1963 N STRADELLA ROAD 90077

Certificate Information: 1963 N STRADELLA ROAD 90077

Application / Permit
19010-30000-01282
Plan Check / Job No.
B19WL01680
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(N) S.F.D. WITH BASEMENT AND ATTACHED GARAGE.
Permit Issued
Issued on 8/4/2020
Issuing Office
West Los Angeles
Current Status
CofO Issued on 10/7/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/28/2019 APPLICANT
Assigned to Plan Check Engineer 4/11/2019 KAMRAN GHOTBI RAVANDI
Corrections Issued 4/15/2019 KAMRAN GHOTBI RAVANDI
Quality Review Completed 4/17/2019 CORA JOHNSON
Green Plans Picked Up 4/30/2019 APPLICANT
Applicant returned to address corrections 5/30/2019 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 6/20/2019 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 8/19/2019 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 10/4/2019 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 5/7/2020 KAMRAN GHOTBI RAVANDI
Plan Check Approved 5/28/2020 KAMRAN GHOTBI RAVANDI
Issued 8/4/2020 APPLICANT
Building Plans Picked Up 8/7/2020 APPLICANT
CofO in Progress 10/1/2025 CHRISTOPHER WILSON
Permit Finaled 10/7/2025 RICHARD STEINBACH
CofO Issued 10/7/2025 RICHARD STEINBACH
Permit Finaled 10/7/2025 RICHARD STEINBACH

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 4/22/2019 STEVEN JIN
BHO/Hillside ordinance Cleared 4/22/2019 STEVEN JIN
BHO/Hillside ordinance Cleared 4/22/2019 STEVEN JIN
Eng Process Fee Ord 176,300 Cleared 4/22/2019 STEVEN JIN
Permit Cleared 4/22/2019 STEVEN JIN
Sewer availability Cleared 4/22/2019 STEVEN JIN
Hydrant and Access approval Cleared 4/23/2019 GEORGE SUCHAND
Trees in Parkway Cleared 4/30/2019 JOHN KIM
Excavation more than 5-ft deep Cleared 8/19/2019 CALOSHA APPROVED
Work Adjacent to Public Way Cleared 8/19/2019 JENNY CEA
ZI Cleared 8/19/2019 SARAH GOLDMAN
Low Impact Development Cleared 2/11/2020 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 2/11/2020 JOHN LIN
Green Code Cleared 4/29/2020 RICHARD GARCIA

Contact Information

Contractor Owner-Builder       ,
Engineer Eftekhari,, Hossein; Lic. No.: C50121 5945 SETTLER COURT      ANAHEIM, CA 92807
Engineer Naim,, Soleiman Israel; Lic. No.: S2454 403 21ST ST      SANTA MONICA, CA 90402
Geologist Bramwell,, David Delton; Lic. No.: EG112 GLOBAL GEOLOGICAL SERVICES   983 RIDGEWOOD DR    CORONA, CA 91719

