849 N SPAULDING AVE 90046

Certificate Information: 849 N SPAULDING AVE 90046

Application / Permit
19010-20000-05040
Plan Check / Job No.
B19VN19558
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(N) Irregular 38'x75' Two-Story Single-Family Dwelling with second floor deck and balcony, and a 20'x22'6" attached Garage.
Permit Issued
Issued on 2/14/2020
Issuing Office
Valley
Current Status
CofO Issued on 3/6/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/12/2019 APPLICANT
Assigned to Plan Check Engineer 11/21/2019 LUIS RINCON
Corrections Issued 11/23/2019 LUIS RINCON
Quality Review Completed 11/26/2019 GUANG MIN TUNG
Building Plans Picked Up 12/6/2019 APPLICANT
Green Plans Picked Up 12/6/2019 APPLICANT
Plan Check Approved 1/13/2020 LUIS RINCON
Issued 2/14/2020 LADBS
CofO in Progress 3/5/2021 CHRIS CHRISTENSEN
Permit Finaled 3/6/2021 DEROLD HAUFF
CofO Issued 3/6/2021 DEROLD HAUFF
Permit Finaled 3/6/2021 DEROLD HAUFF

Permit Application Clearance Information

Trees in Parkway Cleared 12/16/2019 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 12/17/2019 ADRIAN CASTRO
Permit Cleared 12/17/2019 ADRIAN CASTRO
Sewer availability Cleared 12/17/2019 ADRIAN CASTRO
Hydrant and Access approval Cleared 1/3/2020 GEORGE SUCHAND
Green Code Cleared 1/10/2020 MICHAEL AYERS
Low Impact Development Cleared 1/10/2020 SARAH YOUSSEF
Roof/Waste drainage to street Cleared 1/10/2020 ADRIAN CASTRO

Contact Information

Contractor Owner-Builder       ,
Engineer Yuzon,, Benigno S; Lic. No.: S3454 25531 PRADO DELAS BELLOTAS      CALABASAS, CA 91302

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 3/9/2020 Approved ARTHUR SARGSYAN
BUILDING-Rough-Frame 3/24/2020 Not Ready for Inspection JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 3/24/2020 Corrections Issued JOSEPH MCGARRY
Green Building Rough 3/24/2020 Not Ready for Inspection JOSEPH MCGARRY
Verify Sprinkler Sign Off 3/24/2020 Not Ready for Inspection JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 3/25/2020 Partial Approval JOSEPH MCGARRY
Footing/Foundation/Slab 3/25/2020 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 4/1/2020 Partial Approval JOSEPH MCGARRY
Deputy Steel/Welding 4/2/2020 Approved CHRIS CHRISTENSEN
Excavation/Setback/Form/Re-Bar 4/3/2020 Approved JOSEPH MCGARRY
Footing/Foundation/Slab 4/3/2020 Approved JOSEPH MCGARRY
Deputy Steel/Welding 4/17/2020 Approved CHRIS CHRISTENSEN
Wood Frame 4/17/2020 Partial Approval CHRIS CHRISTENSEN
Floor/Roof Diaphrgm/Shear Wall 4/23/2020 Conditional Approval CHRIS CHRISTENSEN
Floor/Roof Diaphrgm/Shear Wall 5/28/2020 Partial Approval CHRIS CHRISTENSEN
PLUMBING-Rough 5/28/2020 Approved CHRIS CHRISTENSEN
BUILDING-Rough-Frame 5/29/2020 Not Ready for Inspection CHRIS CHRISTENSEN
Green Building Rough 5/29/2020 Not Ready for Inspection CHRIS CHRISTENSEN
HVAC-Rough 5/29/2020 Not Ready for Inspection CHRIS CHRISTENSEN
Verify Sprinkler Sign Off 5/29/2020 Not Ready for Inspection CHRIS CHRISTENSEN
Shower Pan 6/4/2020 Approved CHRIS CHRISTENSEN
ELECTRICAL-Rough 6/9/2020 No Access for Inspection CHRIS CHRISTENSEN
HVAC-Rough 6/9/2020 Not Ready for Inspection CHRIS CHRISTENSEN
Interior/Exterior Lathing 6/9/2020 Partial Approval CHRIS CHRISTENSEN
ELECTRICAL-Rough 6/26/2020 Corrections Issued CHRIS CHRISTENSEN
HVAC-Rough 6/26/2020 Corrections Issued CHRIS CHRISTENSEN
Interior/Exterior Lathing 7/17/2020 Partial Approval CHRIS CHRISTENSEN
BUILDING-Rough-Frame 7/23/2020 Approved CHRIS CHRISTENSEN
ELECTRICAL-Rough 7/23/2020 Approved CHRIS CHRISTENSEN
Green Building Rough 7/23/2020 Approved CHRIS CHRISTENSEN
HVAC-Rough 7/23/2020 Approved CHRIS CHRISTENSEN
Insulation 7/23/2020 Approved CHRIS CHRISTENSEN
Verify Sprinkler Sign Off 7/23/2020 Approved CHRIS CHRISTENSEN
Drywall Nailing 7/27/2020 Approved CHRISTOPHER DELLEFIELD
Gas Test 7/27/2020 Not Ready for Inspection CHRISTOPHER DELLEFIELD
ELECTRICAL-Final 2/16/2021 Approved CHRIS CHRISTENSEN
Final 2/16/2021 Corrections Issued CHRIS CHRISTENSEN
Green Building Final 2/16/2021 Approved CHRIS CHRISTENSEN
HVAC-Final 2/16/2021 Corrections Issued CHRIS CHRISTENSEN
PLUMBING-Final 2/16/2021 Approved CHRIS CHRISTENSEN
SGSOV-Seismic Gas S/O Valve 2/16/2021 SGSOV Approved CHRIS CHRISTENSEN
Service/Power Release 2/16/2021 Not Ready for Inspection CHRIS CHRISTENSEN
Smoke Detectors 2/16/2021 Approved CHRIS CHRISTENSEN
Structural Steel Frame 2/16/2021 Approved CHRIS CHRISTENSEN
HVAC-Final 2/17/2021 Not Ready for Inspection CHRIS CHRISTENSEN
PLUMBING-Final 2/17/2021 Approved CHRIS CHRISTENSEN
Final 2/23/2021 Corrections Issued CHRIS CHRISTENSEN
HVAC-Final 2/23/2021 Approved CHRIS CHRISTENSEN
Service/Power Release 2/23/2021 Approved CHRIS CHRISTENSEN
Final 3/3/2021 OK to Issue CofO CHRIS CHRISTENSEN