New 6-story above grade multi-family building w/ 49 residential dwelling units, ground level and roof top amenity space and a retail space on ground floor. all over one level of subterranean parking.
Permit Issued
Issued on 4/14/2021
Issuing Office
Current Status
Issued on 4/14/2021
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 10/17/2019 APPLICANT
Assigned to Plan Check Engineer 10/31/2019 KAMRAN GHOTBI RAVANDI
Corrections Issued 11/5/2019 KAMRAN GHOTBI RAVANDI
Quality Review Completed 11/5/2019 FELIX FIGUEROA
Building Plans Picked Up 11/5/2019 APPLICANT
Applicant returned to address corrections 12/4/2019 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 2/7/2020 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 7/1/2020 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 7/9/2020 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 9/17/2020 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 9/23/2020 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 11/2/2020 KAMRAN GHOTBI RAVANDI
Plan Check Approved 4/6/2021 KAMRAN GHOTBI RAVANDI
Issued 4/14/2021 APPLICANT
TCO Issued (Expire Date: 06-28-2026) 12/30/2025 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 1/24/2020 CELINA MORENO
ZI Cleared 1/24/2020 RICHARD REASER
Construction near power lines Cleared 3/13/2020 RIDWAN HARDY
Construction within easement Cleared 3/13/2020 RIDWAN HARDY
Eng Process Fee Ord 176,300 Cleared 5/27/2020 CECILIO NAVARRO
Opn space landscape/Water mgmt Cleared 7/9/2020 ANNA VIDAL
Trees in Parkway Cleared 7/21/2020 JOHN KIM
Hydrant and Access approval Cleared 7/30/2020 KURT CORRAL
Highway dedication Cleared 9/4/2020 CECILIO NAVARRO
Building over 3-story or 36-ft Cleared 9/23/2020 CALOSHA APPROVED
Density Bonus 12.22.A.31 Cleared 10/21/2020 NICHOLAS KAWAZOE
Fire Marshall Fire Life Safety Cleared 11/12/2020 VIDAL GARCIA
Project located in CRA area Cleared 11/18/2020 NOAH MCCOY
Low Impact Development Cleared 11/25/2020 AMMAR ELTAWIL
DAS Clearance Cleared 12/3/2020 KAMRAN GHOTBI RAVANDI
Driveway location Cleared 1/14/2021 TAIMOUR TANAVOLI
Internal circulation Cleared 1/14/2021 TAIMOUR TANAVOLI
Green Code Cleared 1/20/2021 KAMRAN GHOTBI RAVANDI
Work Adjacent to Public Way Cleared 1/25/2021 BOK GOH
Roof/Waste drainage to street Cleared 2/1/2021 ELAINE LEI
Sewer availability Cleared 2/17/2021 CECILIO NAVARRO
Permit Cleared 3/3/2021 ARMEN MEHRABIAN
Excavation more than 5-ft deep Cleared 4/6/2021 CALOSHA APPROVED

Contact Information

Contractor Angeles Contractor Inc; Lic. No.: 858483-B 783 PHILLIPS DRIVE      CITY OF INDUSTRY, CA 91748
Engineer Hill,, Edward Foster; Lic. No.: GE2126 27865 AMBERWOOD LANE      VALENCIA, CA 91354
Engineer Lenahan,, Nolan George; Lic. No.: C77631 1050 20TH STREET STE 250      SACRAMENTO, CA 95811

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 4/16/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 4/16/2021 Approved DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/26/2021 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 5/28/2021 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/18/2021 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 6/22/2021 Corrections Issued DAVID BURKHEAD
Verify Sprinkler Sign Off 6/22/2021 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 6/23/2021 Approved DAVID BURKHEAD
Footing/Foundation/Slab 7/12/2021 Partial Approval JONATHAN QUACH
Reinforced Concrete Frame 7/12/2021 Partial Inspection JONATHAN QUACH
Verify Sprinkler Sign Off 7/12/2021 Not Ready for Inspection JONATHAN QUACH
Masonry Wall/Backfill 7/13/2021 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/15/2021 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 8/11/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 8/11/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/23/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 8/23/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 8/24/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 8/24/2021 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 8/30/2021 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 9/3/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 9/3/2021 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 9/23/2021 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 9/24/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 9/24/2021 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 10/5/2021 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 10/6/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/13/2021 Partial Approval JONATHAN QUACH
Reinforced Masonry Frame 10/14/2021 Partial Approval JONATHAN QUACH
