145 N EDINBURGH AVE 90048

Certificate Information: 145 N EDINBURGH AVE 90048

Application / Permit
19010-30000-06049
Plan Check / Job No.
B19WL07229
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
(N) 6-STORY MIXED USE PROJECT (56 units and 1-ADU, including 6 very ow income and 2 moderate income units) . 5-STORIES TYPE III-A OVER 1-STORY TYPE 1-A PODIUM AND 3-STORIES TYPE 1-A BASEMENT
Permit Issued
Issued on 5/9/2024
Issuing Office
Metro
Current Status
Issued on 5/9/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/23/2019 APPLICANT
Green Plans Picked Up 2/5/2020 APPLICANT
Assigned to Plan Check Engineer 2/6/2020 TARIK SAOUD
Corrections Issued 2/10/2020 TARIK SAOUD
Quality Review Completed 2/24/2020 FELIX FIGUEROA
Disabled Access Plans Picked Up 4/17/2020 APPLICANT
Applicant returned to address corrections 11/16/2020 TARIK SAOUD
Applicant returned to address corrections 2/9/2022 TARIK SAOUD
Applicant returned to address corrections 7/28/2022 TARIK SAOUD
Applicant returned to address corrections 10/12/2022 SERGIO SILVA
Building Plans Picked Up 10/13/2022 APPLICANT
Applicant returned to address corrections 9/25/2023 SERGIO SILVA
Applicant returned to address corrections 4/19/2024 SERGIO SILVA
Plan Check Approved 5/1/2024 SERGIO SILVA
Issued 5/9/2024 APPLICANT

Permit Application Clearance Information

Address approval Cleared 4/16/2020 ELAINE LEI
Eng Process Fee Ord 176,300 Cleared 5/7/2020 ELAINE LEI
Highway dedication Cleared 5/7/2020 ELAINE LEI
Sewer availability Cleared 5/7/2020 ELAINE LEI
Internal circulation Cleared 11/10/2020 MOHAMMAD HASAN
Trees in Parkway Cleared 12/30/2020 JOHN KIM
Hydrant and Access approval Cleared 1/19/2021 ROBERT DUFF
Low Impact Development Cleared 2/2/2021 JORGE MEJIA LEMUS
DAS Clearance Cleared 2/4/2021 TARIK SAOUD
Green Code Cleared 3/4/2021 RICHARD GARCIA
Fire Marshall Fire Life Safety Cleared 3/9/2021 VIDAL GARCIA
Methane Ordinance Cleared 3/10/2021 VIDAL GARCIA
Bicycle Parking Cleared 3/15/2021 ELAINE LEI
Roof/Waste drainage to street Cleared 3/16/2021 ELAINE LEI
Food Service Establishment Cleared 8/20/2021 RAMESHBHAIR PATEL
Construction near power lines Cleared 9/3/2022 RIDWAN HARDY
Building over 3-story or 36-ft Cleared 10/12/2022 CALOSHA APPROVED
Density Bonus 12.22.A.25 Cleared 10/12/2022 NICHOLAS KAWAZOE
Excavation more than 5-ft deep Cleared 10/12/2022 CALOSHA APPROVED
Food establishment approval Cleared 10/12/2022 LACDHS APPROVED
Miscellaneous Cleared 10/12/2022 TARIK SAOUD
CPC Cleared 12/29/2022 SPENCER WEJROWSKI
Opn space landscape/Water mgmt Cleared 12/29/2022 SPENCER WEJROWSKI
Site Plan review Cleared 12/29/2022 SPENCER WEJROWSKI
ZA Case Cleared 12/29/2022 SPENCER WEJROWSKI
ZA Case Cleared 12/29/2022 SPENCER WEJROWSKI
ZA Case Cleared 12/29/2022 SPENCER WEJROWSKI
Miscellaneous Cleared 9/25/2023 TARIK SAOUD
Work Adjacent to Public Way Cleared 4/10/2024 JOSE RODRIGUEZ
Permit Cleared 4/19/2024 ALBERT TAM

Contact Information

Architect Kil,, Andrew Han; Lic. No.: C31817 13005 MESA VERDE WAY      SYLMAR, CA 91342
Architect Tucker,, Timothy Alan; Lic. No.: C19103 16934 EASTWOOD AVENUE      TORRANCE, CA 90504
Contractor Ravello Construction; Lic. No.: 1068657-B 8322 BEVERLY BLVD STE 301      LOS ANGELES, CA 90048
Engineer De, Leon, Cynthia Aguilar; Lic. No.: C31604 347 ROBERTSON BLVD      BEVERLY HILLS, CA 90211
Engineer Dejban,, Masoud; Lic. No.: S2521 17200 VENTURA BLVD STE 213A      ENCINO, CA 91316
Engineer Haddad,, Raymond M; Lic. No.: GE2985 17106 CEREDO PL      GRANADA HILLS, CA 91344
Engineer Harris,, William Donald; Lic. No.: S5121 26344 DUNWOOD RD      ROLLING HILLS ESTATES, CA 90274
Engineer Kumar,, Krishna C V; Lic. No.: M22176 3877 DWIGGINS ST      LOS ANGELES, CA 90063
Engineer Mahmoudkhani,, Behnam; Lic. No.: C88488 1718 W PARKSIDE AVE      BURBANK, CA 91506
Engineer Nazemi,, Hassan Steve; Lic. No.: C44100 275 CENTENNIAL WAY 205      TUSTIN, CA 92780
Landscape Architect Kim,, Samuel Kyun; Lic. No.: LA3249 2669 SATURN ST      BREA, CA 92821

