10132 N COMMERCE AVE #1-37 91042

Certificate Information: 10132 N COMMERCE AVE #1-37 91042

Application / Permit
19010-20000-04241
Plan Check / Job No.
B19VN16259
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
(N) 3-STORY TYPE V-A 37-UNIT AFFORDABLE HOUSING APARTMENT BUILDING (9 DENSITY BONUS UNITS W/ 4 VERY LOW & 2 LOW INCOME UNITS) OVER TYPE I-A BASEMENT PARKING GARAGE (NFPA-13 FIRE SPRINKLERS THROUGHOUT)
Permit Issued
Issued on 2/17/2021
Issuing Office
Current Status
CofO Issued on 1/2/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/24/2019 APPLICANT
Assigned to Plan Check Engineer 10/17/2019 NILOOFAR MEHRAIN
Disabled Access Plans Picked Up 10/29/2019 APPLICANT
Green Plans Picked Up 10/29/2019 APPLICANT
Corrections Issued 10/30/2019 NILOOFAR MEHRAIN
Quality Review Completed 10/31/2019 GUANG MIN TUNG
Building Plans Picked Up 11/5/2019 APPLICANT
Applicant returned to address corrections 8/11/2020 NILOOFAR MEHRAIN
Applicant returned to address corrections 11/6/2020 NILOOFAR MEHRAIN
Plan Check Approved 1/26/2021 NILOOFAR MEHRAIN
Issued 2/17/2021 APPLICANT
CofO in Progress 1/2/2024 DANNY RODRIGUEZ
CofO Issued 1/2/2024 RICKEY JACKSON
Permit Finaled 1/2/2024 RICKEY JACKSON

Permit Application Clearance Information

Address approval Cleared 11/18/2019 LEE GUILBEAUX
Encroachment in public way Cleared 11/18/2019 LEE GUILBEAUX
Work Adjacent to Public Way Cleared 11/18/2019 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 2/10/2020 APEKSHYA BAJRACHARYA
Trees in Parkway Cleared 5/20/2020 JOHN KIM
Building over 3-story or 36-ft Cleared 6/4/2020 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 6/4/2020 CALOSHA APPROVED
Hydrant and Access approval Cleared 7/17/2020 KURT CORRAL
Housing rent stabilization Cleared 8/3/2020 MICHAEL GREGERSON
GPI Written Notices Cleared 8/11/2020 NILOOFAR MEHRAIN
Grading Pre-Inspection Cleared 8/11/2020 NILOOFAR MEHRAIN
Highway dedication Cleared 8/24/2020 GABRIEL ROBLES
Density Bonus 12.22.A.25 Cleared 9/11/2020 MICHAEL ZIRBES
Sewer availability Cleared 9/28/2020 GABRIEL ROBLES
Fire Marshall Fire Life Safety Cleared 10/7/2020 VIDAL GARCIA
Low Impact Development Cleared 10/12/2020 ROBIN YAMADA
Roof/Waste drainage to street Cleared 10/15/2020 GABRIEL ROBLES
Permit Cleared 11/4/2020 ADRIAN CASTRO
DAS Clearance Cleared 11/19/2020 NILOOFAR MEHRAIN
Green Code Cleared 12/4/2020 DAVID MATSON
Frnt yard landscape/Water mgmt Cleared 1/15/2021 DANG NGUYEN
Miscellaneous Cleared 1/15/2021 DANG NGUYEN
Opn space landscape/Water mgmt Cleared 1/15/2021 DANG NGUYEN
Specific Plan Cleared 1/15/2021 DANG NGUYEN
ZI Cleared 1/15/2021 DANG NGUYEN

Contact Information

Contractor Owner-Builder       ,
Engineer Motavvef,, Nasser; Lic. No.: C40977 15335 MORRISON ST 370      SHERMAN OAKS, CA 91403