Deputy Reinf. Concrete 10/19/2021 Conditional Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 10/19/2021 Not Ready for Inspection DANIEL MC AULIFFE
Verify Sprinkler Sign Off 10/19/2021 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 10/20/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/27/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/28/2021 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 10/29/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/3/2021 Approved DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/3/2021 Partial Approval DAVID BURKHEAD
Piling/Pier/Caisson 11/4/2021 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 11/12/2021 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/15/2021 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 11/30/2021 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/3/2021 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 12/6/2021 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 12/17/2021 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 12/17/2021 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 12/17/2021 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 12/18/2021 Off-Hour Fees Due
Masonry Wall/Backfill 12/18/2021 Partial Approval NICK DANERI
Masonry Wall/Backfill 1/7/2022 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/13/2022 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 1/13/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 1/28/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 1/28/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 3/4/2022 Conditional Approval DAVID BURKHEAD
Pre-Inspection 3/17/2022 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 3/17/2022 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/17/2022 Not Ready for Inspection EDWIN GREGORYONA
Pre-Inspection 3/30/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 3/30/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 3/30/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 4/2/2022 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 4/2/2022 Not Ready for Inspection NICK DANERI
Footing/Foundation/Slab 4/5/2022 Not Ready for Inspection DAVID BURKHEAD
Insulation 4/5/2022 Off-Hour Fees Due
Reinforced Masonry Frame 4/5/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 4/8/2022 Not Ready for Inspection DANIEL MC AULIFFE
Final 4/8/2022 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 4/8/2022 Not Ready for Inspection DANIEL MC AULIFFE
SGSOV-Seismic Gas S/O Valve 4/8/2022 SGSOV Not Ready DANIEL MC AULIFFE
Smoke Detectors 4/8/2022 Not Ready for Inspection DANIEL MC AULIFFE
Verify Sprinkler Sign Off 4/8/2022 Not Ready for Inspection DANIEL MC AULIFFE
Wood Frame 4/8/2022 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Masonry Frame 4/11/2022 Partial Approval DAVID BURKHEAD
Pre-Inspection 4/12/2022 Approved DAVID BURKHEAD
Deputy Reinf. Concrete 4/13/2022 Conditional Approval DAVID BURKHEAD
Special/Order Compliance 4/29/2022 Approved DAVID BURKHEAD
Reinforced Concrete Frame 5/9/2022 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 5/9/2022 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 5/11/2022 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/18/2022 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 9/21/2022 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 10/3/2022 Conditional Approval DAVID BURKHEAD
Special/Order Compliance 10/3/2022 Corrections Issued DAVID BURKHEAD
Deputy Reinf. Masonry 10/7/2022 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Masonry Wall/Backfill 10/14/2022 Corrections Issued DAVID BURKHEAD
Masonry Wall/Backfill 10/21/2022 Off-Hour Fees Due
Masonry Wall/Backfill 10/21/2022 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 10/24/2022 Partial Inspection DAVID BURKHEAD
Masonry Wall/Backfill 10/24/2022 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 10/24/2022 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 10/24/2022 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 10/24/2022 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 10/25/2022 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 10/28/2022 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 11/3/2022 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 1/3/2023 Corrections Issued DAVID BURKHEAD
