27/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 4/28/2022 Conditional Approval KENNETH ROBERTS
Drywall Nailing 4/28/2022 Partial Approval KENNETH ROBERTS
Deputy Grading 4/29/2022 Conditional Approval JEFFREY FULTON
Special/Order Compliance 4/29/2022 Not Ready for Inspection JEFFREY FULTON
Deputy Grading 5/2/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 5/3/2022 Conditional Approval JEFFREY FULTON
Special/Order Compliance 5/3/2022 Corrections Issued JEFFREY FULTON
Deputy Grading 5/4/2022 Conditional Approval JEFFREY FULTON
Special/Order Compliance 5/4/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 5/5/2022 Conditional Approval JEFFREY FULTON
Final 5/5/2022 Corrections Issued JEFFREY FULTON
Light Gage Steel Frame 5/5/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 5/6/2022 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/6/2022 Partial Inspection JEFFREY FULTON
Final 5/6/2022 Partial Inspection JEFFREY FULTON
Special/Order Compliance 5/7/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 5/9/2022 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/9/2022 Not Ready for Inspection JEFFREY FULTON
Final 5/9/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 5/10/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 5/11/2022 Conditional Approval JEFFREY FULTON
Drywall Nailing 5/11/2022 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/11/2022 Partial Inspection JEFFREY FULTON
Final 5/11/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 5/11/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 5/12/2022 Conditional Approval JEFFREY FULTON
Final 5/12/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 5/13/2022 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 5/13/2022 Partial Inspection JEFFREY FULTON
Final 5/13/2022 Not Ready for Inspection JEFFREY FULTON
Final 5/16/2022 Partial Inspection JEFFREY FULTON
Final 5/17/2022 Partial Inspection JEFFREY FULTON
Special/Order Compliance 5/18/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 5/19/2022 Conditional Approval JEFFREY FULTON
Deputy Grading 5/20/2022 Conditional Approval JEFFREY FULTON
Final 5/20/2022 Not Ready for Inspection JEFFREY FULTON
Deputy Grading 5/23/2022 Conditional Approval JEFFREY FULTON
Final 5/23/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 5/24/2022 Conditional Approval JEFFREY FULTON
Final 5/24/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 5/25/2022 Conditional Approval JEFFREY FULTON
Final 5/25/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 5/26/2022 Conditional Approval JEFFREY FULTON
Special/Order Compliance 5/26/2022 Not Ready for Inspection JEFFREY FULTON
Deputy Grading 5/27/2022 Conditional Approval JEFFREY FULTON
Drywall Nailing 6/7/2022 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 6/8/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 6/15/2022 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 6/21/2022 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 6/25/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 7/1/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 7/7/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 7/12/2022 Approved JEFFREY FULTON
Final 7/12/2022 Not Ready for Inspection JEFFREY FULTON
Footing/Foundation/Slab 7/12/2022 Approved JEFFREY FULTON
Green Building Final 7/12/2022 Not Ready for Inspection JEFFREY FULTON
SGSOV-Seismic Gas S/O Valve 7/12/2022 SGSOV Not Ready JEFFREY FULTON
Smoke Detectors 7/12/2022 Not Ready for Inspection JEFFREY FULTON
Special/Order Compliance 7/12/2022 Approved JEFFREY FULTON
Structural Steel Frame 7/12/2022 Not Ready for Inspection JEFFREY FULTON
Interior/Exterior Lathing 7/14/2022 Partial Inspection JEFFREY FULTON
Deputy Grading 7/21/2022 Conditional Approval JEFFREY FULTON
Special/Order Compliance 10/26/2022 Not Ready for Inspection JEFFREY DURAN
Drywall Nailing 11/18/2022 Approved JEFFREY FULTON
Final 11/18/2022 Corrections Issued JEFFREY FULTON
Green Building Final 11/18/2022 Approved JEFFREY FULTON
Green Building Rough 11/18/2022 Approved JEFFREY FULTON
SGSOV-Seismic Gas S/O Valve 11/18/2022 SGSOV Approved JEFFREY FULTON
Smoke Detectors 11/18/2022 Approved JEFFREY FULTON
Structural Steel Frame 11/18/2022 Approved JEFFREY FULTON
Special/Order Compliance 11/21/2022 Partial Inspection JEFFREY FULTON
Final 3/9/2023 OK to Issue CofO JEFFREY FULTON
Reinforced Concrete Frame 3/9/2023 Approved JEFFREY FULTON