7400 S KENTWOOD AVE 90045

Certificate Information: 7400 S KENTWOOD AVE 90045

Application / Permit
19010-30000-03950
Plan Check / Job No.
B19WL05000
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
New 2-story s.f.d. with attached 2-car garage
Permit Issued
Issued on 11/2/2021
Issuing Office
Current Status
Issued on 11/2/2021
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 9/4/2019 APPLICANT
Assigned to Plan Check Engineer 9/18/2019 REZA HAGHIGHAT
Corrections Issued 9/23/2019 REZA HAGHIGHAT
Quality Review Completed 10/4/2019 KAMRAN GHOTBI RAVANDI
Building Plans Picked Up 10/7/2019 APPLICANT
Green Plans Picked Up 10/7/2019 APPLICANT
Applicant returned to address corrections 2/18/2020 REZA HAGHIGHAT
Plan Check Approved 3/6/2020 REZA HAGHIGHAT
Issued 11/2/2021 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 12/18/2019 THOMAS LANG
Hydrant and Access approval Cleared 12/18/2019 GEORGE SUCHAND
Permit Cleared 12/18/2019 THOMAS LANG
Sewer availability Cleared 12/18/2019 THOMAS LANG
GPI Written Notices Cleared 2/18/2020 REZA HAGHIGHAT
Grading Pre-Inspection Cleared 2/18/2020 REZA HAGHIGHAT
Low Impact Development Cleared 2/24/2020 ORVAL HERNANDEZ-MARCIAL
Roof/Waste drainage to street Cleared 2/24/2020 EMIL KYUPELYAN
Green Code Cleared 3/4/2020 DONALD CRICHLOW

Contact Information

Architect Crockett,, Cameron; Lic. No.: C31503 1327 LOMA AVENUE      LONG BEACH, CA 90804
Contractor Erla Construction; Lic. No.: 1046950-B 2324 MICHIGAN AVE      SANTA MONICA, CA 90404
Engineer Choi,, David; Lic. No.: S4784 1327 LOMA AVENUE      LONG BEACH, CA 90804

Inspector Information

MORRIS JACKSON, (310) 914-3885 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/8/2023 Corrections Issued HERBERT GIRON
Excavation/Setback/Form/Re-Bar 10/30/2023 Partial Approval BOBBY KEY
METHANE-Barrier 10/30/2023 Not Ready for Inspection BOBBY KEY
METHANE-Subgrade 10/30/2023 Not Ready for Inspection BOBBY KEY
PLUMBING-Rough 10/30/2023 Corrections Issued BOBBY KEY
PLUMBING-Rough 11/3/2023 Approved BOBBY KEY
METHANE-Subgrade 11/15/2023 Corrections Issued HERBERT GIRON
METHANE-Subgrade 11/28/2023 Corrections Issued TEMISTOCLES CAAL
METHANE-Subgrade 12/4/2023 Approved TEMISTOCLES CAAL
Footing/Foundation/Slab 12/12/2023 Partial Inspection TEMISTOCLES CAAL
METHANE-Barrier 12/12/2023 Partial Inspection TEMISTOCLES CAAL
Footing/Foundation/Slab 1/17/2024 Off-Hour Fees Due
Footing/Foundation/Slab 1/17/2024 Partial Approval TEMISTOCLES CAAL
METHANE-Barrier 1/17/2024 Off-Hour Fees Due
Deputy Reinf. Concrete 1/29/2024 Conditional Approval RICHARD STEINBACH
Footing/Foundation/Slab 2/12/2024 Corrections Issued TEMISTOCLES CAAL
Excavation/Setback/Form/Re-Bar 2/15/2024 Corrections Issued TEMISTOCLES CAAL
Deputy Drilled-In Anchors 2/20/2024 Conditional Approval TEMISTOCLES CAAL
PLUMBING-Rough 4/17/2024 Corrections Issued TEMISTOCLES CAAL
Deputy Methane Barrier 5/1/2024 Conditional Approval TEMISTOCLES CAAL
PLUMBING-Rough 5/13/2024 Partial Approval BOBBY KEY
METHANE-Barrier 5/20/2024 Partial Inspection TEMISTOCLES CAAL
Pre-Inspection 5/20/2024 Partial Inspection TEMISTOCLES CAAL
Footing/Foundation/Slab 7/16/2024 Conditional Approval JESUS RODRIGUEZ
METHANE-Barrier 7/16/2024 Approved JESUS RODRIGUEZ
Footing/Foundation/Slab 7/17/2024 Approved JESUS RODRIGUEZ
METHANE-Barrier 7/17/2024 Approved JESUS RODRIGUEZ
Sewer 8/27/2024 Approved TEMISTOCLES CAAL
Deputy Drilled-In Anchors 6/24/2025 Conditional Approval DAVID FEILER
Floor/Roof Diaphrgm/Shear Wall 9/25/2025 Corrections Issued RUBEN RIVAS
Light Gage Steel Frame 9/25/2025 Corrections Issued RUBEN RIVAS
Structural Steel Frame 9/25/2025 Corrections Issued RUBEN RIVAS
ELECTRICAL-Rough 10/9/2025 Corrections Issued RUBEN RIVAS
Floor/Roof Diaphrgm/Shear Wall 10/9/2025 Corrections Issued RUBEN RIVAS
Light Gage Steel Frame 10/9/2025 Corrections Issued RUBEN RIVAS
Structural Steel Frame 10/9/2025 Corrections Issued RUBEN RIVAS
BUILDING-Rough-Frame 10/17/2025 Corrections Issued RUBEN RIVAS
Green Building Rough 10/17/2025 Not Ready for Inspection RUBEN RIVAS
METHANE-Rough 10/17/2025 Not Ready for Inspection RUBEN RIVAS
Structural Steel Frame 10/17/2025 Approved RUBEN RIVAS
Verify Sprinkler Sign Off 10/17/2025 Not Ready for Inspection RUBEN RIVAS
PLUMBING-Rough 12/15/2025 Approved ANTHONY EGSON
ELECTRICAL-Rough 5/18/2026 Corrections Issued MORRIS JACKSON
HVAC-Rough 5/18/2026 Approved MORRIS JACKSON
Deck 6/2/2026 Not Ready for Inspection MORRIS JACKSON
ELECTRICAL-Rough 6/2/2026 Not Ready for Inspection MORRIS JACKSON
Floor/Roof Diaphrgm/Shear Wall 6/2/2026 Not Ready for Inspection MORRIS JACKSON
Deck 6/10/2026 Approved MORRIS JACKSON
ELECTRICAL-Rough 6/10/2026 Approved MORRIS JACKSON
Floor/Roof Diaphrgm/Shear Wall 6/10/2026 Not Ready for Inspection MORRIS JACKSON
METHANE-Final 6/10/2026 Not Ready for Inspection MORRIS JACKSON
BUILDING-Rough-Frame 7/10/2026 No Access for Inspection MORRIS JACKSON
Floor/Roof Diaphrgm/Shear Wall 7/10/2026 Partial Approval MORRIS JACKSON
Green Building Rough 7/10/2026 Not Ready for Inspection MORRIS JACKSON
Insulation 7/10/2026 Not Ready for Inspection MORRIS JACKSON
Verify Sprinkler Sign Off 7/10/2026 Approved MORRIS JACKSON