Deputy Wood Construction 1/19/2023 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 2/8/2023 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 4/10/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 4/10/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/17/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/20/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 4/25/2023 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 4/25/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 4/25/2023 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 4/28/2023 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 4/28/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 5/3/2023 Partial Approval GREGORY POMISH
Drywall Nailing 5/10/2023 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 5/22/2023 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 5/26/2023 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 5/31/2023 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 6/5/2023 Not Ready for Inspection GREGORY POMISH
Wood Frame 6/5/2023 Not Ready for Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 6/7/2023 Partial Inspection DAVID BURKHEAD
Insulation 6/21/2023 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 6/21/2023 Partial Inspection GREGORY POMISH
Wood Frame 6/21/2023 Partial Approval GREGORY POMISH
Insulation 6/29/2023 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 7/10/2023 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 7/10/2023 Partial Approval DAVID BURKHEAD
Insulation 7/13/2023 Partial Approval DAVID BURKHEAD
Insulation 7/19/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 7/19/2023 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 7/19/2023 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/8/2023 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 8/8/2023 Not Ready for Inspection DAVID BURKHEAD
Masonry Wall/Backfill 8/18/2023 Not Ready for Inspection GREGORY POMISH
Drywall Nailing 9/18/2023 Partial Approval DAVID BURKHEAD
Drywall Nailing 10/11/2023 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 10/13/2023 Not Ready for Inspection GREGORY POMISH
Wood Frame 10/13/2023 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 10/30/2023 Partial Inspection DAVID BURKHEAD
Deputy Steel/Welding 11/16/2023 Conditional Approval DAVID BURKHEAD
Drywall Nailing 11/21/2023 Partial Inspection GREGORY POMISH
Insulation 11/21/2023 Partial Inspection GREGORY POMISH
Footing/Foundation/Slab 1/12/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 1/31/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 1/31/2024 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 2/29/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 2/29/2024 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 2/5/2025 Approved DAVID BURKHEAD
Verify Sprinkler Sign Off 2/26/2025 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 2/26/2025 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 3/4/2025 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 3/4/2025 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 3/11/2025 Partial Approval DAVID BURKHEAD
Pre-Inspection 3/13/2025 Partial Approval DAVID BURKHEAD
Drywall Nailing 3/14/2025 Partial Approval EDWIN GREGORYONA
Pre-Inspection 4/3/2025 Partial Inspection DAVID BURKHEAD
Pre-Inspection 4/7/2025 Partial Approval DAVID BURKHEAD
Drywall Nailing 4/14/2025 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 4/14/2025 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 4/21/2025 Approved DAVID BURKHEAD
Light Gage Steel Frame 5/12/2025 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 5/27/2025 Partial Inspection JEFFREY FULTON
Insulation 6/3/2025 Partial Approval DAVID BURKHEAD
Drywall Nailing 6/11/2025 Partial Approval DAVID BURKHEAD
Pre-Inspection 6/11/2025 Approved DAVID BURKHEAD
Pre-Inspection 6/25/2025 Approved DAVID BURKHEAD
Light Gage Steel Frame 7/15/2025 Partial Approval DAVID BURKHEAD
Insulation 7/17/2025 Partial Approval DAVID BURKHEAD
Drywall Nailing 7/22/2025 Partial Approval DAVID BURKHEAD
Pre-Inspection 7/31/2025 Approved DAVID BURKHEAD
Footing/Foundation/Slab 8/22/2025 Partial Approval JAMES POWERS
Pre-Inspection 8/29/2025 Partial Inspection SORIN CIRSTOIU
Pre-Inspection 9/4/2025 Approved DAVID BURKHEAD
Pre-Inspection 10/24/2025 Approved DAVID BURKHEAD
Pre-Inspection 11/18/2025 Approved DAVID BURKHEAD
Special/Order Compliance 12/15/2025 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 12/17/2025 Partial Inspection DAVID BURKHEAD
Special/Order Compliance 12/19/2025 Partial Inspection DAVID BURKHEAD
Pre-Inspection 12/22/2025 Approved DAVID BURKHEAD
Special/Order Compliance 12/22/2025 Partial Inspection DAVID BURKHEAD
Pre-Inspection 12/24/2025 Partial Inspection DAVID BURKHEAD
Pre-Inspection 12/26/2025 Approved DAVID BURKHEAD
Special/Order Compliance 6/2/2026 Approved DAVID BURKHEAD