Inspector Information

JOHN KITCKO, (818) 374-1109 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/23/2021 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 4/7/2021 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 7/2/2021 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 7/8/2021 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 7/9/2021 Partial Approval DANIEL VARNUM
Deputy Reinf. Concrete 7/19/2021 Conditional Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 7/19/2021 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/20/2021 Conditional Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 7/21/2021 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 7/28/2021 Partial Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 7/29/2021 Partial Approval DANNY RODRIGUEZ
Deputy Shotcrete 7/30/2021 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 8/6/2021 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 8/6/2021 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Shotcrete 8/9/2021 Approved DANNY RODRIGUEZ
Reinforced Concrete Frame 8/9/2021 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 8/11/2021 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 8/19/2021 Conditional Approval DANIEL VARNUM
Deputy Reinf. Masonry 8/20/2021 Conditional Approval JEFFREY DURAN
Masonry Wall/Backfill 8/25/2021 Not Ready for Inspection DANNY RODRIGUEZ
Masonry Wall/Backfill 8/26/2021 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 9/2/2021 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/3/2021 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/8/2021 Approved JEFFREY DURAN
Footing/Foundation/Slab 9/8/2021 Not Ready for Inspection JEFFREY DURAN
Masonry Wall/Backfill 9/8/2021 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/10/2021 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/21/2021 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/22/2021 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/26/2021 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/27/2021 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 10/27/2021 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 10/29/2021 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 11/4/2021 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 11/5/2021 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 11/8/2021 Approved DANNY RODRIGUEZ
Deputy Wood Construction 12/22/2021 Conditional Approval KENNETH ROBERTS
Green Building Rough 12/23/2021 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 12/23/2021 Not Ready for Inspection JOHN KITCKO
Wood Frame 12/23/2021 Conditional Approval JOHN KITCKO
Deputy Wood Construction 2/2/2022 Conditional Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 2/8/2022 Partial Approval DANNY RODRIGUEZ
Green Building Rough 2/8/2022 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 2/8/2022 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 3/2/2022 Partial Inspection DANNY RODRIGUEZ
Drywall Nailing 3/4/2022 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 3/17/2022 Conditional Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 3/29/2022 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 3/30/2022 Partial Approval DANNY RODRIGUEZ
Green Building Rough 3/30/2022 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 3/30/2022 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Wood Construction 4/22/2022 Conditional Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 4/28/2022 Partial Inspection DANNY RODRIGUEZ
Green Building Rough 4/28/2022 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 4/28/2022 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 5/6/2022 Partial Inspection DANNY RODRIGUEZ
Green Building Rough 5/6/2022 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 5/6/2022 Partial Inspection DANNY RODRIGUEZ
Wood Frame 5/6/2022 Partial Inspection DANNY RODRIGUEZ
Deputy Wood Construction 5/9/2022 Conditional Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 5/11/2022 Partial Approval DANNY RODRIGUEZ
Green Building Rough 5/11/2022 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 5/11/2022 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 5/25/2022 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 5/25/2022 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 5/25/2022 Partial Approval DANNY RODRIGUEZ
Insulation 5/31/2022 Partial Approval DANNY RODRIGUEZ
Green Building Rough 6/7/2022 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 6/7/2022 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 6/7/2022 Partial Approval DANNY RODRIGUEZ
Insulation 6/9/2022 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 6/13/2022 Partial Approval DANNY RODRIGUEZ
Deputy Wood Construction 6/16/2022 Conditional Approval DANNY RODRIGUEZ
Green Building Rough 6/17/2022 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 6/17/2022 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 6/17/2022 Corrections Issued DANNY RODRIGUEZ
Green Building Rough 6/22/2022 Not Ready for Inspection DANNY RODRIGUEZ
Insulation 6/22/2022 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 6/22/2022 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 6/22/2022 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 6/28/2022 Partial Approval DANNY RODRIGUEZ
Green Building Rough 6/28/2022 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 6/28/2022 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 6/28/2022 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 7/1/2022 Partial Approval DANNY RODRIGUEZ
Insulation 7/1/2022 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 7/13/2022 Partial Approval ROBERT DAVIS
Drywall Nailing 7/20/2022 Partial Approval DANNY RODRIGUEZ
Green Building Rough 7/27/2022 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 7/27/2022 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 7/27/2022 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Drilled-In Anchors 7/29/2022 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 8/9/2022 Conditional Approval DANNY RODRIGUEZ
Green Building Rough 8/9/2022 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 8/9/2022 Partial Inspection DANNY RODRIGUEZ
Wood Frame 8/9/2022 Partial Inspection DANNY RODRIGUEZ
Green Building Rough 8/15/2022 Partial Inspection SORIN CIRSTOIU
Verify Sprinkler Sign Off 8/15/2022 Partial Inspection SORIN CIRSTOIU
Wood Frame 8/15/2022 Partial Approval SORIN CIRSTOIU
Insulation 8/19/2022 Partial Approval DANIEL VARNUM
