Pre-Inspection
|
2/10/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/5/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
4/5/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/6/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/12/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
4/12/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/13/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/14/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
4/15/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
4/15/2022
|
Not Ready for Inspection
|
JEFF BYTHEWAY
|
|
Verify Sprinkler Sign Off
|
4/15/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/18/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/19/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/19/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
4/19/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/20/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
4/20/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/21/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/22/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
4/22/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Green Building Rough
|
4/22/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
4/22/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
4/25/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
4/25/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
4/25/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
4/28/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
4/28/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
5/3/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
5/3/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/20/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
5/20/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/23/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
5/23/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
5/24/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Concrete Frame
|
6/21/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
6/23/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
6/29/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
6/30/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
7/1/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
7/1/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
7/5/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
7/6/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Excavation/Setback/Form/Re-Bar
|
7/6/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
7/7/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
7/7/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
7/7/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
7/8/2022
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Reinf. Masonry
|
7/8/2022
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Shotcrete
|
7/8/2022
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Reinf. Masonry
|
7/11/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
7/12/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Masonry Wall/Backfill
|
7/12/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
7/14/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Masonry
|
7/15/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
7/15/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Reinforced Masonry Frame
|
7/15/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Special/Order Compliance
|
7/26/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/3/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/11/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/12/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
8/12/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/16/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
8/16/2022
|
Partial Inspection
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/17/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Excavation/Setback/Form/Re-Bar
|
8/17/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
8/18/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
8/22/2022
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/13/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
9/14/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
9/15/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/15/2022
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
9/16/2022
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
9/26/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
9/27/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
9/28/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
9/29/2022
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/29/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
9/30/2022
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/3/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
10/6/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
10/7/2022
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/19/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
10/20/2022
|
Conditional Approval
|
HENRY BAGHDASSARIAN
|
|
Deputy Wood Construction
|
10/21/2022
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/21/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
10/21/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/24/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
10/25/2022
|
Conditional Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
10/26/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
10/27/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
10/28/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
11/3/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Steel/Welding
|
11/4/2022
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
11/14/2022
|
Conditional Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
11/15/2022
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/15/2022
|
Corrections Issued
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
11/16/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
11/17/2022
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/17/2022
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Wood Construction
|
11/18/2022
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/18/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/22/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
11/23/2022
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/19/2022
|
Not Ready for Inspection
|
NICK LAROCCA
|
|
Wood Frame
|
12/19/2022
|
Partial Approval
|
NICK LAROCCA
|
|
Deputy Wood Construction
|
12/20/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Wood Construction
|
12/21/2022
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Wood Construction
|
12/22/2022
|
Approved
|
GRANT WOODS
|
|
Deputy Wood Construction
|
12/23/2022
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/23/2022
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/29/2022
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/18/2023
|
Partial Approval
|
MICHAEL PETRUSKO
|
|
Deputy Wood Construction
|
1/25/2023
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
1/26/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
1/27/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
1/27/2023
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
1/30/2023
|
Approved
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/30/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
1/31/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
2/1/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
2/2/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
2/3/2023
|
Approved
|
DERRICK SPENCER
|
|
Drywall Nailing
|
2/9/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
2/16/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
3/7/2023
|
Conditional Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/9/2023
|
Approved
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
3/9/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
4/5/2023
|
Conditional Approval
|
JEFF BYTHEWAY
|
|
Deputy Wood Construction
|
4/6/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
4/7/2023
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
4/10/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
4/18/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Pre-Inspection
|
5/9/2023
|
Not Ready for Inspection
|
DAVID TSAU
|
|
Wood Frame
|
5/9/2023
|
Partial Approval
|
DAVID TSAU
|
|
Interior/Exterior Lathing
|
5/11/2023
|
Partial Approval
|
NICK LAROCCA
|
|
Pre-Inspection
|
5/17/2023
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
5/17/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Interior/Exterior Lathing
|
5/19/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/6/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/12/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/16/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Wood Frame
|
6/16/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
6/21/2023
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Insulation
|
6/26/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
7/5/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Insulation
|
7/10/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
7/19/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
8/2/2023
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Insulation
|
8/14/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
8/22/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
8/28/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
9/1/2023
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
9/1/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
9/5/2023
|
Approved
|
DERRICK SPENCER
|
|
Drywall Nailing
|
9/15/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
9/22/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
10/11/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Insulation
|
10/17/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Wall Anchors
|
10/17/2023
|
Approved
|
DERRICK SPENCER
|
|
Insulation
|
10/23/2023
|
Approved
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
10/23/2023
|
Approved
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
10/30/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Drywall Nailing
|
11/3/2023
|
Approved
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
11/13/2023
|
Approved
|
DERRICK SPENCER
|
|
Light Gage Steel Frame
|
11/16/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
12/4/2023
|
Approved
|
DERRICK SPENCER
|
|
Insulation
|
1/9/2024
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
1/24/2024
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
3/6/2024
|
Approved
|
DERRICK SPENCER
|
|
Pre-Inspection
|
3/20/2024
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Pre-Inspection
|
3/28/2024
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Pre-Inspection
|
4/18/2024
|
Approved
|
DERRICK SPENCER
|
|
Final
|
5/13/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Green Building Final
|
5/13/2024
|
Approved
|
PAUL DAVIDSON
|
|
Pre-Inspection
|
5/13/2024
|
Approved
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
5/13/2024
|
Approved
|
PAUL DAVIDSON
|
|
SGSOV-Seismic Gas S/O Valve
|
5/13/2024
|
SGSOV Approved
|
PAUL DAVIDSON
|
|
Smoke Detectors
|
5/13/2024
|
Approved
|
PAUL DAVIDSON
|
|
Structural Steel Frame
|
5/13/2024
|
Approved
|
PAUL DAVIDSON
|
|
Wood Frame
|
5/13/2024
|
Approved
|
PAUL DAVIDSON
|
|
Final
|
5/15/2024
|
Corrections Issued
|
PAUL DAVIDSON
|
|
Final
|
5/17/2024
|
OK to Issue CofO
|
PAUL DAVIDSON
|