9330 W HILLROSE ST 91040

Certificate Information: 9330 W HILLROSE ST 91040

Application / Permit
19010-20000-04260
Plan Check / Job No.
B19VN16300
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(23) Recreation Room
Work Description
POOL BATHROOM/PATIO COVER 21' x 9'-6"
Permit Issued
Issued on 9/2/2020
Issuing Office
Current Status
CofO Issued on 1/8/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/24/2019 APPLICANT
Green Plans Picked Up 10/3/2019 APPLICANT
Assigned to Plan Check Engineer 10/10/2019 CHON CHIO KUO
Corrections Issued 10/15/2019 CHON CHIO KUO
Quality Review Completed 10/16/2019 GUANG MIN TUNG
Building Plans Picked Up 10/17/2019 APPLICANT
Applicant returned to address corrections 11/14/2019 CHON CHIO KUO
Applicant returned to address corrections 1/8/2020 CHON CHIO KUO
Applicant returned to address corrections 8/3/2020 CHON CHIO KUO
Applicant returned to address corrections 8/11/2020 CHON CHIO KUO
Plan Check Approved 8/11/2020 CHON CHIO KUO
Issued 9/2/2020 APPLICANT
CofO in Progress 9/20/2021 WILLIAM KUEHN
CofO Issued 1/8/2022 MICHAEL SMITH
Permit Finaled 1/8/2022 MICHAEL SMITH

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 1/8/2020 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 1/8/2020 LEE GUILBEAUX
ZA Case Cleared 1/8/2020 STEVEN WECHSLER
ZA Case Cleared 1/8/2020 STEVEN WECHSLER
ZA Case Cleared 1/8/2020 STEVEN WECHSLER
Hydrant and Access approval Cleared 2/19/2020 GEORGE SUCHAND
Specific Plan Cleared 5/11/2020 LAURA FRAZIN-STEELE
BHO/Hillside ordinance Cleared 6/10/2020 LEE GUILBEAUX
Sewer availability Cleared 6/10/2020 LEE GUILBEAUX
Grading Pre-Inspection Cleared 6/18/2020 BRIAN MILLER
Green Code Cleared 7/28/2020 CHON CHIO KUO

Contact Information

Contractor Highrise Inc; Lic. No.: 971653-B 10955 PENROSE ST      SUN VALLEY, CA 91352
Engineer Martirossyan,, Armen; Lic. No.: C64223 802 PORTOLA AVE      GLENDALE, CA 91206

Inspector Information

DAVID ANDERSON, (818) 374-1168 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 9/9/2020 Not Ready for Inspection PIERRE VEGA
METHANE-Barrier 9/9/2020 Not Ready for Inspection PIERRE VEGA
METHANE-Subgrade 9/9/2020 Not Ready for Inspection PIERRE VEGA
PLUMBING-Rough 9/9/2020 Not Ready for Inspection PIERRE VEGA
Excavation/Setback/Form/Re-Bar 9/14/2020 Approved BEAU COLLINS
Footing/Foundation/Slab 9/21/2020 Approved BEAU COLLINS
METHANE-Barrier 9/21/2020 Approved BEAU COLLINS
METHANE-Subgrade 9/21/2020 Approved BEAU COLLINS
Structural Steel Frame 9/21/2020 Approved BEAU COLLINS
Floor/Roof Diaphrgm/Shear Wall 12/1/2020 Approved BEAU COLLINS
BUILDING-Rough-Frame 12/15/2020 Approved BEAU COLLINS
ELECTRICAL-Rough 12/15/2020 Approved BEAU COLLINS
Green Building Rough 12/15/2020 Approved BEAU COLLINS
HVAC-Rough 12/15/2020 Approved BEAU COLLINS
MERV13>=Rough 12/15/2020 Approved BEAU COLLINS
METHANE-Rough 12/15/2020 Approved BEAU COLLINS
PLUMBING-Rough 12/15/2020 Approved BEAU COLLINS
Verify Sprinkler Sign Off 12/15/2020 Approved BEAU COLLINS
Interior/Exterior Lathing 12/29/2020 Approved BEAU COLLINS
Shower Pan 12/29/2020 Approved BEAU COLLINS
Drywall Nailing 1/19/2021 Approved BEAU COLLINS
Interior/Exterior Lathing 1/19/2021 Approved BEAU COLLINS
Final 7/28/2021 Corrections Issued WILLIAM KUEHN
Green Building Final 7/28/2021 Approved WILLIAM KUEHN
MERV13>=Final 7/28/2021 Approved WILLIAM KUEHN
SGSOV-Seismic Gas S/O Valve 7/28/2021 SGSOV Approved WILLIAM KUEHN
Service/Power Release 7/28/2021 Not Required WILLIAM KUEHN
Smoke Detectors 7/28/2021 Approved WILLIAM KUEHN
Final 8/27/2021 Corrections Issued WILLIAM KUEHN
ELECTRICAL-Final 9/17/2021 Approved WILLIAM KUEHN
Final 9/17/2021 OK to Issue CofO WILLIAM KUEHN
HVAC-Final 9/17/2021 Approved WILLIAM KUEHN
PLUMBING-Final 9/17/2021 Approved WILLIAM KUEHN
ELECTRICAL-Final 9/21/2021 Approved WILLIAM KUEHN
HVAC-Final 9/21/2021 Approved WILLIAM KUEHN
PLUMBING-Final 9/21/2021 Approved WILLIAM KUEHN