Inspector Information

RYAN SALAZAR, (310) 914-3862 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/13/2020 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 8/19/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 8/24/2020 Conditional Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 9/2/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 9/9/2020 Conditional Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 9/14/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 9/15/2020 Conditional Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 9/24/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 9/28/2020 Conditional Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 10/2/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/6/2020 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 10/23/2020 Corrections Issued CHRISTOPHER WILSON
Piling/Pier/Caisson 10/23/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/26/2020 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 10/26/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/27/2020 Conditional Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 11/6/2020 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 11/9/2020 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 11/20/2020 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 12/8/2020 Corrections Issued CHRISTOPHER WILSON
Masonry Wall/Backfill 12/8/2020 Not Ready for Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 12/9/2020 Partial Approval CHRISTOPHER WILSON
Masonry Wall/Backfill 12/18/2020 Partial Approval THOMAS FINNILA
Footing/Foundation/Slab 12/30/2020 Partial Approval MATT KELLERMAN
Masonry Wall/Backfill 12/30/2020 Partial Approval MATT KELLERMAN
Deputy Reinf. Masonry 1/5/2021 Conditional Approval CHRISTOPHER WILSON
Masonry Wall/Backfill 1/11/2021 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 2/26/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 3/2/2021 Conditional Approval CHRISTOPHER WILSON
Pre-Inspection 3/2/2021 Partial Approval CHRISTOPHER WILSON
Deputy Steel/Welding 3/11/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 3/12/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 3/16/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 3/17/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 3/18/2021 Partial Approval CHRISTOPHER WILSON
Deputy Steel/Welding 3/19/2021 Conditional Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 3/30/2021 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/5/2021 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/8/2021 Partial Approval CHRISTOPHER WILSON
Deputy Shotcrete 4/12/2021 Conditional Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 4/26/2021 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/29/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/30/2021 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/30/2021 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 5/4/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Shotcrete 5/7/2021 Conditional Approval CHRISTOPHER WILSON
Underground Mechanical 5/18/2021 Corrections Issued CHRISTOPHER WILSON
Underground Mechanical 5/20/2021 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 6/30/2021 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 7/2/2021 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 7/2/2021 Partial Inspection AMY COLIN
Deputy Reinf. Concrete 7/7/2021 Conditional Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 9/8/2021 Corrections Issued CHRISTOPHER WILSON
Deputy Reinf. Concrete 9/10/2021 Conditional Approval MATT KELLERMAN
Footing/Foundation/Slab 9/30/2021 Partial Approval CHRISTOPHER WILSON
Green Building Rough 9/30/2021 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 9/30/2021 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 9/30/2021 Not Ready for Inspection CHRISTOPHER WILSON
Deputy Shotcrete 10/5/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/20/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Shotcrete 11/4/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 11/15/2021 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 11/16/2021 Conditional Approval CHRISTOPHER WILSON
Special/Order Compliance 12/22/2021 Partial Inspection CLAYTON GRAHAM
Underground Mechanical 12/22/2021 Corrections Issued CHRISTOPHER WILSON
Underground Mechanical 1/12/2022 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 1/13/2022 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 1/14/2022 Partial Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 1/14/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 1/14/2022 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 1/28/2022 Partial Approval GERMAN RODRIGUEZ MENDOZA
Green Building Rough 2/22/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 2/22/2022 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 2/22/2022 Not Ready for Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 2/24/2022 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 3/1/2022 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 3/1/2022 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 3/3/2022 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 3/4/2022 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 3/7/2022 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/18/2022 Not Ready for Inspection CHRISTOPHER WILSON
