20747 W PINECONE CIR UNIT #9 91326

Certificate Information: 20747 W PINECONE CIR UNIT #9 91326

Application / Permit
19010-20000-03014
Plan Check / Job No.
B19VN11679
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(35) Condo-Single Family
Work Description
TWO STORY SFD-CONDO WITH ATTACH 2 CAR GARAGE (STANDARD PLAN #647-PLAN 2C) _ BUILDING SHALL BE FULLY SPRINKLER THROUGH OUT WITH NFPA 13D
Permit Issued
Issued on 12/17/2019
Issuing Office
Valley
Current Status
CofO Issued on 10/20/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/16/2019 APPLICANT
Assigned to Plan Check Engineer 8/1/2019 DAWN MC NULTY
Green Plans Picked Up 8/5/2019 APPLICANT
Corrections Issued 8/19/2019 DAWN MC NULTY
Quality Review Completed 8/21/2019 CHON CHIO KUO
Building Plans Picked Up 8/27/2019 APPLICANT
Plan Check Approved 12/12/2019 DAWN MC NULTY
Issued 12/17/2019 LADBS
CofO in Progress 10/16/2020 SEAN WIRCH
Permit Finaled 10/20/2020 DONALD SUNSERI
CofO Issued 10/20/2020 DONALD SUNSERI
Permit Finaled 10/20/2020 DONALD SUNSERI

Permit Application Clearance Information

Low Impact Development Cleared 10/16/2019 AMMAR ELTAWIL
Hydrant and Access approval Cleared 10/31/2019 ROBERT DUFF
"T" removal Cleared 11/5/2019 SARAH GOLDMAN
CPC Cleared 11/5/2019 SARAH GOLDMAN
Miscellaneous Cleared 11/5/2019 SARAH GOLDMAN
Miscellaneous Cleared 11/5/2019 SARAH GOLDMAN
Private street Cleared 11/5/2019 SARAH GOLDMAN
Specific Plan Cleared 11/5/2019 SARAH GOLDMAN
Tract Map conditions Cleared 11/5/2019 SARAH GOLDMAN
ZA Case Cleared 11/5/2019 SARAH GOLDMAN
ZA Case Cleared 11/5/2019 SARAH GOLDMAN
ZI Cleared 11/5/2019 SARAH GOLDMAN
Address approval Cleared 11/21/2019 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 11/21/2019 LEE GUILBEAUX
Permit Cleared 11/21/2019 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 11/21/2019 LEE GUILBEAUX
Sewer availability Cleared 11/21/2019 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 11/21/2019 LEE GUILBEAUX
Public Works-Open Permits Cleared 11/21/2019 LEE GUILBEAUX
Green Code Cleared 12/10/2019 MICHAEL AYERS

Contact Information

Architect Falese, Debra Suzanne; Lic. No.: C24900 2943 PULLMAN SUITE A      SANTA ANA, CA 92705
Contractor Shapell Homes Inc; Lic. No.: 1001034-B 250 GIBRALTAR RD   ATTN: GATES/LEGAL    HORSHAM, PA 19044
Engineer Hattar, Basil Ibrahim; Lic. No.: GE2734 3525 PARK MEADOW CT      PALMDALE, CA 93551
Engineer Kim, Kevin Chae; Lic. No.: C53821 2349 N CAMPUS AVENUE      UPLAND, CA 91784
Engineer Nelson, William Mc Kee; Lic. No.: S3417 5 DELLWOOD      DOVE CANYON, CA 92679
Engineer Wong, Ramon Roman Ii; Lic. No.: S2345 1800 E. 16TH STREET      SANTA ANA, CA 92701
Geologist Berger, Susan Michele; Lic. No.: EG2069 3153 FOX HOLLOW DRIVE SE      SALEM, OR 97317

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Underground Mechanical 3/4/2020 Approved SEAN WIRCH
Footing/Foundation/Slab 4/1/2020 Approved DONALD SUNSERI
Sewer 4/16/2020 Approved SEAN WIRCH
Floor/Roof Diaphrgm/Shear Wall 4/29/2020 Approved SEAN WIRCH
Underground Mechanical 5/1/2020 Approved SEAN WIRCH
Floor/Roof Diaphrgm/Shear Wall 5/21/2020 Approved SEAN WIRCH
Underground Mechanical 6/3/2020 Approved SEAN WIRCH
Deputy Wood Construction 6/10/2020 Approved SEAN WIRCH
Floor/Roof Diaphrgm/Shear Wall 6/12/2020 Approved SEAN WIRCH
BUILDING-Rough-Frame 7/13/2020 Approved SEAN WIRCH
ELECTRICAL-Rough 7/13/2020 Approved SEAN WIRCH
Green Building Rough 7/13/2020 Approved SEAN WIRCH
HVAC-Rough 7/13/2020 Approved SEAN WIRCH
PLUMBING-Rough 7/13/2020 Approved SEAN WIRCH
Verify Sprinkler Sign Off 7/13/2020 Approved SEAN WIRCH
Drywall Nailing 7/21/2020 Approved JOSEPH SAGEN
Interior/Exterior Lathing 7/21/2020 Partial Approval JOSEPH SAGEN
Gas Test 8/18/2020 Approved SEAN WIRCH
Interior/Exterior Lathing 8/21/2020 Approved SEAN WIRCH
SGSOV-Seismic Gas S/O Valve 8/21/2020 SGSOV Approved SEAN WIRCH
Service/Power Release 9/11/2020 Approved SEAN WIRCH
ELECTRICAL-Final 10/9/2020 Approved SEAN WIRCH
Final 10/9/2020 Corrections Issued SEAN WIRCH
Green Building Final 10/9/2020 Approved SEAN WIRCH
HVAC-Final 10/9/2020 Approved SEAN WIRCH
PLUMBING-Final 10/9/2020 Approved SEAN WIRCH
Smoke Detectors 10/9/2020 Approved SEAN WIRCH
ELECTRICAL-Final 10/16/2020 Approved SEAN WIRCH
Final 10/16/2020 OK to Issue CofO SEAN WIRCH
HVAC-Final 10/16/2020 Approved SEAN WIRCH
PLUMBING-Final 10/16/2020 Approved SEAN WIRCH