10700 W TABOR ST 90034

Certificate Information: 10700 W TABOR ST 90034

Application / Permit
19010-20000-05734
Plan Check / Job No.
B19VN21822
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
5-STORY TYPE III-A 119-UNIT (TOC TIER 2, 11 EXTREMELY LOW INCOME UNITS) OVER 1-STORY TYPE I-A RETAIL & PARKING OVER TYPE I-A BASEMENT PARKING (NFPA-13 FIRE SPRINKLERS THROUGHOUT)
Permit Issued
Issued on 1/28/2022
Issuing Office
West Los Angeles
Current Status
CofO Issued on 5/22/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/17/2019 APPLICANT
Assigned to Plan Check Engineer 12/26/2019 RUDOLF KINAR MELIKOFF
Corrections Issued 12/30/2019 RUDOLF KINAR MELIKOFF
Quality Review Completed 1/3/2020 STEVEN KIM
Applicant returned to address corrections 7/30/2021 NILOOFAR MEHRAIN
Plan Check Approved 1/18/2022 NILOOFAR MEHRAIN
Issued 1/28/2022 APPLICANT
Building Plans Picked Up 1/28/2022 APPLICANT
CofO in Progress 5/20/2024 PAUL DAVIDSON
Permit Finaled 5/22/2024 DAVID TSAU
CofO Issued 5/22/2024 DAVID TSAU
Permit Finaled 5/22/2024 DAVID TSAU

Permit Application Clearance Information

Encroachment in public way Cleared 6/23/2020 DINAH GARIN
Permit Cleared 6/23/2020 DINAH GARIN
Trees in Parkway Cleared 3/31/2021 JOHN KIM
Eng Process Fee Ord 176,300 Cleared 4/15/2021 RAYMOND MUGAMBWA
Drainage to Storm Drain Cleared 4/19/2021 DINAH GARIN
Building over 3-story or 36-ft Cleared 4/21/2021 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 4/21/2021 CALOSHA APPROVED
Miscellaneous Cleared 6/8/2021 RAYMOND MUGAMBWA
Sewer availability Cleared 6/8/2021 RAYMOND MUGAMBWA
Work Adjacent to Public Way Cleared 6/16/2021 SAUL GARCIA
GPI Written Notices Cleared 7/5/2021 NILOOFAR MEHRAIN
Grading Pre-Inspection Cleared 7/5/2021 RUDOLF KINAR MELIKOFF
Construction near power lines Cleared 7/9/2021 RIDWAN HARDY
Green Code Cleared 7/28/2021 MICHAEL AYERS
Highway dedication Cleared 8/3/2021 RAYMOND MUGAMBWA
ZA Case Cleared 8/4/2021 NOAH MCCOY
ZA Case Cleared 8/4/2021 NOAH MCCOY
Address approval Cleared 8/25/2021 NIKTA MOUSAVI
Hydrant and Access approval Cleared 8/30/2021 MATTHEW CRAIG
Low Impact Development Cleared 9/14/2021 MITESH PATEL
Roof/Waste drainage to street Cleared 9/16/2021 DINAH GARIN
Density Bonus 12.22.A.31 Cleared 9/17/2021 KENNETH LE
Specific Plan Cleared 9/30/2021 PEDRO AYALA
Fire Marshall Fire Life Safety Cleared 10/25/2021 MENOA AGHAJANI
DAS Clearance Cleared 11/2/2021 RUDOLF KINAR MELIKOFF
Opn space landscape/Water mgmt Cleared 12/21/2021 LOUIS ORTEGA
Site Plan review Cleared 12/21/2021 LOUIS ORTEGA
ZA Case Cleared 12/21/2021 LOUIS ORTEGA

Contact Information

Contractor Helio; Lic. No.: 1004478-B 8721 SANTA MONICA BLVD STE 224      LOS ANGELES, CA 90069
Engineer Benichou,, Ety; Lic. No.: S5263 888 S FIGUEROA ST 18TH FLOOR      LOS ANGELES, CA 90017