Insulation 8/25/2022 Partial Approval DANNY RODRIGUEZ
Wood Frame 8/25/2022 Partial Approval DANNY RODRIGUEZ
Insulation 8/30/2022 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 9/20/2022 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 10/12/2022 Partial Approval DANNY RODRIGUEZ
Green Building Rough 10/27/2022 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 10/27/2022 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 10/27/2022 Partial Inspection DANNY RODRIGUEZ
Green Building Rough 11/4/2022 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 11/4/2022 Partial Inspection DANNY RODRIGUEZ
Wood Frame 11/4/2022 Partial Approval DANNY RODRIGUEZ
Green Building Rough 12/23/2022 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 12/23/2022 Partial Inspection DANNY RODRIGUEZ
Wood Frame 12/23/2022 Partial Approval DANNY RODRIGUEZ
Green Building Rough 12/29/2022 Not Ready for Inspection ANDREW DORSO
Verify Sprinkler Sign Off 12/29/2022 Partial Approval ANDREW DORSO
Wood Frame 12/29/2022 Partial Inspection ANDREW DORSO
Green Building Rough 1/3/2023 Not Ready for Inspection ANDREW DORSO
Verify Sprinkler Sign Off 1/3/2023 Partial Inspection ANDREW DORSO
Wood Frame 1/3/2023 Partial Inspection ANDREW DORSO
Interior/Exterior Lathing 1/11/2023 Partial Approval DANNY RODRIGUEZ
Insulation 1/18/2023 Partial Approval DANNY RODRIGUEZ
Light Gage Steel Frame 1/18/2023 Partial Approval DANNY RODRIGUEZ
Wood Frame 1/18/2023 Partial Approval DANNY RODRIGUEZ
Insulation 1/31/2023 Partial Approval DANNY RODRIGUEZ
Special/Order Compliance 1/31/2023 Partial Approval STEVEN LEVITT
Drywall Nailing 2/6/2023 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 2/13/2023 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 2/23/2023 Partial Approval DANNY RODRIGUEZ
Green Building Rough 2/23/2023 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 2/23/2023 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 2/23/2023 Partial Inspection DANNY RODRIGUEZ
Wood Frame 2/23/2023 Partial Approval DANNY RODRIGUEZ
Insulation 3/3/2023 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 3/15/2023 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 3/24/2023 Partial Inspection ANDREW DORSO
Interior/Exterior Lathing 4/10/2023 Partial Inspection DEANDRE HOFFMAN
Drywall Nailing 6/1/2023 Partial Approval KENNETH ROBERTS
Final 7/31/2023 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 7/31/2023 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 7/31/2023 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 7/31/2023 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 7/31/2023 Not Ready for Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 7/31/2023 SGSOV Not Ready DANNY RODRIGUEZ
Smoke Detectors 7/31/2023 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 7/31/2023 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 7/31/2023 Not Ready for Inspection DANNY RODRIGUEZ
Pre-Inspection 8/8/2023 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 8/9/2023 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 8/9/2023 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 8/9/2023 Not Ready for Inspection DANNY RODRIGUEZ
Pre-Inspection 8/9/2023 Partial Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 8/9/2023 Not Ready for Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 8/9/2023 SGSOV Not Ready DANNY RODRIGUEZ
Smoke Detectors 8/9/2023 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 8/9/2023 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 8/9/2023 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 10/23/2023 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 10/23/2023 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 10/23/2023 Not Ready for Inspection DANNY RODRIGUEZ
Final 10/25/2023 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 10/25/2023 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 10/25/2023 Not Ready for Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 10/25/2023 SGSOV Not Ready DANNY RODRIGUEZ
Smoke Detectors 10/25/2023 Not Ready for Inspection DANNY RODRIGUEZ
T-Bar Ceiling 10/25/2023 Approved DANNY RODRIGUEZ
Final 11/14/2023 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 11/14/2023 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 11/14/2023 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 11/14/2023 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 11/14/2023 Not Ready for Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 11/14/2023 SGSOV Not Ready DANNY RODRIGUEZ
Smoke Detectors 11/14/2023 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 11/14/2023 Partial Inspection DANNY RODRIGUEZ
Wood Frame 11/14/2023 Not Ready for Inspection DANNY RODRIGUEZ
Final 11/21/2023 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 11/21/2023 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Final 11/21/2023 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 11/21/2023 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 11/21/2023 Not Ready for Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 11/21/2023 SGSOV Not Ready DANNY RODRIGUEZ
Smoke Detectors 11/21/2023 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 11/21/2023 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 11/21/2023 Not Ready for Inspection DANNY RODRIGUEZ
Final 12/8/2023 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 12/8/2023 Approved DANNY RODRIGUEZ
Green Building Final 12/8/2023 Approved DANNY RODRIGUEZ
Green Building Rough 12/8/2023 Approved DANNY RODRIGUEZ
Reinforced Concrete Frame 12/8/2023 Partial Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 12/8/2023 SGSOV Not Ready DANNY RODRIGUEZ
Smoke Detectors 12/8/2023 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 12/8/2023 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 12/8/2023 Partial Inspection DANNY RODRIGUEZ
Final 12/11/2023 Partial Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 12/13/2023 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 12/13/2023 Not Ready for Inspection DANNY RODRIGUEZ
Final 12/14/2023 OK to Issue CofO DANNY RODRIGUEZ
Reinforced Concrete Frame 12/14/2023 Partial Inspection DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 12/14/2023 SGSOV Approved DANNY RODRIGUEZ
Smoke Detectors 12/14/2023 Approved DANNY RODRIGUEZ
Reinforced Concrete Frame 1/2/2024 Approved DANNY RODRIGUEZ
Verify Sprinkler Sign Off 1/2/2024 Approved DANNY RODRIGUEZ
Wood Frame 1/2/2024 Approved DANNY RODRIGUEZ