8750 N SEPULVEDA BLVD 91343

Certificate Information: 8750 N SEPULVEDA BLVD 91343

Application / Permit
19010-20000-05808
Plan Check / Job No.
B19VN21968
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
43 unit 5 story over basement garage (5 out of 43 dwelling units to be very low income) HOLDOWN SYSTEM & GLASS GUARDRAILS UNDER A DEFFERD PLAN CHECK SUBMITTAL/PERMIT
Permit Issued
Issued on 9/23/2022
Issuing Office
Valley
Current Status
CofO Issued on 1/5/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/18/2019 APPLICANT
Assigned to Plan Check Engineer 1/2/2020 ARMEN JIVALAGIAN
Corrections Issued 1/6/2020 RUDOLF KINAR MELIKOFF
Quality Review Completed 1/8/2020 STEVEN KIM
Building Plans Picked Up 1/8/2020 APPLICANT
Green Plans Picked Up 1/8/2020 APPLICANT
Disabled Access Plans Picked Up 1/28/2020 APPLICANT
Applicant returned to address corrections 6/2/2020 RUDOLF KINAR MELIKOFF
Applicant returned to address corrections 6/4/2020 ERIC WONG
Applicant returned to address corrections 7/31/2020 ERIC WONG
Applicant returned to address corrections 10/26/2020 RUDOLF KINAR MELIKOFF
Applicant returned to address corrections 11/8/2020 RUDOLF KINAR MELIKOFF
Applicant returned to address corrections 11/17/2020 RUDOLF KINAR MELIKOFF
Applicant returned to address corrections 12/8/2020 RUDOLF KINAR MELIKOFF
Applicant returned to address corrections 12/17/2020 RUDOLF KINAR MELIKOFF
Applicant returned to address corrections 12/28/2020 RUDOLF KINAR MELIKOFF
Applicant returned to address corrections 2/23/2021 RUDOLF KINAR MELIKOFF
Applicant returned to address corrections 6/7/2021 RUDOLF KINAR MELIKOFF
Applicant returned to address corrections 1/14/2022 ARMEN JIVALAGIAN
Applicant returned to address corrections 1/19/2022 ARMEN JIVALAGIAN
Applicant returned to address corrections 1/25/2022 ARMEN JIVALAGIAN
Applicant returned to address corrections 2/16/2022 ARMEN JIVALAGIAN
Plan Check Approved 2/17/2022 ARMEN JIVALAGIAN
Issued 9/23/2022 APPLICANT
Permit Finaled 1/5/2026 RICKEY JACKSON
CofO Issued 1/5/2026 RICKEY JACKSON
Permit Finaled 1/5/2026 RICKEY JACKSON

Permit Application Clearance Information

Address approval Cleared 1/24/2020 APEKSHYA BAJRACHARYA
Eng Process Fee Ord 176,300 Cleared 1/30/2020 APEKSHYA BAJRACHARYA
Sewer availability Cleared 1/30/2020 APEKSHYA BAJRACHARYA
Driveway location Cleared 2/19/2020 BRANDON WILSON
Hydrant and Access approval Cleared 2/27/2020 GEORGE SUCHAND
Highway dedication Cleared 4/28/2020 LEE GUILBEAUX
DAS Clearance Cleared 5/7/2020 RUDOLF KINAR MELIKOFF
Construction near power lines Cleared 5/17/2020 RIDWAN HARDY
Density Bonus 12.22.A.25 Cleared 7/21/2020 LOUIE MILLER
Building over 3-story or 36-ft Cleared 8/5/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 8/5/2020 CALOSHA APPROVED
Green Code Cleared 1/7/2021 MICHAEL AYERS
Miscellaneous Cleared 1/15/2021 LAUREN PADICK
ZA Case Cleared 1/15/2021 LAUREN PADICK
ZA Case Cleared 1/15/2021 LAUREN PADICK
Fire Marshall Fire Life Safety Cleared 3/5/2021 VIDAL GARCIA
Low Impact Development Cleared 4/19/2021 MARTIN FRAGOSO
Drainage to Storm Drain Cleared 4/23/2021 ADRIAN CASTRO
Roof/Waste drainage to street Cleared 4/23/2021 ADRIAN CASTRO
Permit Cleared 6/23/2021 ADRIAN CASTRO
Watercourse Cleared 1/24/2022 CARLOS AGUILERA

Contact Information

Contractor G N L Development Inc; Lic. No.: 981677-B 5939 TOPEKA DRIVE      TARZANA, CA 91356
Engineer Gharai,, Armin; Lic. No.: C61464 6701 CORIE LN      WEST HILLS, CA 91307
Engineer Jitechian,, Ara; Lic. No.: C54893 9433 VIA PATRICIA      BURBANK, CA 91504

