|
Excavation/Setback/Form/Re-Bar
|
4/16/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
4/16/2021
|
Approved
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
5/26/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
5/28/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/18/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
6/22/2021
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
6/22/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
6/23/2021
|
Approved
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
7/12/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Reinforced Concrete Frame
|
7/12/2021
|
Partial Inspection
|
JONATHAN QUACH
|
|
Verify Sprinkler Sign Off
|
7/12/2021
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Masonry Wall/Backfill
|
7/13/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
7/15/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
8/11/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
8/11/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
8/23/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
8/23/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
8/24/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
8/24/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
8/30/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
9/3/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
9/3/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
9/23/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
9/24/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
9/24/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
10/5/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
10/6/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
10/13/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Reinforced Masonry Frame
|
10/14/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Concrete
|
10/19/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
10/19/2021
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
10/19/2021
|
Partial Inspection
|
DANIEL MC AULIFFE
|
|
Footing/Foundation/Slab
|
10/20/2021
|
Partial Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
10/21/2021
|
Conditional Approval
|
DANIEL MC AULIFFE
|
|
Deputy Reinf. Concrete
|
10/27/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
10/28/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
10/29/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
11/3/2021
|
Approved
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
11/3/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Piling/Pier/Caisson
|
11/4/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
11/12/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
11/15/2021
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
11/30/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
12/3/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
12/6/2021
|
Partial Approval
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
12/17/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
12/17/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
12/17/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
12/18/2021
|
Off-Hour Fees Due
|
|
|
Masonry Wall/Backfill
|
12/18/2021
|
Partial Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
1/7/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
1/13/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
1/13/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
1/28/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
1/28/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
3/4/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
3/17/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
3/17/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Verify Sprinkler Sign Off
|
3/17/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
3/30/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
3/30/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
3/30/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
4/2/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
4/2/2022
|
Not Ready for Inspection
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
4/5/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
4/5/2022
|
Off-Hour Fees Due
|
|
|
Reinforced Masonry Frame
|
4/5/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
4/8/2022
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Final
|
4/8/2022
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Concrete Frame
|
4/8/2022
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
SGSOV-Seismic Gas S/O Valve
|
4/8/2022
|
SGSOV Not Ready
|
DANIEL MC AULIFFE
|
|
Smoke Detectors
|
4/8/2022
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Verify Sprinkler Sign Off
|
4/8/2022
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Wood Frame
|
4/8/2022
|
Not Ready for Inspection
|
DANIEL MC AULIFFE
|
|
Reinforced Masonry Frame
|
4/11/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
4/12/2022
|
Approved
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
4/13/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
4/29/2022
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
5/9/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
5/9/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
5/11/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
8/18/2022
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/21/2022
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
10/3/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
10/3/2022
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
10/7/2022
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
10/13/2022
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Masonry Wall/Backfill
|
10/14/2022
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
10/21/2022
|
Off-Hour Fees Due
|
|
|
Masonry Wall/Backfill
|
10/21/2022
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/24/2022
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
10/24/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
10/24/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
10/24/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
10/24/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
10/25/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/28/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
11/3/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
1/3/2023
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
1/19/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/8/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
4/10/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
4/10/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/17/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/20/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
4/25/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
4/25/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
4/25/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
4/28/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/28/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/3/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
5/10/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/22/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/26/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/31/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
6/5/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
6/5/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/7/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
6/21/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
6/21/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
6/21/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
6/29/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
7/10/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
7/10/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
7/13/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
7/19/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Verify Sprinkler Sign Off
|
7/19/2023
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Wood Frame
|
7/19/2023
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/8/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
8/8/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
8/18/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/18/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
10/11/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
10/13/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
10/13/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
10/30/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
11/16/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
11/21/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
11/21/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
1/12/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
1/31/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
1/31/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
2/29/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
2/29/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
2/5/2025
|
Approved
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
2/26/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
2/26/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
3/4/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
3/4/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
3/11/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
3/13/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
3/14/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
4/3/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
4/7/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
4/14/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
4/14/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
4/21/2025
|
Approved
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/12/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
5/27/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
6/3/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
6/11/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
6/11/2025
|
Approved
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
6/25/2025
|
Approved
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
7/15/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
7/17/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
7/22/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
7/31/2025
|
Approved
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
8/22/2025
|
Partial Approval
|
JAMES POWERS
|
|
Pre-Inspection
|
8/29/2025
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Pre-Inspection
|
9/4/2025
|
Approved
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
10/24/2025
|
Approved
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
11/18/2025
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
12/15/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
12/17/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
12/19/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
12/22/2025
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
12/22/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
12/24/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
12/26/2025
|
Approved
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
6/2/2026
|
Approved
|
DAVID BURKHEAD
|