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/5/2024 Approved EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/7/2024 Partial Approval EDWIN GREGORYONA
Special/Order Compliance 5/7/2025 Approved EDWIN GREGORYONA
Deputy Reinf. Concrete 9/8/2025 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 9/8/2025 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Barrier 9/8/2025 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Subgrade 9/8/2025 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 9/10/2025 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 9/10/2025 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 9/10/2025 Partial Inspection EDWIN GREGORYONA
METHANE-Subgrade 9/10/2025 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 9/15/2025 Partial Approval EDWIN GREGORYONA
Green Building Rough 9/15/2025 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 9/15/2025 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 9/15/2025 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 9/15/2025 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 10/7/2025 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 10/7/2025 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 10/7/2025 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 10/7/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/8/2025 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 10/21/2025 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 10/21/2025 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Subgrade 10/21/2025 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 10/21/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/27/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 10/27/2025 Partial Approval EDWIN GREGORYONA
Green Building Rough 10/27/2025 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 10/27/2025 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 10/27/2025 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 10/27/2025 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Masonry 10/31/2025 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/31/2025 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 10/31/2025 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 10/31/2025 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Barrier 10/31/2025 Partial Approval EDWIN GREGORYONA
METHANE-Rough 10/31/2025 Partial Inspection EDWIN GREGORYONA
METHANE-Subgrade 10/31/2025 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 10/31/2025 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 10/31/2025 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 12/5/2025 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 12/5/2025 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 12/8/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/17/2025 Partial Approval EDWIN GREGORYONA
Green Building Rough 12/17/2025 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 12/17/2025 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 12/17/2025 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 12/17/2025 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 12/29/2025 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 12/30/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 12/30/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 1/5/2026 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 1/6/2026 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 1/6/2026 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 1/6/2026 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 1/8/2026 Partial Approval EDWIN GREGORYONA
Green Building Rough 1/13/2026 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 1/13/2026 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 1/13/2026 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/13/2026 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 2/2/2026 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 2/2/2026 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Concrete 2/5/2026 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 2/6/2026 Partial Approval MARTIN TAVITIAN
Footing/Foundation/Slab 2/9/2026 Partial Approval MARTIN TAVITIAN
METHANE-Barrier 2/9/2026 Not Ready for Inspection MARTIN TAVITIAN
METHANE-Subgrade 2/9/2026 Not Ready for Inspection MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 2/20/2026 Partial Approval MARTIN TAVITIAN
Footing/Foundation/Slab 2/23/2026 Partial Approval MARTIN TAVITIAN
METHANE-Barrier 2/23/2026 Not Ready for Inspection MARTIN TAVITIAN
METHANE-Subgrade 2/23/2026 Not Ready for Inspection MARTIN TAVITIAN
Deputy Reinf. Concrete 3/2/2026 Partial Approval CHRISTOPHER BLACKWOOD
Deputy Shotcrete 3/2/2026 Partial Approval CHRISTOPHER BLACKWOOD
Excavation/Setback/Form/Re-Bar 3/3/2026 Partial Approval MARTIN TAVITIAN
Green Building Rough 3/10/2026 Not Ready for Inspection MARTIN TAVITIAN
METHANE-Rough 3/10/2026 Approved MARTIN TAVITIAN
Reinforced Masonry Frame 3/10/2026 Partial Approval MARTIN TAVITIAN
Verify Sprinkler Sign Off 3/10/2026 Not Ready for Inspection MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 3/31/2026 Not Ready for Inspection MARTIN TAVITIAN
Deputy Reinf. Concrete 4/8/2026 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 4/8/2026 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Concrete 4/14/2026 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 4/14/2026 Partial Approval MARTIN TAVITIAN
Pre-Inspection 4/14/2026 Approved MARTIN TAVITIAN
Deputy Reinf. Concrete 4/20/2026 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 4/24/2026 Not Ready for Inspection CHRISTOPHER BLACKWOOD
Deputy Reinf. Concrete 4/27/2026 Partial Approval MARTIN TAVITIAN
Footing/Foundation/Slab 4/27/2026 Partial Approval MARTIN TAVITIAN
METHANE-Barrier 4/27/2026 Approved MARTIN TAVITIAN
METHANE-Subgrade 4/27/2026 Approved MARTIN TAVITIAN
Deputy Reinf. Concrete 4/28/2026 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 5/8/2026 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Masonry 5/26/2026 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Masonry 5/28/2026 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 5/28/2026 Partial Approval MARTIN TAVITIAN
Green Building Rough 5/29/2026 Partial Approval MARTIN TAVITIAN
Reinforced Masonry Frame 5/29/2026 Partial Approval MARTIN TAVITIAN
Verify Sprinkler Sign Off 5/29/2026 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Concrete 6/3/2026 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Masonry 6/5/2026 No Result Entered MARTIN TAVITIAN
Green Building Rough 6/5/2026 No Result Entered MARTIN TAVITIAN
Reinforced Masonry Frame 6/5/2026 No Result Entered MARTIN TAVITIAN
Verify Sprinkler Sign Off 6/5/2026 No Result Entered MARTIN TAVITIAN