Underground Mechanical 5/13/2022 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 5/18/2022 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 6/2/2022 Partial Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 6/2/2022 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 6/9/2022 Approved CHRISTOPHER WILSON
Deputy Reinf. Concrete 6/10/2022 Approved MICHAEL PELHAM
Deputy Steel/Welding 6/28/2022 Approved MICHAEL PELHAM
Deputy Reinf. Concrete 7/6/2022 Conditional Approval CHRISTOPHER WILSON
Green Building Rough 7/6/2022 Not Ready for Inspection CHRISTOPHER WILSON
Reinforced Concrete Frame 7/6/2022 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 7/6/2022 Not Ready for Inspection CHRISTOPHER WILSON
Deputy Steel/Welding 7/8/2022 Conditional Approval CHRISTOPHER WILSON
Green Building Rough 7/13/2022 Not Ready for Inspection CHRISTOPHER WILSON
Structural Steel Frame 7/13/2022 Corrections Issued CHRISTOPHER WILSON
Verify Sprinkler Sign Off 7/13/2022 Not Ready for Inspection CHRISTOPHER WILSON
Deputy Steel/Welding 7/18/2022 Conditional Approval BRENDAN LOONEY
Deputy Wood Construction 7/27/2022 Conditional Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 7/27/2022 Corrections Issued CHRISTOPHER WILSON
Structural Steel Frame 7/27/2022 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 7/28/2022 Partial Approval CHRISTOPHER WILSON
Deputy Steel/Welding 8/29/2022 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 9/9/2022 Conditional Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 10/18/2022 Partial Approval GERMAN RODRIGUEZ MENDOZA
Floor/Roof Diaphrgm/Shear Wall 12/7/2022 Partial Approval CHRISTOPHER WILSON
Wood Frame 12/7/2022 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 1/3/2023 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Deputy Steel/Welding 1/24/2023 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 1/24/2023 Corrections Issued CHRISTOPHER WILSON
Final 2/2/2023 Corrections Issued CARLOS MATAMOROS
PLUMBING-Rough 2/2/2023 Partial Approval CARLOS MATAMOROS
HVAC-Rough 2/27/2023 Corrections Issued CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 3/6/2023 Not Ready for Inspection CHRISTOPHER WILSON
Pre-Inspection 3/6/2023 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 4/12/2023 Corrections Issued CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 4/12/2023 Partial Approval CHRISTOPHER WILSON
Gas Test 4/24/2023 Corrections Issued CHRISTOPHER WILSON
HVAC-Rough 4/24/2023 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 4/24/2023 Not Ready for Inspection CHRISTOPHER WILSON
Underground Mechanical 4/24/2023 Not Ready for Inspection CHRISTOPHER WILSON
Gas Test 4/26/2023 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Rough 4/26/2023 Corrections Issued CHRISTOPHER WILSON
Underground Mechanical 4/26/2023 Corrections Issued CHRISTOPHER WILSON
Gas Test 5/10/2023 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 5/10/2023 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Rough 6/1/2023 Corrections Issued CHRISTOPHER WILSON
HVAC-Rough 6/22/2023 Approved CHRISTOPHER WILSON
ELECTRICAL-Rough 6/29/2023 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 7/6/2023 Approved BRENDAN LOONEY
Gas Test 7/17/2023 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 7/17/2023 Approved CHRISTOPHER WILSON
BUILDING-Rough-Frame 7/24/2023 Approved MICHAEL PELHAM
Green Building Rough 7/24/2023 Approved MICHAEL PELHAM
Insulation 7/24/2023 Corrections Issued MICHAEL PELHAM
Verify Sprinkler Sign Off 7/24/2023 Approved MICHAEL PELHAM
Insulation 8/2/2023 Corrections Issued CHRISTOPHER WILSON
Insulation 8/4/2023 Approved CHRISTOPHER WILSON
Interior/Exterior Lathing 8/4/2023 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 9/6/2023 Approved CHRISTOPHER WILSON
Interior/Exterior Lathing 9/28/2023 Partial Approval CHRISTOPHER WILSON
Shower Pan 9/28/2023 Partial Approval CHRISTOPHER WILSON
Shower Pan 11/13/2023 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 6/24/2024 Not Ready for Inspection CHRISTOPHER WILSON
Service/Power Release 7/17/2024 Corrections Issued CARLOS MATAMOROS
PLUMBING-Rough 9/4/2024 Corrections Issued CARLOS MATAMOROS
Reinforced Concrete Frame 9/4/2024 Not Ready for Inspection CARLOS MATAMOROS
Gas Test 11/12/2024 Corrections Issued SEAN HAUPT
SGSOV-Seismic Gas S/O Valve 11/18/2024 SGSOV Approved CHRISTOPHER WILSON
Pre-Inspection 1/7/2025 Partial Inspection MICHAEL PELHAM
Pre-Inspection 1/17/2025 Partial Inspection CHRISTOPHER WILSON
HVAC-Final 1/30/2025 Approved CHRISTOPHER WILSON
ELECTRICAL-Final 4/7/2025 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Final 4/9/2025 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Final 4/14/2025 Approved CHRISTOPHER WILSON
Service/Power Release 4/14/2025 Approved CHRISTOPHER WILSON
Final 4/17/2025 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Final 4/17/2025 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Final 4/24/2025 Not Ready for Inspection STEPHANIE SWANSON
PLUMBING-Final 4/29/2025 Approved CHRISTOPHER WILSON
Final 5/6/2025 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 5/6/2025 Approved CHRISTOPHER WILSON
Green Building Final 5/6/2025 Approved CHRISTOPHER WILSON
Reinforced Concrete Frame 5/6/2025 Approved CHRISTOPHER WILSON
Smoke Detectors 5/6/2025 Approved CHRISTOPHER WILSON
Structural Steel Frame 5/6/2025 Approved CHRISTOPHER WILSON
Final 9/30/2025 Corrections Issued CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 9/30/2025 SGSOV Approved CHRISTOPHER WILSON
Final 10/1/2025 OK to Issue CofO CHRISTOPHER WILSON