4210 N BELLAIRE AVE 91604

Certificate Information: 4210 N BELLAIRE AVE 91604

Application / Permit
19010-30000-05676
Plan Check / Job No.
B19WL06973
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(N) 2-story single family dwelling w/attached garage.Equipped with fire sprinkler system NFPA-13R.
Permit Issued
Issued on 3/11/2020
Issuing Office
West Los Angeles
Current Status
CofO Corrected on 8/30/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/13/2019 APPLICANT
Assigned to Plan Check Engineer 12/31/2019 ALFREDO JARA
Corrections Issued 1/8/2020 ALFREDO JARA
Quality Review Completed 1/16/2020 KAMRAN GHOTBI RAVANDI
Building Plans Picked Up 1/17/2020 APPLICANT
Green Plans Picked Up 1/17/2020 APPLICANT
Plan Check Approved 3/2/2020 ALFREDO JARA
Issued 3/11/2020 LADBS
CofO in Progress 7/14/2022 CHRISTOPHE COCHRAN
CofO Issued-Status Void 8/10/2022 DANIEL ORRANTE
Permit Finaled-Status Void 8/10/2022 DANIEL ORRANTE
Re-Activate Permit 8/27/2022 MICHAEL SMITH
CofO Corrected 8/30/2022 MICHAEL SMITH
Permit Finaled 8/30/2022 MICHAEL SMITH

Permit Application Clearance Information

CPC Cleared 1/17/2020 NOAH MCCOY
CPC Cleared 1/17/2020 NOAH MCCOY
Eng Process Fee Ord 176,300 Cleared 1/17/2020 JOSE CRUZ RODRIGUEZ
Sewer availability Cleared 1/17/2020 JOSE CRUZ RODRIGUEZ
Green Code Cleared 2/13/2020 DONALD CRICHLOW
Low Impact Development Cleared 2/26/2020 ANDRES COVARRUBIAS
Hydrant and Access approval Cleared 2/27/2020 GEORGE SUCHAND
Permit Cleared 2/27/2020 CATHERINE ADROVER
Roof/Waste drainage to street Cleared 2/27/2020 CATHERINE ADROVER
Trees in Parkway Cleared 2/27/2020 JOHN KIM
ZI Cleared 2/27/2020 NOAH MCCOY

Contact Information

Architect Tighe,, Patrick J; Lic. No.: C27987 5747 VENICE BLVD      LOS ANGELES, CA 90019
Contractor Owner-Builder       ,
Engineer Vidikan,, Andrew S; Lic. No.: C35623 9701 W PICO BLVD STE 217      LOS ANGELES, CA 90035

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 5/14/2020 Conditional Approval THOMAS FINNILA
Footing/Foundation/Slab 5/14/2020 Conditional Approval THOMAS FINNILA
PLUMBING-Rough 5/14/2020 Partial Approval THOMAS FINNILA
Footing/Foundation/Slab 5/26/2020 Approved ARAM AVEDISIAN
Deputy Reinf. Concrete 5/28/2020 Conditional Approval ARAM AVEDISIAN
Wood Frame 6/12/2020 Partial Approval ARAM AVEDISIAN
Gas Test 8/12/2020 Partial Approval ARAM AVEDISIAN
PLUMBING-Rough 8/12/2020 Approved ARAM AVEDISIAN
HVAC-Rough 9/1/2020 Approved ARAM AVEDISIAN
Floor/Roof Diaphrgm/Shear Wall 9/4/2020 Approved ARAM AVEDISIAN
ELECTRICAL-Rough 9/15/2020 Approved ARAM AVEDISIAN
BUILDING-Rough-Frame 9/21/2020 Approved ARAM AVEDISIAN
Green Building Rough 9/21/2020 Approved ARAM AVEDISIAN
Verify Sprinkler Sign Off 9/21/2020 Approved ARAM AVEDISIAN
Insulation 10/9/2020 Approved DANIEL ORRANTE
Drywall Nailing 10/21/2020 Approved ARAM AVEDISIAN
Shower Pan 11/19/2020 Approved ARAM AVEDISIAN
Interior/Exterior Lathing 12/2/2020 Approved ARAM AVEDISIAN
ELECTRICAL-Final 6/16/2022 Not Ready for Inspection CHRISTOPHE COCHRAN
Gas Test 6/16/2022 Approved CHRISTOPHE COCHRAN
PLUMBING-Final 6/16/2022 Approved CHRISTOPHE COCHRAN
ELECTRICAL-Final 7/11/2022 Not Ready for Inspection JACK KARGODORIAN
Final 7/11/2022 Not Ready for Inspection JACK KARGODORIAN
Green Building Final 7/11/2022 Approved JACK KARGODORIAN
HVAC-Final 7/11/2022 Approved JACK KARGODORIAN
SGSOV-Seismic Gas S/O Valve 7/11/2022 SGSOV Approved JACK KARGODORIAN
Service/Power Release 7/11/2022 Not Ready for Inspection JACK KARGODORIAN
Smoke Detectors 7/11/2022 Approved JACK KARGODORIAN
Final 7/14/2022 OK to Issue CofO CHRISTOPHE COCHRAN
Grounding or Bonding 7/14/2022 Approved CHRISTOPHE COCHRAN
Service/Power Release 7/14/2022 Approved CHRISTOPHE COCHRAN
Verify Rec and Parks Fee Memo 7/14/2022 Approved CHRISTOPHE COCHRAN
Pre-Inspection 7/25/2022 Approved CHRISTOPHE COCHRAN