Inspector Information

PAUL DAVIDSON, (310) 914-3914 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/10/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/5/2022 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 4/5/2022 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 4/6/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/12/2022 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 4/12/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/13/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/14/2022 Approved JEFF BYTHEWAY
Green Building Rough 4/15/2022 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 4/15/2022 Not Ready for Inspection JEFF BYTHEWAY
Verify Sprinkler Sign Off 4/15/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/18/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/19/2022 Approved JEFF BYTHEWAY
Deputy Shotcrete 4/19/2022 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 4/19/2022 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 4/20/2022 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 4/20/2022 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 4/21/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/22/2022 Approved JEFF BYTHEWAY
Deputy Shotcrete 4/22/2022 Approved JEFF BYTHEWAY
Green Building Rough 4/22/2022 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 4/22/2022 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 4/25/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 4/25/2022 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 4/25/2022 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Masonry 4/28/2022 Approved JEFF BYTHEWAY
Masonry Wall/Backfill 4/28/2022 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Masonry 5/3/2022 Approved JEFF BYTHEWAY
Reinforced Masonry Frame 5/3/2022 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/20/2022 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 5/20/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/23/2022 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 5/23/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/24/2022 Approved JEFF BYTHEWAY
Reinforced Concrete Frame 6/21/2022 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 6/23/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 6/29/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 6/30/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 7/1/2022 Approved JEFF BYTHEWAY
Reinforced Masonry Frame 7/1/2022 Partial Approval JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 7/5/2022 Partial Inspection SORIN CIRSTOIU
Deputy Reinf. Masonry 7/6/2022 Approved SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 7/6/2022 Partial Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 7/7/2022 Approved DERRICK SPENCER
Deputy Reinf. Masonry 7/7/2022 Approved DERRICK SPENCER
Deputy Shotcrete 7/7/2022 Approved DERRICK SPENCER
Deputy Reinf. Concrete 7/8/2022 Conditional Approval DAVID TSAU
Deputy Reinf. Masonry 7/8/2022 Conditional Approval DAVID TSAU
Deputy Shotcrete 7/8/2022 Conditional Approval DAVID TSAU
Deputy Reinf. Masonry 7/11/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 7/12/2022 Approved JEFF BYTHEWAY
Masonry Wall/Backfill 7/12/2022 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Masonry 7/14/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 7/15/2022 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 7/15/2022 Approved JEFF BYTHEWAY
Reinforced Masonry Frame 7/15/2022 Partial Approval JEFF BYTHEWAY
Special/Order Compliance 7/26/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/3/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/11/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/12/2022 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/12/2022 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 8/16/2022 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/16/2022 Partial Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 8/17/2022 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/17/2022 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/18/2022 Approved DERRICK SPENCER
Deputy Reinf. Concrete 8/22/2022 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 9/13/2022 Partial Approval JEFF BYTHEWAY
Deputy Wood Construction 9/14/2022 Approved JEFF BYTHEWAY
Deputy Wood Construction 9/15/2022 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 9/15/2022 Partial Approval JEFF BYTHEWAY
Deputy Wood Construction 9/16/2022 Approved JEFF BYTHEWAY
Deputy Wood Construction 9/26/2022 Approved DERRICK SPENCER
Deputy Wood Construction 9/27/2022 Approved DERRICK SPENCER
Deputy Wood Construction 9/28/2022 Approved DERRICK SPENCER
Deputy Wood Construction 9/29/2022 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 9/29/2022 Partial Approval DERRICK SPENCER
Deputy Wood Construction 9/30/2022 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 10/3/2022 Partial Approval DERRICK SPENCER
Deputy Wood Construction 10/6/2022 Approved DERRICK SPENCER
Deputy Wood Construction 10/7/2022 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 10/19/2022 Partial Approval DERRICK SPENCER
Deputy Wood Construction 10/20/2022 Conditional Approval HENRY BAGHDASSARIAN
Deputy Wood Construction 10/21/2022 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 10/21/2022 Partial Approval DERRICK SPENCER
Wood Frame 10/21/2022 Partial Approval DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 10/24/2022 Partial Approval DERRICK SPENCER
Deputy Wood Construction 10/25/2022 Conditional Approval JEFF BYTHEWAY
Deputy Wood Construction 10/26/2022 Approved DERRICK SPENCER
Deputy Wood Construction 10/27/2022 Approved DERRICK SPENCER