Inspector Information

JOHN KITCKO, (818) 374-1109 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 11/15/2022 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 11/18/2022 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 12/7/2022 Partial Approval DANNY RODRIGUEZ
Special/Order Compliance 12/7/2022 Partial Inspection DEANDRE HOFFMAN
Deputy Reinf. Concrete 12/9/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 12/9/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 12/12/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 12/12/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 12/13/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 12/13/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 12/14/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 12/14/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 12/15/2022 Approved DANNY RODRIGUEZ
Deputy Shotcrete 12/15/2022 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 12/16/2022 Approved DANNY RODRIGUEZ
Deputy Shotcrete 12/16/2022 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 12/20/2022 Partial Approval DANNY RODRIGUEZ
Special/Order Compliance 1/12/2023 No Access for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 1/24/2023 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 1/24/2023 Partial Inspection DEANDRE HOFFMAN
Excavation/Setback/Form/Re-Bar 1/25/2023 Partial Approval DANNY RODRIGUEZ
Green Building Rough 1/25/2023 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 1/25/2023 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 1/27/2023 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 1/30/2023 Conditional Approval DANNY RODRIGUEZ
Special/Order Compliance 1/30/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 1/31/2023 Conditional Approval DANNY RODRIGUEZ
Special/Order Compliance 1/31/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 2/1/2023 Conditional Approval DANNY RODRIGUEZ
Special/Order Compliance 2/1/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 2/2/2023 Conditional Approval DANNY RODRIGUEZ
Special/Order Compliance 2/2/2023 Conditional Approval STEVEN LEVITT
Deputy Reinf. Concrete 2/3/2023 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 2/3/2023 Partial Approval DANNY RODRIGUEZ
Special/Order Compliance 2/3/2023 Partial Approval STEVEN LEVITT
Deputy Reinf. Concrete 2/6/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 2/6/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/7/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 2/7/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/8/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 2/8/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/9/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 2/9/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/10/2023 No Access for Inspection DANIEL VARNUM
Deputy Shotcrete 2/10/2023 No Access for Inspection DANIEL VARNUM
Deputy Shotcrete 2/13/2023 Conditional Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 2/15/2023 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 3/13/2023 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 3/24/2023 Partial Approval ROBERT DAVIS
Footing/Foundation/Slab 4/10/2023 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 4/12/2023 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 5/8/2023 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/10/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 5/18/2023 Conditional Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 5/19/2023 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 6/13/2023 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 7/12/2023 Partial Inspection CAMERON CHABAN
Special/Order Compliance 7/12/2023 Partial Inspection CAMERON CHABAN
Footing/Foundation/Slab 7/13/2023 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 7/14/2023 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/17/2023 Approved DANNY RODRIGUEZ
Green Building Rough 7/26/2023 Not Ready for Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 7/26/2023 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 7/26/2023 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Wood Construction 8/15/2023 Conditional Approval DANNY RODRIGUEZ
Drywall Nailing 8/16/2023 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 8/16/2023 Partial Approval DANNY RODRIGUEZ
Green Building Rough 8/16/2023 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 8/16/2023 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Wood Construction 8/31/2023 Approved DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 8/31/2023 Partial Approval DANNY RODRIGUEZ
Green Building Rough 8/31/2023 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Wood Construction 9/18/2023 Conditional Approval DANNY RODRIGUEZ
Drywall Nailing 9/18/2023 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 9/18/2023 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 9/18/2023 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 9/19/2023 Partial Approval DANNY RODRIGUEZ
Deputy Wood Construction 10/24/2023 Conditional Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 10/25/2023 Partial Approval DANNY RODRIGUEZ
Deputy Wood Construction 10/27/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Wood Construction 11/8/2023 Conditional Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/13/2023 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 11/22/2023 Conditional Approval JEFFREY DURAN
Green Building Rough 11/27/2023 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 11/27/2023 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 11/27/2023 Partial Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 11/28/2023 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 11/28/2023 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 11/29/2023 Partial Inspection JEFFREY FULTON