Deputy Wood Construction 10/28/2022 Approved DERRICK SPENCER
Deputy Steel/Welding 11/3/2022 Approved DERRICK SPENCER
Deputy Steel/Welding 11/4/2022 Conditional Approval DERRICK SPENCER
Deputy Wood Construction 11/14/2022 Conditional Approval JEFF BYTHEWAY
Deputy Wood Construction 11/15/2022 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 11/15/2022 Corrections Issued DERRICK SPENCER
Deputy Wood Construction 11/16/2022 Approved DERRICK SPENCER
Deputy Wood Construction 11/17/2022 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 11/17/2022 Partial Approval NICK LAROCCA
Deputy Wood Construction 11/18/2022 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 11/18/2022 Partial Approval DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 11/22/2022 Partial Approval DERRICK SPENCER
Deputy Wood Construction 11/23/2022 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 12/19/2022 Not Ready for Inspection NICK LAROCCA
Wood Frame 12/19/2022 Partial Approval NICK LAROCCA
Deputy Wood Construction 12/20/2022 Conditional Approval SORIN CIRSTOIU
Deputy Wood Construction 12/21/2022 Conditional Approval DAVID TSAU
Deputy Wood Construction 12/22/2022 Approved GRANT WOODS
Deputy Wood Construction 12/23/2022 Conditional Approval PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 12/23/2022 Not Ready for Inspection PAUL DAVIDSON
Floor/Roof Diaphrgm/Shear Wall 12/29/2022 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 1/18/2023 Partial Approval MICHAEL PETRUSKO
Deputy Wood Construction 1/25/2023 Conditional Approval DERRICK SPENCER
Deputy Wood Construction 1/26/2023 Approved DERRICK SPENCER
Deputy Wood Construction 1/27/2023 Approved DERRICK SPENCER
Deputy Wood Construction 1/27/2023 Conditional Approval DERRICK SPENCER
Deputy Wood Construction 1/30/2023 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 1/30/2023 Partial Approval DERRICK SPENCER
Deputy Wood Construction 1/31/2023 Approved DERRICK SPENCER
Deputy Wood Construction 2/1/2023 Approved DERRICK SPENCER
Deputy Wood Construction 2/2/2023 Approved DERRICK SPENCER
Deputy Wood Construction 2/3/2023 Approved DERRICK SPENCER
Drywall Nailing 2/9/2023 Partial Approval DERRICK SPENCER
Interior/Exterior Lathing 2/16/2023 Partial Approval DERRICK SPENCER
Deputy Wood Construction 3/7/2023 Conditional Approval DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 3/9/2023 Approved DERRICK SPENCER
Interior/Exterior Lathing 3/9/2023 Partial Approval DERRICK SPENCER
Deputy Wood Construction 4/5/2023 Conditional Approval JEFF BYTHEWAY
Deputy Wood Construction 4/6/2023 Approved DERRICK SPENCER
Deputy Wood Construction 4/7/2023 Approved DERRICK SPENCER
Wood Frame 4/10/2023 Partial Approval DERRICK SPENCER
Insulation 4/18/2023 Partial Approval DERRICK SPENCER
Pre-Inspection 5/9/2023 Not Ready for Inspection DAVID TSAU
Wood Frame 5/9/2023 Partial Approval DAVID TSAU
Interior/Exterior Lathing 5/11/2023 Partial Approval NICK LAROCCA
Pre-Inspection 5/17/2023 Approved DERRICK SPENCER
Wood Frame 5/17/2023 Partial Approval DERRICK SPENCER
Interior/Exterior Lathing 5/19/2023 Partial Approval DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 6/6/2023 Partial Approval DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 6/12/2023 Partial Approval DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 6/16/2023 Partial Approval DERRICK SPENCER
Wood Frame 6/16/2023 Partial Approval DERRICK SPENCER
Insulation 6/21/2023 Not Ready for Inspection DERRICK SPENCER
Insulation 6/26/2023 Partial Approval DERRICK SPENCER
Drywall Nailing 7/5/2023 Partial Approval SORIN CIRSTOIU
Insulation 7/10/2023 Partial Approval DERRICK SPENCER
Drywall Nailing 7/19/2023 Partial Approval DERRICK SPENCER
Insulation 8/2/2023 Not Ready for Inspection DERRICK SPENCER
Insulation 8/14/2023 Partial Approval DERRICK SPENCER
Drywall Nailing 8/22/2023 Partial Approval DERRICK SPENCER
Insulation 8/28/2023 Partial Approval DERRICK SPENCER
Insulation 9/1/2023 Not Ready for Inspection DERRICK SPENCER
Light Gage Steel Frame 9/1/2023 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 9/5/2023 Approved DERRICK SPENCER
Drywall Nailing 9/15/2023 Partial Approval DERRICK SPENCER
Drywall Nailing 9/22/2023 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 10/11/2023 Partial Approval DERRICK SPENCER
Insulation 10/17/2023 Partial Approval DERRICK SPENCER
Wall Anchors 10/17/2023 Approved DERRICK SPENCER
Insulation 10/23/2023 Approved DERRICK SPENCER
Light Gage Steel Frame 10/23/2023 Approved DERRICK SPENCER
Light Gage Steel Frame 10/30/2023 Partial Approval DERRICK SPENCER
Drywall Nailing 11/3/2023 Approved DERRICK SPENCER
Light Gage Steel Frame 11/13/2023 Approved DERRICK SPENCER
Light Gage Steel Frame 11/16/2023 Partial Approval DERRICK SPENCER
Special/Order Compliance 12/4/2023 Approved DERRICK SPENCER
Insulation 1/9/2024 Approved DERRICK SPENCER
Pre-Inspection 1/24/2024 Approved DERRICK SPENCER
Pre-Inspection 3/6/2024 Approved DERRICK SPENCER
Pre-Inspection 3/20/2024 Partial Inspection PAUL DAVIDSON
Pre-Inspection 3/28/2024 Partial Inspection PAUL DAVIDSON
Pre-Inspection 4/18/2024 Approved DERRICK SPENCER
Final 5/13/2024 Conditional Approval PAUL DAVIDSON
Green Building Final 5/13/2024 Approved PAUL DAVIDSON
Pre-Inspection 5/13/2024 Approved PAUL DAVIDSON
Reinforced Concrete Frame 5/13/2024 Approved PAUL DAVIDSON
SGSOV-Seismic Gas S/O Valve 5/13/2024 SGSOV Approved PAUL DAVIDSON
Smoke Detectors 5/13/2024 Approved PAUL DAVIDSON
Structural Steel Frame 5/13/2024 Approved PAUL DAVIDSON
Wood Frame 5/13/2024 Approved PAUL DAVIDSON
Final 5/15/2024 Corrections Issued PAUL DAVIDSON
Final 5/17/2024 OK to Issue CofO PAUL DAVIDSON