Insulation 11/30/2023 Not Ready for Inspection JEFFREY FULTON
Special/Order Compliance 11/30/2023 Not Ready for Inspection JEFFREY FULTON
Insulation 12/1/2023 Partial Approval DANNY RODRIGUEZ
Deputy Wood Construction 12/6/2023 Conditional Approval DANNY RODRIGUEZ
Deputy Wood Construction 12/12/2023 Approved DANNY RODRIGUEZ
Green Building Rough 12/13/2023 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 12/13/2023 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 12/13/2023 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 12/18/2023 Partial Approval DANNY RODRIGUEZ
Insulation 12/21/2023 Partial Approval DANNY RODRIGUEZ
Green Building Rough 12/22/2023 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 12/22/2023 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 12/22/2023 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 12/22/2023 Partial Inspection DANNY RODRIGUEZ
Wood Frame 12/22/2023 Partial Approval DANNY RODRIGUEZ
Deputy Wood Construction 12/28/2023 Approved DANNY RODRIGUEZ
Green Building Rough 12/29/2023 Partial Inspection EDWIN GREGORYONA
Insulation 12/29/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 12/29/2023 Partial Inspection EDWIN GREGORYONA
Wood Frame 12/29/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 1/5/2024 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 1/5/2024 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 1/5/2024 Partial Inspection DANNY RODRIGUEZ
Drywall Nailing 1/8/2024 Partial Approval DANNY RODRIGUEZ
Insulation 1/10/2024 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Wood Construction 1/11/2024 Approved DANNY RODRIGUEZ
Insulation 1/11/2024 Not Ready for Inspection DANNY RODRIGUEZ
Pre-Inspection 1/11/2024 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 1/12/2024 Partial Approval DANNY RODRIGUEZ
Insulation 1/12/2024 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 1/17/2024 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 1/18/2024 Partial Approval DANNY RODRIGUEZ
Insulation 1/22/2024 Partial Approval JOHN KITCKO
Drywall Nailing 1/24/2024 Partial Approval DANNY RODRIGUEZ
Green Building Rough 1/24/2024 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 1/25/2024 Partial Approval DANNY RODRIGUEZ
Green Building Rough 2/2/2024 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 2/2/2024 Partial Inspection DANNY RODRIGUEZ
Wood Frame 2/2/2024 Partial Approval DANNY RODRIGUEZ
Insulation 2/9/2024 Partial Approval JOHN KITCKO
Green Building Rough 2/13/2024 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 2/13/2024 Partial Inspection DANNY RODRIGUEZ
Wood Frame 2/13/2024 Partial Inspection DANNY RODRIGUEZ
Insulation 2/20/2024 Partial Inspection ANDREW DORSO
Drywall Nailing 2/21/2024 Partial Approval DEANDRE HOFFMAN
Green Building Rough 2/21/2024 Not Ready for Inspection DEANDRE HOFFMAN
Special/Order Compliance 2/21/2024 Partial Inspection MELVIN GIRTON
Verify Sprinkler Sign Off 2/21/2024 Partial Inspection DEANDRE HOFFMAN
Wood Frame 2/21/2024 Partial Approval DEANDRE HOFFMAN
Drywall Nailing 2/26/2024 Partial Approval DEANDRE HOFFMAN
Green Building Rough 2/26/2024 Not Ready for Inspection DEANDRE HOFFMAN
Insulation 2/26/2024 Partial Approval DEANDRE HOFFMAN
Special/Order Compliance 2/26/2024 Partial Inspection MELVIN GIRTON
Verify Sprinkler Sign Off 2/26/2024 Partial Inspection DEANDRE HOFFMAN
Wood Frame 2/26/2024 Not Ready for Inspection DEANDRE HOFFMAN
Wood Frame 2/27/2024 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 3/4/2024 Partial Approval DEANDRE HOFFMAN
Green Building Rough 3/4/2024 Partial Inspection DEANDRE HOFFMAN
Verify Sprinkler Sign Off 3/5/2024 Partial Inspection DANNY RODRIGUEZ
Wood Frame 3/5/2024 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 3/12/2024 Partial Approval DANNY RODRIGUEZ
Green Building Rough 3/12/2024 Partial Approval DANNY RODRIGUEZ
Insulation 3/12/2024 Partial Approval DANNY RODRIGUEZ
Insulation 3/13/2024 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 3/20/2024 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 3/27/2024 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 3/27/2024 Approved DANNY RODRIGUEZ
Drywall Nailing 4/1/2024 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 4/1/2024 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 6/21/2024 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 6/27/2024 Partial Inspection DANNY RODRIGUEZ
Interior/Exterior Lathing 10/3/2024 Not Ready for Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 12/6/2024 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 12/6/2024 Partial Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 1/13/2025 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 1/28/2025 Not Ready for Inspection DANNY RODRIGUEZ
Interior/Exterior Lathing 2/3/2025 Partial Inspection DANNY RODRIGUEZ
Interior/Exterior Lathing 2/11/2025 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 10/17/2025 Approved JOHN KITCKO
Final 10/17/2025 Not Ready for Inspection JOHN KITCKO
Footing/Foundation/Slab 10/17/2025 Approved JOHN KITCKO
Green Building Final 10/17/2025 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 10/17/2025 Approved JOHN KITCKO
Reinforced Masonry Frame 10/17/2025 Approved JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 10/17/2025 SGSOV Not Ready JOHN KITCKO
Smoke Detectors 10/17/2025 Approved JOHN KITCKO
Verify Sprinkler Sign Off 10/17/2025 Approved JOHN KITCKO
Wood Frame 10/17/2025 Approved JOHN KITCKO
Final 11/5/2025 Not Ready for Inspection JEFFREY DURAN
Green Building Final 11/5/2025 Not Ready for Inspection JEFFREY DURAN
SGSOV-Seismic Gas S/O Valve 11/5/2025 SGSOV Approved JEFFREY DURAN
Final 11/20/2025 Conditional Approval GREGORY POMISH
Green Building Final 11/20/2025 Approved GREGORY POMISH
Final 12/12/2025 Not Ready for Inspection GREGORY POMISH